Infrastructure, real estate, farmland and timber are fixed in place, long-lived and often privately held. Their value depends on physical sites, operating contracts and regulated revenues, which ties them directly to hazards, transitions and policy. This page sets out how physical and operational risk reaches real-asset portfolios, how valuation practice can lag that risk, and what evidence owners and managers need to see exposures that market prices do not show.

01تۆمارکردن

Infrastructure and real assets on the record.

02پرسیارەکە

Infrastructure and real assets: how the risk develops.

Physical and operational exposure. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

میکانیزم

Location fixes exposure

A port, pipeline, building or plantation cannot move away from flood, heat, wildfire, storm or water stress. Exposure is set by coordinates and design standards, while hazard frequency changes over the asset’s life.

میکانیزم

Operational dependencies

A toll road depends on traffic, a data centre on power and cooling water, a utility on its regulator. Disruption upstream reaches revenue even when the asset itself is undamaged.

میکانیزم

Appraisal smooths value

Private real assets are valued by appraisal at intervals, often from comparable transactions. Valuations adjust slowly, so reported volatility understates economic risk and repricing can arrive late and in steps.

میکانیزم

Stranding and obsolescence

Energy-efficiency standards, carbon pricing and shifts in demand can shorten the economic life of buildings and fossil infrastructure. Refurbishment costs and tenant preferences move value before regulation takes effect.

03Spatial finance

Assets on the grid, and the portfolio they make.

Where a portfolio’s assets sit, and how much of its value is most exposed. Hypothetical assets, not an assessment.

Sixteen assets at real towns, and the share of portfolio value in the most exposed places.Hypothetical assets and design scores, not advice.
04نیشاندەرەکان

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

نیشاندەریەکەڕیتمSource typeناونیشان
Asset value in high physical hazard zonespercent of portfolio value by hazardساڵانەAsset locations on hazard layersمۆدێلکراو
Insured share of replacement costpercent of replacement valueساڵانەInsurance schedulesڕاپۆرتکراو
Building energy intensitykilowatt hours per square metre per yearساڵانەMetered and estimated energy dataمەزەندەکراو
Point of misalignment with a decarbonisation pathwayyear of crossing the pathwayساڵانەCRREM pathways applied to asset dataمۆدێلکراو
Energy performance certificate distributionshare of floor area by ratingساڵانەNational certificate registersئامارە بڵاوکراوەکان
Valuation lagmonths between market evidence and appraisal adjustmentوەرزانەAppraisal and transaction dataمەزەندەکراو
Revenue from regulated or contracted incomepercent of revenueساڵانەAsset financial statementsڕاپۆرتکراو
Downtime from hazard eventshours per yearساڵانەOperator incident recordsڕاپۆرتکراو
05چاودێری

Liquidity stress test.

ئەو شاشەیەی تیمێک بۆ بەدواداچوونی ئەم بابەتە بەکاری دەهێنێت: پێوەر، دۆخ و بڕیارەکانی. ناوەکان نموونەن و بەهاکان ڕوونکەرەوەن.

Liquidity stress test

Infrastructure and real assets · Bond fund · Scenario: redemption shock

Covered under stressGRA · Asset Management Nexus

Liquidity buckets

050share of NAV by days to sellئاساییStressed
  • 1 day
  • 2 to 7 days
  • Over 7 days

Redemption scenarios

Historic worst91.7None needed
توند171.4Swing pricing
ئەوپەڕ341.1دەروازە
Liquidity stress test: the screen’s structure, terms and states for Infrastructure and real assets.Example names and illustrative values; a design, not a record or a live system.
06سەرچاوەکان

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

سەرچاوەWhat it givesLicence class
CRREM decarbonisation pathwaysEnergy and carbon pathways for real estate by country and property typeFree with registration, terms
GRESB Real Estate and Infrastructure assessmentsReported sustainability and resilience data of participating funds and assetsLicensed; public summary results
WRI AqueductWater stress, riverine and coastal flood hazard layersFree and open, attribution
Copernicus Climate Change ServiceClimate reanalysis and projections for hazard analysisFree and open, attribution
National energy performance certificate registersEnergy ratings of buildings from certificate registersPublic records, terms per register
EDHEC infrastructure and private assets indicesValuation and return indices for unlisted infrastructure equity and debtLicensed
Fund and asset annual reportsValuation policies, insurance, hazard disclosures and operating dataPublic records where listed; by agreement otherwise
07Exposure model

How a local shock becomes a system outage.

