GRA · Global engagement
Regional programmes
Six programme regions, with fifteen planned hubs that are coordination roles, not offices. Each region shares systems that cross borders: river basins, power networks, trade corridors, digital infrastructure. The Global Risks Alliance (GRA) sets out the questions that the financial institutions and public finance authorities of each region would ask. All six programmes are in formation. Part of Global engagement.
The financial questions each region is designed to address.
- AfricaFinancial questions in the registrySovereign exposure to drought, flood and commodity shocks; agricultural and infrastructure protection gaps
- Asia and the PacificFinancial questions in the registryCatastrophe and protection-gap questions; electronics supply-chain concentration; compute concentration in financial infrastructure
- Europe and EurasiaFinancial questions in the registryClimate-related questions for energy and real estate; technology concentration in market infrastructure; heat, flood and wildfire gaps
- Latin America and the CaribbeanFinancial questions in the registrySovereign catastrophe risk for small island states; adaptation readiness; commodity-price transmission into public finances
- Middle East and North AfricaFinancial questions in the registryEnergy-transition exposure in public balance sheets; trade-finance and maritime-insurance questions
- North AmericaFinancial questions in the registryInsurance availability for wildfire, flood and hurricane; climate questions for utilities and municipalities
A parametric trigger, read on the map.
How a storm crossing a trigger zone would set a payment. Real geography; synthetic storm and design terms.
Parametric trigger: a cyclone crossing the trigger zone
Replay a storm past Jamaica and compare what a box trigger and a cell damage index would pay, then test both designs on a 41-storm ensemble.
- RegionJamaica
- PerilTropical cyclone
- Ensemble41 storms
- Storm at T+120 h80knotsCategory 1
- Box trigger pays0.50of the limitTier 2
- Cell index pays1.00of the limitTier 3
- Basis gap, box−0.50of the limitPays short of the modelled loss
Storm over the island
Peak wind reached in each cell so far, against the trigger box
Reference storm, T+120 h
- Peak wind so far, m/s
- 26 to 33
- 33 to 42
- 42 to 50
- 50 to 58
- 58 and above
- Track, six-hourly
- Trigger box
- Ensemble storms
Event replay
Maximum wind along the track; shaded while the centre is inside the box
Two trigger designs, one storm
Readings and payments at the replay time
Payment schedule
Selected design; the dot is this storm
Basis risk across the ensemble
Rows: tier the modelled loss supports. Columns: tier paid. 1 of 41 storms pay below it, 12 above.
Payment against modelled loss
Each dot is a storm; select one to replay it
How this figure works
A synthetic reference storm and a 40-storm design ensemble cross real Jamaican geography on hexagonal cells. Peak wind per cell accumulates over six-hourly steps; a damage form converts wind to a damage ratio on design exposure. The box trigger and the cell index read the same storm. Synthetic storms and design terms, not a policy or a price.
Sources: Natural Earth (public domain); GEBCO Compilation Group (2020) GEBCO 2020 Grid (doi:10.5285/a29c5465-b138-234d-e053-6c86abc040b9), relief (public domain, not for navigation); Design scenario values by the Global Risks Alliance (illustrative, not data).
Regional risk pools on the public record.
Pools pool risk across members, which lowers the cost of transfer. GRA has no role in any pool.
| Region | Pool |
|---|---|
| Caribbean and Central America | CCRIF SPC |
| Africa | African Risk Capacity |
| Pacific | PCRIC |
| Southeast Asia | SEADRIF |
Each pool publishes how its triggers are defined, which members participate and how contingency plans govern the use of funds. GRA reads those public records beside hazard maps to show, region by region, where basis risk and uncovered losses remain.
How the process runs.
Process explorer · Process
Regional programmes: Working group, charter to sunset
9 steps·4 stages·1 gate
Process
Regional programmes: Working group, charter to sunset
A working group is chartered by record for a fixed timebox, delivers bounded assignments, drafts and recommends, then dissolves unless renewed; it does not adopt.
01 Form
- 01NLC proposes the groupDecision · National Leadership CouncilThe NLC proposes working groups and nominates chairs, editors and experts from its leadership pools. It does not charter.
- 02Charter by recordDecision · National Standards CouncilA working group is chartered by record for a timebox of at most twenty-four months. The charter sets its scope, roles and decision rule.
- 03Members join by competenceStep · MembersExperts, practitioners, students and volunteers join by competence. Members declare interests and recuse on conflict.
02 Work
- 04Workplan from the national agendaStepAssignments come from the national agenda and the year’s missions. Each states the competence it needs and how the work will be reviewed.
- 05Drafts and deliverables, delivered monthlyRecordGroups deliver monthly. For standards they draft the national profile and deviation register and run national public comment and pilots.
03 Review
- 06Contribution record and reviewGateEach contribution is recorded and reviewed. A working group drafts and recommends; it does not adopt.
- 07Recognition follows the recordRecordContribution records are kept, so that recognition follows the record.
- 08National adoption is decided elsewhereDecision · National Standards CouncilThe National Standards Council decides the adoption mode and the national profile. The working group proposes and never decides.
04 Close
- 09Dissolved by default, or renewed by recordDecision · National Standards CouncilA group is dissolved by default at the end of the timebox. The National Standards Council renews or closes it, on the NLC’s proposal.
National Working Groups · National Standards Council · Decision rights · Service level · R0Designed programme process, not a record of operation. No cycle has run. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No working group is constituted. The charter rules belong to the proposed Nexus Standards working model.
How GRA reads a regional system.
- 01
Start from the shared system
A basin, a power pool, a corridor or a cable route, as the regional evidence describes it, with its owners and limits.
- 02
Trace financial transmission
Which sovereign, banking, insurance and investor balance sheets depend on it, and through which channels.
- 03
Record what is missing
Exposure data, insured values or counterparty maps that a competent institution would need, written down openly.
- 04
Keep national control
Each country keeps control of its data and its decisions; regional comparison never merges data or authority.
In formation, and stated as such.
- All six regional programmes are in formation. Only North America has a recorded host: The Global Centre for Risk and Innovation (GCRI), as Consortium Secretariat in Toronto.
- The fifteen hubs are planned coordination roles; a planned hub is not an operating site.
- Countries in a region are research coverage, not GRA members, offices or partners.
- Some countries take part in two regions: North African states in Africa and the Middle East and North Africa, and Mexico in North America and Latin America and the Caribbean.
The same regions across the Consortium.
Regional evidence
Shared-system evidence and country coverage from GCRI: Six programme regions.
Regional dialogue
Regional cooperation convened by The Global Risks Forum (GRF): Regional cooperation.
Regional desks
Regional enquiries go to the regional desks of the Consortium Secretariat, which are listed on each region page, or to the contact form.
Where this page’s references lead.
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
Questions and answers.
Does GRA operate in these regions?
Who hosts a regional programme?
Are the financial questions findings?
Bring an exposure or capital question to the Alliance.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Legal documents.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.