Skip to content

GRA · Asset Management Nexus

Finanças espaciaisOnde o capital encontra ameaça, exposição e transição

Infraestrutura e ativos reais

Infrastructure, real estate, farmland and timber are fixed in place, long-lived and often privately held. Their value depends on physical sites, operating contracts and regulated revenues, which ties them directly to hazards, transitions and policy. This page sets out how physical and operational risk reaches real-asset portfolios, how valuation practice can lag that risk, and what evidence owners and managers need to see exposures that market prices do not show.

01Registrar

Infrastructure and real assets on the record.

02A pergunta

Infraestrutura e ativos reais: como o risco se desenvolve.

Physical and operational exposure. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mecanismo

A localização determina a exposição

A port, pipeline, building or plantation cannot move away from flood, heat, wildfire, storm or water stress. Exposure is set by coordinates and design standards, while hazard frequency changes over the asset’s life.

Mecanismo

Dependências operacionais

Uma rodovia com pedágio depende do tráfego, um data center de energia e água de resfriamento, uma concessionária de serviços públicos de seu regulador. A interrupção a montante atinge a receita mesmo quando o próprio ativo não sofreu danos.

Mecanismo

A avaliação suaviza o valor

Os ativos reais privados são avaliados por laudo a intervalos, muitas vezes com base em transações comparáveis. As avaliações se ajustam lentamente, de modo que a volatilidade reportada subestima o risco econômico e a reprecificação pode chegar tarde e em etapas.

Mecanismo

Ativos encalhados e obsolescência

Padrões de eficiência energética, precificação de carbono e mudanças na demanda podem encurtar a vida econômica de edifícios e da infraestrutura fóssil. Os custos de reforma e as preferências dos inquilinos alteram o valor antes de a regulamentação entrar em vigor.

03Finanças espaciais

Os ativos na grelha e a carteira que formam.

Where a portfolio’s assets sit, and how much of its value is most exposed. Hypothetical assets, not an assessment.

Dezesseis ativos em cidades reais e a parcela do valor da carteira nos locais mais expostos.Ativos hipotéticos e pontuações de desenho, não um aconselhamento.
04Indicadores

O que é medido e com que qualidade.

Cada indicador leva sua unidade, sua periodicidade, o tipo de fonte por trás dele e a etiqueta de evidência que um valor levaria. Nenhum valor é mostrado: um programa os fornece sob sua própria autoridade.

IndicadorUnidadeCadênciaTipo de fonteRótulo
Asset value in high physical hazard zonespercentual do valor da carteira por ameaçaanualLocalização de ativos nas camadas de ameaçasMODELADO
Insured share of replacement costpercentual do valor de reposiçãoanualInsurance schedulesREPORTADO
Intensidade energética de edificaçõeskilowatt hours per square metre per yearanualDados de energia medidos e estimadosESTIMADO
Point of misalignment with a decarbonisation pathwayyear of crossing the pathwayanualCRREM pathways applied to asset dataMODELADO
Distribuição dos certificados de desempenho energéticoparticipação da área construída por classificaçãoanualNational certificate registersEstatísticas publicadas
Valuation lagmeses entre as evidências de mercado e o ajuste da avaliaçãotrimestralAppraisal and transaction dataESTIMADO
Revenue from regulated or contracted incomepercentual da receitaanualDemonstrações financeiras do ativoREPORTADO
Downtime from hazard eventshoras por anoanualOperator incident recordsREPORTADO
05Monitoramento

Liquidity stress test.

A tela que uma equipe usaria para acompanhar esta matéria: suas medidas, estados e decisões. Os nomes são exemplos e os valores são ilustrativos.

Teste de estresse de liquidez

Infraestrutura e ativos reais · Fundo de títulos · Cenário: choque de resgates

Covered under stressGRA · Asset Management Nexus

Faixas de liquidez

050participação no patrimônio líquido por dias para venderNormalSob estresse
  • 1 day
  • 2 a 7 dias
  • Ao longo de 7 dias

Cenários de resgate

Pior caso histórico91.7None needed
Severa171.4Swing pricing
Extrema341.1Marco
Liquidity stress test: the screen’s structure, terms and states for Infrastructure and real assets.Example names and illustrative values; a design, not a record or a live system.
06Fontes

De onde vêm as evidências.

Conjuntos de dados públicos nomeados e registros institucionais, cada um com sua classe de licença. As fontes obtidas por acordo só são usadas nos seus termos e nunca são republicadas.

