GRA · پرداختها و زیرساخت بازار
مالی فضاییجایی که سرمایه به مخاطره، مواجهه و گذار برمیخورد
تابآوری و آمادگی مالی
Infrastructure readiness asks whether a payment system, central counterparty or settlement chain could keep its critical functions through a physical, operational or cyber shock, and what evidence an overseer would need to judge that. Payments and Market Infrastructure, a the Global Risks Alliance (GRA) platform, prepares dependency and site evidence and frames the questions. Oversight stays with central banks and regulators.
Resilience and finance readiness in five parts.
Readiness is not approval.
A readiness file describes a programme’s evidence, risks and governance so that an institution can carry out its own review. GRA does not approve, rate, underwrite, lend or invest, and it recommends no counterparty.
The principles an FMI is assessed against.
| Principle group | نمونهها |
|---|---|
| Credit and ریسک نقدینگی | Collateral, margin, liquidity resources for the largest participant defaults |
| Settlement | Settlement finality, money settlement, delivery versus payment |
| Default management | Rules and procedures, segregation and portability |
| General business and ریسک عملیاتی | Business continuity, recovery of critical operations, cyber resilience |
| Access and transparency | Participation requirements, disclosure of rules and data |
نحوهٔ اجرای فرایند.
Process explorer · Process
Resilience and finance readiness: Payment from instruction to finality
8 گام·4 مرحله
فرایند
Resilience and finance readiness: Payment from instruction to finality
An RTGS system checks a payment, queues it if funds are short, settles it gross in real time and gives final settlement.
01 پذیرش
- 01Payment instructionSource · ParticipantThe system should use, or at least accommodate, relevant internationally accepted communication procedures and standards.
- 04Validity and conditionality checksStep · System operatorA payment is accepted once it passes validity and conditionality checks, such as funds or credit. An invalid payment is generally rejected.
02 Settlement
- 02نقدینگیDataset · ParticipantParticipants need liquidity for outgoing payments: central or commercial bank balances, incoming payments and intraday credit.
- 05QueueModel · System operatorA valid payment that fails conditionality checks is queued or rejected. Queuing and other liquidity-saving tools can cut liquidity needs.
- 06Settle in real time, grossStep · System operatorRTGS settles payments continuously, without deferral, usually one by one. Money settlements should use central bank money where practical.
03 Finality
- 07Final settlementRecord · System operatorThe system gives clear, certain final settlement by the end of the value date at least, intraday or real time where needed.
- 08ReconciliationStep · System operatorReconciliation checks that records issued by two different entities match. The pages read state no timing for payment سامانهها.
04 Resilience
- 03Business continuity and secondary siteExercise · System operatorThe plan uses a secondary site and aims to resume critical IT within two hours and settle by end of day. Arrangements are regularly tested.
Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval. The source is the CPMI-IOSCO Principles for financial market infrastructures. A business continuity plan covers disruption.
The two-hour planning objective.
CPMI-IOSCO cyber guidance asks FMIs to plan to resume critical operations within two hours of a disruption and to complete settlement by the end of the day, even in extreme but plausible scenarios. Readiness evidence documents site geography, power and network diversity against that objective. Topic depth at clearing and settlement.
Who sees a readiness file.
A file is released only at the programme owner’s written direction, to a party the owner chooses, with no fee tied to any transaction.
Where this page’s references lead.
نهادها و اسنادی که این صفحه بر پایهٔ آنها خوانده میشود. وضعیت و ویراستها تغییر میکنند؛ هر پیوند به نهاد صادرکننده میرود.
Pages in Resilience and finance readiness.
پرسش و پاسخ.
Does a readiness file mean finance is available?
یک پرسش دربارهٔ مواجهه یا سرمایه را نزد اتحاد مطرح کنید.
اطلاعات و درخواستها امروز باز است. هر درخواست یک شمارهٔ پیگیری میگیرد و گام بعدی را مشخص میکند؛ درخواستهای عضویت، پرداختها، تخصیص رایانش و ثبتنامها تنها زمانی باز میشوند که تیم، شرایط و ظرفیت داوری آنها فراهم باشد.
اسناد حقوقی.
نقشهها، دادهها و ارقام این سایت برای زمینه و اطلاعات عمومی نشان داده میشوند. توصیه، پیشبینی یا هشدار نیستند؛ حدود این اطلاعات در سلب مسئولیتها و اعلامیههای داده بیان شده است.