Skip to content

GRA · Banking Nexus

Spatial financeLà où le capital rencontre l'aléa, l'exposition et la transition

Résilience et préparation financière

Banking readiness asks what a lender’s credit, collateral and continuity teams would need to see before a programme, a region or a sector can be assessed on their own terms. Banking Nexus prepares hazard, collateral and dependency evidence and frames the diligence questions. It never sets lending terms, assesses a borrower or states that anything is fit for credit.

01Espace de travail

L'espace de travail de la résilience et de la préparation financière.

Climate risk in the book

Mortgage book · Scenario: delayed transition · Example interface, not a record

Flood-exposed collateral risingGRA · Banking Nexus

Collateral and flood hazard

geocoded collateral · illustrative

Taille du cercle : valeur d'exposition · exempleN

Exposure by hazard band

Élevé41516885
Moyen429212875
Faible18,747168059
Climate risk in the book.Interface illustrative ; pas de données en direct.

Banking Nexus · Climate risk in the book. Climate risk in the book: example names and illustrative values, not a record.

02Préparation

La préparation n'est pas une approbation.

A readiness file describes a programme’s evidence, risks and governance so that an institution can carry out its own review. The Global Risks Alliance (GRA) does not approve, rate, underwrite, lend or invest, and it recommends no counterparty.

03Credit committee lens

What a lender reads in a resilience programme.

A readiness file arranges this evidence; the lender applies its own rating models, appétence pour le risque and pricing.

Credit questionClimate or operational evidence that answers it
Probability of default over the loan’s lifeRevenue and cost exposure of the borrower to hazards and transition pathways, by site
Perte en cas de défautCollateral location, hazard at relevant return periods, insurance cover on the collateral
ConcentrationShare of the book in one basin, coastline or supply corridor
Tenor and refinancingWhether hazard or policy change falls inside the loan term or at refinancing
Operational continuityDependencies of the borrower and the bank on shared infrastructure
04Processus

Comment le processus se déroule.

Process explorer · Process

Resilience and finance readiness: Damage assessment to recovery

8 étapes3 stages

Processus

Resilience and finance readiness: Damage assessment to recovery

The joint UN, World Bank and EU Post-Disaster Needs Assessment guides a government-led assessment that leads to a Recovery Strategy and later a Recovery Framework.

  1. 01 Assessment

    1. 01Damage and loss assessmentDataset · The affected governmentThe guide draws on the Damage and Loss Assessment (DaLA) method. Damages are valued in physical terms and then at replacement cost.
    2. 02Human recovery needsJeu de donnéesThe guide draws on the Human Recovery Needs Assessment (HRNA). The impact analysis covers economic and human development impact.
    3. 03Recovery needs and build back betterModèleRecovery needs are identified and costed. The guide refers to assessing needs to reduce risk and build back better.
  2. 02 Recovery strategy

    1. 04Recovery StrategyStep · The affected governmentThe assessment yields a Recovery Strategy with priority needs, interventions, expected outputs and the cost of recovery and reconstruction.
    2. 05Resource mobilisationÉtapeThe Recovery Strategy provides the basis for mobilising resources for recovery, including a donor conference.
    3. 06Cross-cutting issuesÉtapeThe guide asks that gender, environment, governance and human rights be mainstreamed in the assessment and the strategy.
  3. 03 Delivery

    1. 07Recovery Framework and implementationStep · Chief risk officerAfter the PDNA and Recovery Strategy, the government may develop a Recovery Framework with a sector plan, budget and monitoring plan.
    2. 08Monitoring and implementation planÉtapeThe detailed plan may include a monitoring and implementation plan.

Neutral outline of a published external standard or method, from its issuing body. Not a record of operation. Nexus does not perform, certify or approve any step shown. A gate or decision belongs to the party the source names. The assessment covers damages, losses and recovery needs.

05Capital frame

Where the evidence meets the capital rules.

Under the Basel Framework, climate drivers are not a separate capital charge; they enter through credit, market, liquidity and opérationnels, as the BCBS 2022 climate principles make explicit. Real-estate risk weights, collateral valuation rules and the output floor determine how a hazard-exposed exposure weighs in capital. EU banks apply the final reforms since January 2025; UK banks from 1 January 2027; the US package was re-proposed in March 2026 and is not final. Evidence on the borrower side comes from GCRI Infrastructures critiques.

06Version

Qui voit un dossier de préparation.

A file is released only at the programme owner’s written direction, to a party the owner chooses, with no fee tied to any transaction.

08Pages

Pages de Résilience et préparation financière.

09Questions

Questions et réponses.

Un dossier de préparation signifie-t-il que des financements sont disponibles ?
Non. Il appuie un examen indépendant par l'institution compétente, qui décide selon ses propres règles.
Banking Nexus

Soumettez une question d'exposition ou de capital à l'Alliance.

L'information et les demandes sont ouvertes dès aujourd'hui. Une demande reçoit une référence et indique l'étape suivante ; candidatures, paiements, allocations de calcul et inscriptions n'ouvrent que lorsque l'équipe, les conditions et la capacité d'examen existent.