FonteO que ofereceClasse de licença
Trajetórias de descarbonização do CRREMEnergy and carbon pathways for real estate by country and property typeFree with registration, terms
Avaliações GRESB de Real Estate e InfraestruturaDados reportados de sustentabilidade e resiliência de fundos e ativos participantesLicensed; public summary results
WRI AqueductWater stress, riverine and coastal flood hazard layersLivre e aberto, atribuição
Serviço Copernicus de mudança climática ServiçoReanálises e projeções climáticas para análise de ameaçasLivre e aberto, atribuição
Registros nacionais de certificados de desempenho energéticoEnergy ratings of buildings from certificate registersRegistros públicos, termos por registro
Índices EDHEC de infraestrutura e ativos privadosÍndices de avaliação e de retorno para participações e dívida de infraestrutura não listadaLicenciado
Fund and asset annual reportsPolíticas de avaliação, seguros, divulgações de ameaças e dados operacionaisPublic records where listed; by agreement otherwise
07Modelo de exposição

Como um choque local se torna uma interrupção do sistema.

How much of the networks an operator, insurer or lender depends on stays working after a local shock, and how much the coupling between them amplifies it. Teaching model with stated illustrative values, not a prediction. The map on this page shows North America; the model itself is not tied to a place.

Controles

Ativos por camada
18
Área de impacto da ameaça
8% da área
Ativos que dependem de outra camada
60%
Capacidade de reserva (tolerância)
30%

Leituras

Ativos atingidos pela ameaça
15%
Ativos ainda a funcionar
37%
Amplificação do dano inicial
4,3 vezes
Passos até à liquidação
2
Números, métodos e fontes
PassoFuncionamento da alimentação (%)Água em funcionamento (%)Telecomunicações operacionais (%)
0679494
1563361
2501150

Métodos

  1. Interdependent networks Buldyrev and others (2010), Catastrophic cascade of failures in interdependent networks, Nature 464
  2. Overload cascades Motter and Lai (2002), Physical Review E 66
  3. Betweenness load Brandes (2001), Journal of Mathematical Sociology 25
  4. Multilayer networks Kivela and others (2014), Journal of Complex Networks 2
  5. Infrastructure interdependencies Rinaldi, Peerenboom and Kelly (2001), IEEE Control Systems 21(6)
  6. Leque de incerteza (Monte Carlo de parâmetros) Spiegelhalter, Pearson e Short (2011), Visualising uncertainty about the future, Science 333
  7. One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Dados

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Major roads Natural Earth
  • Railways Natural Earth
  • Seaports Natural Earth
  • Airports Natural Earth
  • Urban extents Natural Earth
  • Luzes noturnas esta noite, falhas (banda dia/noite VIIRS) NASA/NOAA VIIRS (Suomi NPP) · registo nasa.gibs.context-live-layers
  • Eventos naturais (NASA EONET) NASA EONET · registo nasa.eonet.events
Como um choque local se torna uma interrupção do sistema. Modelo didático ilustrativo: funciona com os valores definidos pelos controles, e não com dados medidos. Métodos: redes interdependentes (Buldyrev e outros (2010), Catastrophic cascade of failures in interdependent networks, Nature 464); cascatas de sobrecarga (Motter e Lai (2002), Physical Review E 66); carga de intermediação (Brandes (2001), Journal of Mathematical Sociology 25).
08Decisões

Quem decide, e a que servem as evidências.

Asset Management Nexus prepara evidências. As decisões abaixo são tomadas pelas autoridades indicadas, segundo suas próprias regras, e nunca pela plataforma.

Quem decideA perguntaEvidências a que esta página serve
Comitês de investimento de proprietários de ativosHow much physical and transition exposure the real-asset allocation can carryHazard exposure by asset, dependency maps and valuation sensitivities under scenarios
Valuation committees and independent valuersSe as avaliações refletem ameaça, eficiência e risco de obsolescênciaEvidências comparáveis, desalinhamento de trajetória e dados de ameaças usados na avaliação
Reguladores de infraestrutura e autoridades concedentesWhich resilience standards and cost recovery rules apply to regulated assetsHazard exposure and downtime records; adaptation costs by asset class
Seguradoras e credores de ativos reaisSe a cobertura e as condições de empréstimo refletem o risco específico da localizaçãoAsset-level hazard layers and the insurance and deductible structure

Produtos que este tema gera

  • Physical exposure profiles of real-asset portfolios by hazard and design standard
  • Dependency maps from asset to power, water, transport and regulator
  • Sensibilidades de avaliação baseadas em cenários, com a defasagem de avaliação indicada
  • Pesquisa sobre como a ameaça e o risco de transição entram na prática de avaliação de ativos reais
09Simulador de gêmeo e cascata

Trace a shock in infrastructure and real assets to the balance sheet.

