Skip to content

GRA · Banking Nexus

Räumliche FinanzanalyseWo Kapital auf Gefahr, Exposition und Transition trifft

Resilienz und Finanzierungsbereitschaft

Banking readiness asks what a lender’s credit, collateral and continuity teams would need to see before a programme, a region or a sector can be assessed on their own terms. Banking Nexus prepares hazard, collateral and dependency evidence and frames the diligence questions. It never sets lending terms, assesses a borrower or states that anything is fit for credit.

01Arbeitsbereich

The workspace for resilience and finance readiness.

Klimarisiko im Kreditbuch

Mortgage book · Scenario: delayed transition · Example interface, not a record

Flood-exposed collateral risingGRA · Banking Nexus

Sicherheiten und Hochwassergefahr

geocoded collateral · illustrative

Kreisgröße: Expositionswert · BeispielN

Exposure by hazard band

Hoch41516885
Mittel429212875
Niedrig18,747168059
Klimarisiko im Kreditbuch.Beispielhafte Oberfläche; keine Live-Daten.

Banking Nexus · Klimarisiko im Kreditbuch. Klimarisiko im Kreditbuch: Beispielnamen und illustrative Werte, kein Eintrag.

02Bereitschaft

Readiness is not approval.

A readiness file describes a programme’s evidence, risks and governance so that an institution can carry out its own review. The Global Risks Alliance (GRA) does not approve, rate, underwrite, lend or invest, and it recommends no counterparty.

03Perspektive des Kreditausschusses

What a lender reads in a resilience programme.

Eine Bereitschaftsdatei ordnet diese Evidenz; der Kreditgeber wendet seine eigenen Ratingmodelle, seine Risikobereitschaft und seine Preisgestaltung an.

KreditfrageKlima- oder Betriebsevidenz, die sie beantwortet
Probability of default over the loan’s lifeRevenue and cost exposure of the borrower to hazards and transition pathways, by site
Verlustquote bei AusfallStandort der Sicherheiten, Gefahr bei relevanten Wiederkehrperioden, Versicherungsschutz der Sicherheiten
KonzentrationShare of the book in one basin, coastline or supply corridor
Tenor and refinancingWhether hazard or policy change falls inside the loan term or at refinancing
Operational continuityDependencies of the borrower and the bank on shared infrastructure
04Verfahren

Wie der Prozess abläuft.

Process explorer · Process

Resilienz und Finanzreife: Von der Schadensbewertung zum Wiederaufbau

8 Schritte3 stages

Verfahren

Resilienz und Finanzreife: Von der Schadensbewertung zum Wiederaufbau

The joint UN, World Bank and EU Post-Disaster Needs Assessment guides a government-led assessment that leads to a Recovery Strategy and later a Recovery Framework.

  1. 01 Bewertung

    1. 01Schadens- und VerlustbewertungDatensatz · Die betroffene RegierungThe guide draws on the Damage and Loss Assessment (DaLA) method. Damages are valued in physical terms and then at replacement cost.
    2. 02Human recovery needsDatensatzThe guide draws on the Human Recovery Needs Assessment (HRNA). The impact analysis covers economic and human development impact.
    3. 03Recovery needs and build back betterModellRecovery needs are identified and costed. The guide refers to assessing needs to reduce risk and build back better.
  2. 02 Wiederaufbaustrategie

    1. 04Recovery StrategyStep · The affected governmentThe assessment yields a Recovery Strategy with priority needs, interventions, expected outputs and the cost of recovery and reconstruction.
    2. 05Resource mobilisationSchrittThe Recovery Strategy provides the basis for mobilising resources for recovery, including a donor conference.
    3. 06QuerschnittsthemenSchrittThe guide asks that gender, environment, governance and human rights be mainstreamed in the assessment and the strategy.
  3. 03 Umsetzung

    1. 07Recovery Framework and implementationStep · Chief risk officerNach PDNA und Wiederaufbaustrategie kann die Regierung einen Wiederaufbaurahmen mit Sektorplan, Budget und Monitoringplan erarbeiten.
    2. 08Monitoring and implementation planSchrittThe detailed plan may include a monitoring and implementation plan.

Neutral outline of a published external standard or method, from its issuing body. Not a record of operation. Nexus does not perform, certify or approve any step shown. A gate or decision belongs to the party the source names. The assessment covers damages, losses and recovery needs.

05Kapitalrahmen

Where the evidence meets the capital rules.

Under the Basel Framework, climate drivers are not a separate capital charge; they enter through credit, market, liquidity and operationelle Risiken, as the BCBS 2022 climate principles make explicit. Real-estate risk weights, collateral valuation rules and the output floor determine how a hazard-exposed exposure weighs in capital. EU banks apply the final reforms since January 2025; UK banks from 1 January 2027; the US package was re-proposed in March 2026 and is not final. Evidence on the borrower side comes from GCRI Kritische Infrastruktur.

06Veröffentlichung

Who sees a readiness file.

A file is released only at the programme owner’s written direction, to a party the owner chooses, with no fee tied to any transaction.

08Seiten

Pages in Resilience and finance readiness.

09Fragen

Fragen und Antworten.

Does a readiness file mean finance is available?
No. It supports an independent review by the competent institution, which decides under its own rules.
Banking Nexus

Bringen Sie eine Frage zu Exposition oder Kapital in die Alliance ein.

Information und Anfragen sind heute offen. Eine Anfrage erhält ein Aktenzeichen und nennt den nächsten Schritt; Bewerbungen, Zahlungen, Rechenzuteilungen und Registrierungen öffnen erst, wenn Team, Bedingungen und Prüfkapazität bestehen.