How much of the networks an operator, insurer or lender depends on stays working after a local shock, and how much the coupling between them amplifies it. Teaching model with stated illustrative values, not a prediction. The map on this page shows North America; the model itself is not tied to a place.

کۆنترۆڵەکان

موڵک بۆ هەر چینێک
18
شوێنپێی مەترسیدەر
8% ی ناوچەکە
موڵکی پشتبەستوو بە چینێکی دیکە
60%
توانای یەدەگ (ڕێژەی قبووڵکردن)
30%

خوێندنەوەکان

موڵکی کەوتووە بەر مەترسیدەر
15%
موڵکی هێشتا کارکەر
37%
زیادبوونی زیانی سەرەتایی
4.3 times
هەنگاوەکانی یەکلاکردنەوە
2
ژمارە، ڕێگا و سەرچاوەکان
هەنگاوهێزی کارکەر (%)Water working (%)پەیوەندییەکانی کارکەر (%)
0679494
1563361
2501150

ڕێگاکان

  1. تۆڕە پشتبەستوو بە یەکترەکان Buldyrev و ئەوانی دیکە (2010)، Catastrophic cascade of failures in interdependent networks، Nature 464
  2. زنجیرەی بارزۆری Motter و Lai (2002)، Physical Review E 66
  3. بارگرانی ناوەندێتی نێوانی Brandes (2001)، Journal of Mathematical Sociology 25
  4. تۆڕە فرە چینەکان Kivela و ئەوانی دیکە (2014)، Journal of Complex Networks 2
  5. پشتبەستنی ژێرخانەکان بە یەکتر Rinaldi، Peerenboom و Kelly (2001)، IEEE Control Systems 21(6)
  6. پەنجەی نادڵنیایی (مۆنتی کارلۆی پارامیتەر) Spiegelhalter, Pearson و Short (2011)، Visualising uncertainty about the future، Science 333
  7. هەستیاریی یەک-یەک (تۆرناد) Saltelli و ئەوانی دیکە (2008)، Global Sensitivity Analysis: The Primer، Wiley

داتا

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Major roads Natural Earth
  • Railways Natural Earth
  • Seaports Natural Earth
  • Airports Natural Earth
  • Urban extents Natural Earth
  • Night lights tonight, outages (VIIRS Day/Night Band) NASA/NOAA VIIRS (Suomi NPP) · register nasa.gibs.context-live-layers
  • Natural events (NASA EONET) NASA EONET · register nasa.eonet.events
How a local shock becomes a system outage. Illustrative teaching model: it runs on the values set by the controls, not on measured data. Methods: Interdependent networks (Buldyrev and others (2010), Catastrophic cascade of failures in interdependent networks, Nature 464); Overload cascades (Motter and Lai (2002), Physical Review E 66); Betweenness load (Brandes (2001), Journal of Mathematical Sociology 25).

لە ناو شەش کۆڵەکەکەدا، بە سەرپەرشتیی Nexus Consortium

08بڕیارەکان

Who decides, and what the evidence serves.

Asset Management Nexus prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

کێ بڕیار دەداتپرسیارەکەEvidence this page serves
Asset owner investment committeesHow much physical and transition exposure the real-asset allocation can carryHazard exposure by asset, dependency maps and valuation sensitivities under scenarios
Valuation committees and independent valuersWhether appraisals reflect hazard, efficiency and obsolescence riskComparable evidence, pathway misalignment and hazard data used in valuation
Infrastructure regulators and concession authoritiesWhich resilience standards and cost recovery rules apply to regulated assetsHazard exposure and downtime records; adaptation costs by asset class
Insurers and lenders to real assetsWhether cover and loan terms reflect location-specific riskAsset-level hazard layers and the insurance and deductible structure

Outputs this topic produces

  • Physical exposure profiles of real-asset portfolios by hazard and design standard
  • Dependency maps from asset to power, water, transport and regulator
  • Scenario-based valuation sensitivities with appraisal lag stated
  • Research on how hazard and transition risk enter real-asset valuation practice
09شبیهسازی دووانە و زنجیرەیی

Trace a shock in infrastructure and real assets to the balance sheet.

Assembled from the Nexus Standards area profile Asset owners and asset management: the shocks it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Pick an initiating shock and step through the cascade to see which exposures it reaches and where losses could concentrate. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise, not a forecast, a valuation, a rating or investment advice. To model a place of your own choosing, open the full System Builder.

