The Global Risks Alliance (GRA)
The mission themes Disaster Risk Finance brings to the annual Nexus Universe programme, governed by The Global Risks Forum, with its own website at universe.nexus.
Layering workshop · Day 2 of 5 · Controlled · observed
| Ministry of finance | 5 | 46 | Active |
| Disaster management authority | 4 | 47 | Active |
| Calculation agent | 5 | 59 | Delayed |
| Social protection agency | 4 | 51 | Delayed |
Disaster Risk Finance · Exercise controlExercise control, in outline: domain structure with placeholder names and illustrative values, not a record.
Testing in Nexus Universe is how Disaster Risk Finance brings work to the annual programme governed by The Global Risks Forum, with its own site at universe.nexus. Its proposed mission theme is pre-arranged finance for anticipatory action. Selected work is tested under controlled conditions, reviewed and published with its limits; a theme is a proposal, not a confirmed exercise.
Fig.A programme from scoping to the owner's decision. Design, not a record.
For test in nexus universe, in GRA's spatial-finance reading, the map opens on population density, night lights and flood water with built-up and settlement extent from NASA GIBS, framed on Pacific Island states; 3 further NASA layers wait in the list.
The interactive map needs JavaScript; the layer list and sources are below.
Layers 3
Hazards now, for this page
Keyboard, with the map focused
Hold Ctrl or ⌘ and scroll to zoom
Latest available
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth
Loading the latest NASA imagery.
Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.
For test in nexus universe, in GRA's spatial-finance reading, the map opens on population density, night lights and flood water with built-up and settlement extent from NASA GIBS, framed on Pacific Island states; 3 further NASA layers wait in the list.Satellite and model products as NASA publishes them, each with its own date; indicators, not assessments of any place; claim ceiling INTEGRATED.
Layers and dates
Proposed for controlled testing in the annual programme; a theme is not a confirmed exercise.
| Exercise | Injects designed by Disaster Risk Finance |
|---|---|
| Pre-arranged finance for anticipatory action | a trigger is missed despite damage, contingent credit draws and an anticipatory payment goes out before landfall |
Nexus Universe is governed by GRF; see exercises and learning. Disaster Risk Finance injects use synthetic values.
Disaster Risk Finance exercises test fiscal disaster risk and its financing layers, with decisions left to the participants who hold them, such as humanitarian anticipatory-action specialists.
Selected work is tested under controlled conditions, reviewed and then published with its limits. Results that pass go to Nexus Reports. The planned stand-down of each edition keeps review, reconciliation and corrections going after the event.
Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.
| Term | Definition |
|---|---|
| Mission theme | A subject a platform proposes for controlled testing in the annual Nexus Universe programme; a theme is a proposal until the programme confirms an exercise. |
| Simulation exercise | A practice, training or evaluation activity in which an emergency is described or simulated and participants respond as they would in reality, so that plans and capacities can be tested, as WHO's exercise manual describes. |
| Tabletop exercise | A discussion-based exercise in which participants talk through decisions in response to a scenario. |
| After-action review | A structured discussion after an activity of what was planned, what happened, why, and what to change. |
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.