GRA · Pembayaran dan Infrastruktur Pasar
Keuangan spasialTempat modal bertemu bahaya, keterpaparan, dan transisi
Ketahanan dan kesiapan pembiayaan
Infrastructure readiness asks whether a payment system, central counterparty or settlement chain could keep its critical functions through a physical, operational or cyber shock, and what evidence an overseer would need to judge that. Payments and Market Infrastructure, a the Global Risks Alliance (GRA) platform, prepares dependency and site evidence and frames the questions. Oversight stays with central banks and regulators.
Resilience and finance readiness in five parts.
Readiness is not approval.
A readiness file describes a programme’s evidence, risks and governance so that an institution can carry out its own review. GRA does not approve, rate, underwrite, lend or invest, and it recommends no counterparty.
The principles an FMI is assessed against.
| Principle group | Contoh |
|---|---|
| Risiko kredit dan likuiditas | Agunan, margin, dan sumber daya likuiditas untuk gagal bayar peserta terbesar |
| Settlement | Settlement finality, money settlement, delivery versus payment |
| Manajemen gagal bayar | Rules and procedures, segregation and portability |
| General business and risiko operasional | Kelangsungan usaha, pemulihan operasi kritis, ketahanan siber |
| Akses dan transparansi | Participation requirements, disclosure of rules and data |
Bagaimana proses berjalan.
Process explorer · Process
Resilience and finance readiness: Payment from instruction to finality
8 langkah·4 tahap
Proses
Resilience and finance readiness: Payment from instruction to finality
Sistem RTGS memeriksa pembayaran, memasukkannya ke antrean jika dana kurang, menyelesaikannya secara bruto dan real time, serta memberikan penyelesaian final.
01 Penerimaan
- 01Payment instructionSource · ParticipantThe system should use, or at least accommodate, relevant internationally accepted communication procedures and standards.
- 04Validity and conditionality checksStep · System operatorPembayaran diterima setelah lolos pemeriksaan validitas dan persyaratan, seperti dana atau kredit. Pembayaran yang tidak valid umumnya ditolak.
02 Penyelesaian
- 02LikuiditasSet data · PesertaParticipants need liquidity for outgoing payments: central or commercial bank balances, incoming payments and intraday credit.
- 05QueueModel · System operatorPembayaran valid yang tidak lolos pemeriksaan persyaratan dimasukkan ke antrean atau ditolak. Antrean dan alat penghemat likuiditas lainnya dapat mengurangi kebutuhan likuiditas.
- 06Settle in real time, grossStep · System operatorRTGS settles payments continuously, without deferral, usually one by one. Money settlements should use central bank money where practical.
03 Finalitas
- 07Final settlementRecord · System operatorThe system gives clear, certain final settlement by the end of the value date at least, intraday or real time where needed.
- 08ReconciliationStep · System operatorReconciliation checks that records issued by two different entities match. The pages read state no timing for payment Sistem.
04 Ketahanan
- 03Kelangsungan usaha dan situs sekunderExercise · System operatorThe plan uses a secondary site and aims to resume critical IT within two hours and settle by end of day. Arrangements are regularly tested.
Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval. The source is the CPMI-IOSCO Principles for financial market infrastructures. A business continuity plan covers disruption.
The two-hour planning objective.
Panduan siber CPMI-IOSCO meminta FMI merencanakan pemulihan operasi kritis dalam dua jam setelah gangguan dan menuntaskan penyelesaian pada akhir hari, bahkan dalam skenario ekstrem tetapi masuk akal. Bukti kesiapan mendokumentasikan geografi lokasi, diversitas daya dan jaringan terhadap sasaran tersebut. Pendalaman topik di kliring dan penyelesaian.
Who sees a readiness file.
A file is released only at the programme owner’s written direction, to a party the owner chooses, with no fee tied to any transaction.
Where this page’s references lead.
Badan dan dokumen yang menjadi acuan halaman ini. Status dan edisi berubah; setiap tautan menuju badan penerbitnya.
Pages in Resilience and finance readiness.
Tanya jawab.
Does a readiness file mean finance is available?
Ajukan pertanyaan eksposur atau modal kepada Aliansi.
Informasi dan pertanyaan sudah terbuka hari ini. Sebuah pertanyaan menerima nomor referensi dan menyebutkan langkah berikutnya; lamaran, pembayaran, alokasi komputasi, dan pendaftaran hanya dibuka ketika tim, ketentuan, dan kapasitas tinjauannya tersedia.
Dokumen hukum.
Peta, data, dan gambar di situs ini ditampilkan untuk konteks dan informasi umum. Semua itu bukan nasihat, prakiraan, atau peringatan; batasan informasinya dijelaskan dalam Penafian dan Pemberitahuan Data.