مەترسیدەرەکان

  • Windstorm
  • Geomagnetic storm
  • ڕووخانی بەنداو
  • پچڕانی کارەبای فراوان (لە خوارەوە دەستپێدەکات)
  • Large forest disturbance (set off downstream)
  • ئاگری دارستان (لە خوارەوەی ڕووبار دەستپێدەکات)
  • Geomagnetically induced current (set off downstream)
  • Ionospheric disturbance (set off downstream)
  • Satellite space-environment anomaly (set off downstream)
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • ئاوارەبوونی بەکۆمەڵ (لە خوارەوە دەستپێدەکات)
  • Shoreline ice shove (set off downstream)
  • Thermospheric drag surge (set off downstream)
  • Radiation-belt electron enhancement (set off downstream)
  • Seiche (set off downstream)
  • Satellite-navigation disruption (set off downstream)
  • Uncontrolled re-entry (set off downstream)

کۆنترۆڵەکان

  • NS-0 دەستوور و بنەماکان
  • NS-3 UNIەکانی تۆماری مەترسی (ڕێزمان، خشتەی گواستنەوەی کۆن، دەسەڵاتی تەرخانکردن)
  • NS-9 UNIی ناوەڕۆکی (دامەزراندنەکان، نموونەکان، نموونەکانی پڕۆگرام)
  • NS-11 سەلماندن و چاودێری (بەڵگە، گواهییەکان، چاودێریی گونجان لەگەڵ zero-trust)
  • NS-14 پابەندبوون و هاوتاکردن لەگەڵ ستانداردی دەرەکی
  • NRS-U1 Universe platform profile: Asset Management Nexus
  • NRS-H113 خێزانی مەترسیدەر: ناسکیی سیستەمی دارایی (NHS-1 soc.financial-system)
  • NRS-N6 مەترسی و خۆڕاگریی ژێرخان
  • NRS-C3 داتای مەترسیدەر، ڕووبەڕووبوون، لاوازی و توانا
  • NRS-M3 تانوپۆی میتۆد: هەواڵگریی ڕووبەڕووبوون و سامان
  • NRS-N5 مەترسی و خۆڕاگریی فرەجۆریی زیندەوەری و سروشت

چاودێری

  • OECD Data Explorer (incl. Creditor Reporting System, insurance and pension statistics) (listed for reference)
  • NGFS Scenario Explorer (listed for reference)
  • GLEIF Golden Copy (LEI Level 1 and Level 2 data) (listed for reference)
  • World Development Indicators (listed for reference)
  • Number of companies publishing sustainability reports
  • Market capitalisation of listed domestic companies (% of GDP)
  • Total greenhouse gas emissions per year

جوگرافیای نموونە

  • ئەوروپای ڕۆژئاوا: 152 خانەی شەشپاڵوو
  • ڕێژەی بارین، نیو کاتژمێری ڕابردوو (IMERG)، NASA GIBS
  • ڕووناکییەکانی شەو ئەمشەو، پچڕانی کارەبا (VIIRS Day/Night Band)، NASA GIBS
  • Vegetation disturbance alerts, 30 m (OPERA DIST-ALERT), NASA GIBS
  • Carbon monoxide, smoke transport (AIRS), NASA GIBS
10Core questions

What experts ask about real assets.

  • How exposed are assets to floods, storms, heat, drought and sea-level rise over their lifetimes?
  • How do dependencies on power, water and transport affect operational risk?
  • How might regulation, technology and demand change the value of long-lived assets?
  • How do insurance availability and cost affect asset value?
  • How are real assets valued when markets are thin and appraisals infrequent?
11Exposure, loss and capital

What infrastructure and real assets means for exposure, loss and capital.

The exposure, loss, scenario and capital views a risk officer, supervisor or ministry of finance would ask for, with the frameworks they report against. Structures follow supervisory and actuarial practice. Values are illustrative: never prices, ratings or advice.

Scenario pathways

How infrastructure and real assets could be stressed under the scenario families central banks and supervisors use.

