Skip to content
The Consortium

GRA · Finance and insurance readiness

Spatial financeWhere capital meets hazard, exposure and transition

Disaster risk finance

Governments often pay for disasters after the event, from budgets built for other purposes. The Global Risks Alliance (GRA) has designed a disaster risk finance service for finance ministries and disaster-risk agencies. It describes fiscal exposure and how each layer of risk, frequent to rare, could be retained or transferred, with every assumption stated. It makes no financing commitment, gives no advice on instruments or providers, and promises no disbursement. Part of Finance and insurance readiness.

02The service

Problem, work, and what each side brings.

ElementAs designed
ForFinance ministries and disaster-risk agencies
ProblemGovernments pay for disasters after the event, from budgets built for other purposes
WorkDescribe fiscal exposure and how different layers of risk could be retained or transferred
You receiveA risk-layering and fiscal-exposure analysis with its assumptions
You contributePublic asset, budget and loss data
NeverA financing commitment, advice on issuing securities or on choosing an instrument or provider, or a promise of disbursement
03Spatial finance

A parametric trigger, read on the map.

How a storm crossing a trigger zone would set a payment. Real geography; synthetic storm and design terms.

Parametric trigger: a cyclone crossing the trigger zone

Replay a storm past Jamaica and compare what a box trigger and a cell damage index would pay, then test both designs on a 41-storm ensemble.

  • RegionJamaica
  • PerilTropical cyclone
  • Ensemble41 storms
  • Storm at T+120 h
    80knots
    Category 1
  • Box trigger pays
    0.50of the limitTier 2
  • Cell index pays
    1.00of the limitTier 3
  • Basis gap, box
    −0.50of the limit
    Pays short of the modelled loss
DesignCellsEnsemble

Storm over the island

Peak wind reached in each cell so far, against the trigger box

Reference storm, T+120 h

  • Peak wind so far, m/s
  • 26 to 33
  • 33 to 42
  • 42 to 50
  • 50 to 58
  • 58 and above
  • Track, six-hourly
  • Trigger box
  • Ensemble storms

Event replay

Maximum wind along the track; shaded while the centre is inside the box

Category 3Category 4Category 5T+0 hT+24 hT+48 hT+72 hT+96 hT+120 h6496113137Maximum wind, knots
T+120 h

Two trigger designs, one storm

Readings and payments at the replay time

At this stepBoxCell indexIndex minus box
ReadingCat 40.245
Tier23
Payment, share of limit0.501.00+0.50
Modelled loss supports1.001.00
Basis gap−0.50+0.00

Payment schedule

Selected design; the dot is this storm

012345Strongest category in the box0.000.250.500.751.00Share of limit0.50

Basis risk across the ensemble

Rows: tier the modelled loss supports. Columns: tier paid. 1 of 41 storms pay below it, 12 above.

NoneTier 1Tier 2Tier 3Tier 3 loss17Tier 21Tier 1111No tier20342

Payment against modelled loss

Each dot is a storm; select one to replay it

Paid beyond the lossLoss beyond the payment0.000.250.500.751.00Share the modelled loss supports0.000.501.00Share paid
How this figure works

A synthetic reference storm and a 40-storm design ensemble cross real Jamaican geography on hexagonal cells. Peak wind per cell accumulates over six-hourly steps; a damage form converts wind to a damage ratio on design exposure. The box trigger and the cell index read the same storm. Synthetic storms and design terms, not a policy or a price.

Sources: Natural Earth (public domain); GEBCO Compilation Group (2020) GEBCO 2020 Grid (doi:10.5285/a29c5465-b138-234d-e053-6c86abc040b9), relief (public domain, not for navigation); Design scenario values by the Global Risks Alliance (illustrative, not data).

A tropical cyclone passing Jamaica, read against two ways of triggering a payment.Synthetic storm and design terms, not a policy or a price.
04Risk layering

Instruments by layer, as the literature describes them.

Return-period bands are illustrative and vary by country; they are not a recommendation. The competent authority chooses layers with its own advisers.

LayerTypical return periods (illustrative)Instruments usually discussed
Retained, frequentUp to about 1-in-5 yearsBudget contingency lines, reserve funds, reallocation
Retained, less frequentAbout 1-in-5 to 1-in-20 yearsContingent credit such as Cat DDOs, regional and national reserve funds
Transferred, severeAbove about 1-in-20 yearsParametric insurance through regional pools, indemnity reinsurance, catastrophe bonds
ResidualBeyond transferred limitsEx post borrowing, budget cuts, international assistance
05Parametric design

Triggers, basis risk and the map.

A parametric cover pays when an index crosses a threshold: modelled loss from wind speed inside a defined area, rainfall deficit over a season, earthquake intensity at named points. It pays quickly because no loss adjustment is needed. The cost is basis risk: the gap between the index payment and the actual loss. Basis risk is read on the map, by comparing trigger zones with where exposure sits. It is read in time too, by replaying historical events such as IBTrACS storm tracks or CHIRPS rainfall against the trigger.

Regional pools such as CCRIF SPC, African Risk Capacity and PCRIC, and World Bank catastrophe bonds, publish their structures. GRA describes them from those public records and never advises on choosing one. Specialist work continues at Disaster Risk Finance; hazard evidence at the Global Centre for Risk and Innovation (GCRI) anticipatory action.

06Different layers of risk

Different layers of risk raise different questions.

  1. 01

    Frequent, smaller events

    Which losses recur often enough that a public budget already absorbs them, and what that costs over time?

  2. 02

    Less frequent, larger events

    Where would reserves or contingent arrangements be exhausted, and what would follow in spending, borrowing or delayed recovery?

  3. 03

    Rare, severe events

    Which losses exceed any domestic capacity, and what share falls on households, firms and the public balance sheet?

  4. 04

    Across all layers

    Who carries the residual loss, and what data would change the picture most?

These are analytical questions with stated assumptions. Which layer to retain or transfer, and how, is decided by the competent public authority with its own advisers.

07Evidence

What the analysis depends on.

Hazard

From the science

Hazard and exposure evidence from The Global Centre for Risk and Innovation (GCRI), with its methods and uncertainty; see Disaster Resilience.

Fiscal

From the authority

Public asset, budget and loss data, cited to its owner. Fiscal context is described on Sovereign fiscal context.

Gaps

What is uninsured

Protection-gap evidence, separating measured, estimated and unknown losses; see Protection gaps.

09Questions

Questions and answers.

Will GRA recommend an insurance or risk-transfer product?
No. GRA never advises on issuing securities or on choosing an instrument or provider, and recommends no insurer, lender or investor.
Is the analysis a forecast of disaster losses?
No. It uses scenarios and modelled estimates, each labelled as such, with assumptions stated. A scenario is never presented as a forecast of loss.
Where is GRA’s specialist community for this field?
The community is part of Disaster Risk Finance, a platform within the specialist financial network.
How does a ministry start?
Write to the readiness assessment form describing the question and the data you hold, without attaching confidential data. Country programme enquiries go to the Consortium Secretariat at the contact form.
The Global Risks Alliance

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.