Assembled from the Nexus Standards area profile Asset owners and asset management: the shocks it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Pick an initiating shock and step through the cascade to see which exposures it reaches and where losses could concentrate. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise, not a forecast, a valuation, a rating or investment advice. To model a place of your own choosing, open the full System Builder.

Ameaças

  • Windstorm
  • Geomagnetic storm
  • Rotura de barragem
  • Apagão generalizado (desencadeado a jusante)
  • Large forest disturbance (set off downstream)
  • Incêndio florestal (desencadeada a jusante)
  • Geomagnetically induced current (set off downstream)
  • Ionospheric disturbance (set off downstream)
  • Satellite space-environment anomaly (set off downstream)
  • Inundação fluvial (desencadeada a jusante)
  • Flash flood (set off downstream)
  • Deslocamento em massa (desencadeado a jusante)
  • Shoreline ice shove (set off downstream)
  • Thermospheric drag surge (set off downstream)
  • Radiation-belt electron enhancement (set off downstream)
  • Seiche (set off downstream)
  • Satellite-navigation disruption (set off downstream)
  • Uncontrolled re-entry (set off downstream)

Controles

  • NS-0 Constituição e princípios
  • NS-3 UNIs de registros de risco (gramática, correspondência legada, autoridade de atribuição)
  • NS-9 UNIs contextuais (implantações, instâncias, instâncias de programa)
  • NS-11 Verificação e monitoramento (evidências, atestações, observação da conformidade de confiança zero)
  • NS-14 Conformidade e correspondência com normas externas
  • NRS-U1Perfil de plataforma do Universe: Asset Management Nexus
  • NRS-H113 Família de ameaças: fragilidade do sistema financeiro (NHS-1 soc.financial-system)
  • NRS-N6 Risco e resiliência das infraestruturas
  • NRS-C3 Dados sobre ameaças, exposição, vulnerabilidade e capacidade
  • NRS-M3 Trama de métodos: Exposição e inteligência de ativos
  • NRS-N5 Risco e resiliência da biodiversidade e da natureza

Observação

  • OECD Data Explorer (incl. Creditor Reporting System, insurance and pension statistics) (listed for reference)
  • NGFS Scenario Explorer (listed for reference)
  • GLEIF Golden Copy (LEI Level 1 and Level 2 data) (listed for reference)
  • World Development Indicators (listed for reference)
  • Number of companies publishing sustainability reports
  • Market capitalisation of listed domestic companies (% of GDP)
  • Total greenhouse gas emissions per year

Geografia de exemplo

  • Europa Ocidental: 152 células hexagonais
  • Taxa de chuva, última meia hora (IMERG), NASA GIBS
  • Luzes noturnas desta noite, apagões (VIIRS Day/Night Band), NASA GIBS
  • Vegetation disturbance alerts, 30 m (OPERA DIST-ALERT), NASA GIBS
  • Carbon monoxide, smoke transport (AIRS), NASA GIBS
10Questões centrais

O que os especialistas perguntam sobre ativos reais.

  • Qual é a exposição dos ativos a inundações, tempestades, calor, seca e elevação do nível do mar ao longo de sua vida útil?
  • Como as dependências de energia, água e transporte afetam o operacionais?
  • Como a regulação, a tecnologia e a demanda podem alterar o valor de ativos de longa duração?
  • Como a disponibilidade e o custo do seguro afetam o valor dos ativos?
  • Como se avaliam ativos reais quando os mercados são rasos e as avaliações, pouco frequentes?
11Exposição, perda e capital

O que infraestrutura e ativos reais significam para exposição, perda e capital.

As vistas de exposição, perda, cenários e capital que um responsável pelo risco, um supervisor ou um ministério das finanças pediria, com os quadros de referência perante os quais reportam. As estruturas seguem a prática de supervisão e atuarial. Os valores são ilustrativos: nunca preços, notações ou aconselhamento.

Trajetórias de cenários

Como a infraestrutura e os ativos reais poderiam ser submetidos a estresse nas famílias de cenários usadas por bancos centrais e supervisores.