ڕێکخراونارێکHot house world202520302035204020452050بەرزنزم
Scenario familyمەترسیی گواستنەوەمەترسیی فیزیکیWhat a stress test asks
ڕێکخراوEarly, gradual policyنزمCan the book absorb a steady repricing?
نارێکLate, abrupt policyLower to mediumWhat breaks under a sudden repricing and credit migration?
Hot house worldLimited policyHigh and risingWhere do physical losses concentrate in collateral and insurance?
Scenario families as defined by the NGFS; the curves are an illustrative combined pressure index, not NGFS variables or forecasts.
NGFS climate scenarios · Network for Greening the Financial SystemIFRS S2 Climate-related Disclosures · ISSBTCFD recommendations · Financial Stability Board TCFDPrinciples for the effective management of climate-related financial risks · Basel Committee on Banking Supervision
12Mechanisms and drivers

Why physical exposure matters.

Real assets are tied to places. Their exposure to hazards depends on location and design, and climate change is altering the frequency and intensity of many hazards over the lifetimes of assets built today. Damage, downtime and higher maintenance can reduce income and value.

Assets depend on systems around them. A data centre needs power and cooling water; a port needs transport links; a building needs access and services. Failures in these systems can affect assets that are not themselves damaged.

Valuation adds uncertainty. Appraisal-based values move slowly and may not reflect emerging risks until a transaction or event reveals them. Insurance withdrawal or rising premiums in high-risk areas can affect value quickly.

13Methods and data

Methods and their limits.

  1. 01

    Physical risk assessment

    Combining hazard, exposure and vulnerability for specific assets, drawing on the Global Centre for Risk and Innovation (GCRI) science. Local data and future projections are uncertain.

  2. 02

    Dependency analysis

    Mapping reliance on infrastructure systems. Dependencies may be poorly documented.

  3. 03

    Valuation studies

    Examining how risks affect prices, using econometrics. Thin markets limit evidence.

  4. 04

    Scenario analysis

    Testing assets under climate and transition scenarios, using scenario design.

Asset-level risk assessment requires precise location and design data, which are often unavailable in public sources.

14ڕێگاکان

How it is studied, and what the methods cannot say.

  1. Financial and risk engineeringLook-through risk decomposition · Liquidity bucketing and redemption testsApplied here
  2. Scenario design and stress testingClimate scenario analysis of portfolios · System-wide redemption and margin scenariosApplied here
  3. EconometricsFlow and price pressure estimation · Event studies of stewardship and disclosureApplied here
  4. Financial economics and macro-financeCommon ownership and fire-sale channels · Pricing of transition riskApplied here
15پرسیارەکان

پرسیار و وەڵام.

Why do private real assets look less volatile than listed ones?
Because appraisals update slowly and smooth changes in value. Over long periods their economic risk resembles that of comparable listed assets; the reported series hides part of it.
What is a stranded asset?
An asset that loses value or earning power earlier than expected because of regulation, technology, demand or physical change. The term describes a risk, not a certain outcome.
Can global hazard maps be used for a single building?
With care. Global layers are coarse and miss local defences and drainage. Site surveys and local hazard studies are needed before a single-asset view is taken.
Does the platform value real assets?
No. It studies how risks affect value and how they can be assessed.
Why does insurance matter for real assets?
Because insurance availability and cost affect income, financing and value, especially in high-risk areas.
Are operational risks included?
Yes, including dependencies on power, water, transport and digital systems.
Does the topic cover farmland and timber?
Yes, as real assets exposed to climate and ecological change.
ڕاپۆرتەکانبەشداربە

لەم لاپەڕەیەوە بەڵگە پێشکەش بکە.

Reports بڵاوکراوەی وەرزیی کۆنسۆرتیۆم ـە. ئەوەی تۆ لەسەر ئەم بابەتە دەیزانیت دەتوانێت لە وەشانی داهاتوودا ببێتە بەڵگە، کەیس یان ڕاستکردنەوە، بە ناوی خۆتەوە و لەژێر CC BY 4.0 بڵاو دەکرێتەوە کاتێک کاری خۆتە.

Global Risks AllianceAsset Management NexusFinance and Insurance ReadinessScenario and Stress-Test

هەرگیز داتای کەسی، وردەکاریی هەستیاری ژێرخان یان هیچ شتێک مەنێرە کە مافی بڵاوکردنەوەت نییە. بەشدارییەک پێش بەکارهێنان پێداچوونەوەی بۆ دەکرێت؛ ناردنی ماف نابەخشێت بە نووسەرایەتی یان بەڕێوەبردنی ڕاگەیاندن، و پاڵپشتی دارایی هەرگیز دۆزینەوەیەک ناکڕێت.

Asset Management Nexus

Bring an exposure or capital question to the Alliance.

زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.