OrdenadaDesordenadaMundo de estufa202520302035204020452050altobaixo
Família de cenáriosrisco de transiçãoRisco físicoO que um teste de esforço pergunta
OrdenadaPolítica precoce e gradualMais baixoA carteira consegue absorver uma reprecificação contínua?
DesordenadaPolítica tardia e abruptaDe baixo a médioO que se rompe diante de uma reprecificação súbita e de uma migração de crédito?
Mundo de estufaPolítica limitadaElevado e crescenteOnde se concentram as perdas físicas em garantias e seguros?
Famílias de cenários conforme definidas pelo NGFS; as curvas são um índice ilustrativo de pressão combinada, não variáveis nem previsões do NGFS.
Cenários climáticos do NGFS · Network for Greening the Financial SystemIFRS S2 Divulgações Relacionadas ao Clima · ISSBRecomendações da TCFD · Financial Stability Board TCFDPrincípios para a gestão eficaz dos riscos financeiros relacionados ao clima · Comitê de Basileia de Supervisão Bancária
12Mecanismos e fatores

Por que a exposição física importa.

Real assets are tied to places. Their exposure to hazards depends on location and design, and climate change is altering the frequency and intensity of many hazards over the lifetimes of assets built today. Damage, downtime and higher maintenance can reduce income and value.

Os ativos dependem dos sistemas ao seu redor. Um centro de dados precisa de energia e água de resfriamento; um porto precisa de ligações de transporte; um edifício precisa de acesso e serviços. Falhas nesses sistemas podem afetar ativos que não foram danificados.

Valuation adds uncertainty. Appraisal-based values move slowly and may not reflect emerging risks until a transaction or event reveals them. Insurance withdrawal or rising premiums in high-risk areas can affect value quickly.

13Métodos e dados

Métodos e seus limites.

  1. 01

    Physical risk assessment

    Combinação de ameaça, exposição e vulnerabilidade para ativos específicos, com base na ciência do Global Centre for Risk and Innovation (GCRI). Os dados locais e as projeções futuras são incertos.

  2. 02

    Análise de dependências

    Mapping reliance on infrastructure systems. Dependencies may be poorly documented.

  3. 03

    Estudos de valoração

    Examining how risks affect prices, using econometrics. Thin markets limit evidence.

  4. 04

    Análise de cenários

    Teste de ativos sob cenários climáticos e de transição, usando o desenho de cenários.

Asset-level risk assessment requires precise location and design data, which are often unavailable in public sources.

14Métodos

Como é estudado e o que os métodos não podem dizer.

  1. Engenharia financeira e de riscosDecomposição de riscos por transparência · Classificação da liquidez por faixas e testes de resgateAplicado aqui
  2. Desenho de cenários e testes de estresseAnálise de cenários climáticos das carteiras · Cenários de resgates e de margens em todo o sistemaAplicado aqui
  3. EconometriaEstimativa de fluxos e de pressão sobre os preços · Estudos de eventos sobre stewardship e divulgaçãoAplicado aqui
  4. Economia financeira e macrofinançasPropriedade comum e canais de vendas forçadas · Precificação do risco de transiçãoAplicado aqui
15Perguntas

Perguntas e respostas.

Why do private real assets look less volatile than listed ones?
Because appraisals update slowly and smooth changes in value. Over long periods their economic risk resembles that of comparable listed assets; the reported series hides part of it.
O que é um ativo encalhado?
Um ativo que perde valor ou capacidade de geração de receita mais cedo do que o esperado por causa de regulação, tecnologia, demanda ou mudança física. O termo descreve um risco, não um resultado certo.
Can global hazard maps be used for a single building?
With care. Global layers are coarse and miss local defences and drainage. Site surveys and local hazard studies are needed before a single-asset view is taken.
A plataforma avalia ativos reais?
Não. Estuda como os riscos afetam o valor e como podem ser avaliados.
Por que o seguro importa para os ativos reais?
Because insurance availability and cost affect income, financing and value, especially in high-risk areas.
Os riscos operacionais estão incluídos?
Yes, including dependencies on power, water, transport and digital systems.
Does the topic cover farmland and timber?
Yes, as real assets exposed to climate and ecological change.
RelatóriosContribuir

Contribua com evidências a partir desta página.

Reports é a publicação trimestral do Consortium. O que você sabe sobre este tema pode se tornar evidência, um caso ou uma correção na próxima edição, com crédito a você e publicado sob CC BY 4.0 quando for obra sua.

Global Risks AllianceAsset Management NexusFinance and Insurance ReadinessScenario and Stress-Test
Asset Management Nexus

Apresente à Alliance uma questão de exposição ou de capital.

A informação e os pedidos estão abertos hoje. Um pedido recebe uma referência e indica o próximo passo; candidaturas, pagamentos, alocações de computação e registros só abrem quando existem a equipa, os termos e a capacidade de revisão.