- Italy 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.
7.1Questions for the operational series
- A-01
How would a drought-to-flood year travel through agriculture, hydropower, health and slopes, a hot, dry summer on the Po followed by autumn cloudbursts on dried soils?
INI-ITA-DFL-01 · drought-to-flood year; first output: dependency graph for the Po basin and Romagna.
- A-02
Which homes, schools and lifelines sit in high flood and landslide hazard areas, municipality by municipality?
INI-ITA-HGR-02 · hydrogeological exposure; first output: exposure register by municipality.
- A-03
Where does the uninsured share of earthquake, flood and landslide losses land, and how would wider cover change it?
INI-ITA-FIN-03 · protection gap and fiscal backstop; first output: loss-sharing table, 2009–2025.
- A-04
How prepared are the communities around the Campi Flegrei for a further escalation of unrest?
INI-ITA-GEO-04 · seismic and volcanic readiness; first output: readiness note with evidence grades.
- A-05
What heat surge capacity exists for older people at home and in care in the largest cities?
INI-ITA-HLT-05 · heat surge readiness; first output: surge baseline for five cities.
- A-06
How much drought resilience would cutting network losses and adding storage buy in the South and the islands?
With GS-01 Water; first output: loss and storage note.
- A-07
How are Xylella, drought and wildfire changing olive groves and Mediterranean ecosystems?
To be admitted in Q1 2027; first output: scoping note.
- A-08
Which capabilities have been tested in real events, and which are only documented?
National capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-ITA-DFL-01 | Drought-to-flood year dependency model | Initiative | A-01 | PROPOSED |
| INI-ITA-HGR-02 | Hydrogeological exposure register | Initiative | A-02 | PROPOSED |
| INI-ITA-FIN-03 | Protection gap and fiscal backstop | Initiative | A-03 | PROPOSED |
| INI-ITA-GEO-04 | Seismic and volcanic readiness | Initiative | A-04 | PROPOSED |
| INI-ITA-HLT-05 | Heat surge readiness | Initiative | A-05 | PROPOSED |
| MSN-ITA-2027-01 | Drought-to-flood year Universe mission | Mission | A-01 | Candidate |
7.3The pathway
Italy is the national pathway through which the Nexus operating system will run from 2027, across the twenty regions. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.
- 01
One National Agenda
bounded national questions for the year
DRAFT 2027 · agenda review at the Q1 alignment
- 02
National Desk
coordination, records, routing and continuity
DESIGNED · constituted in Q1 2027
- 03
National Model
the country as a system of systems
v0 SPECIFIED · v1 with the first Foundry cut
- 04
National Portfolio
risks, capabilities, initiatives, projects, missions
7 PROPOSED · admission at the Q1 alignment
- 05
Foundry
continuous computational environment
PREPARED · first sealed cut NQ-ITA-2027-Q1
- 06
Reports
quarterly and annual publication
BASELINE ISSUED · Q1 2027 · State & Agenda
- 07
Universe
annual proving environment
CANDIDATE MISSION · mandate set in 2027
- 08
Evidence and correction
after-action, correction and renewal
OPEN · first correction cycle in Q2 2027
7.4Universe 2027, evidence pack for the candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | Q4 2027 annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-ITA-2027-01 · drought-to-flood year
- Role spine
- Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| CLI-001 · emissions | public record | reference for the 2027 series | PUBLIC |
| HLT-004 · heat deaths | INI-ITA-HLT-05 | heat surge readiness | PUBLIC |
| WAT-006 · 2023 floods | INI-ITA-DFL-01 | drought-to-flood year | PUBLIC |
| WAT-007 · hydrogeological exposure | INI-ITA-HGR-02 | exposure register | PUBLIC |
| WAT-008 · network losses | GS-01 Water edition | loss and storage note | PUBLIC |
| GEO-010 · seismic and volcanic | INI-ITA-GEO-04 | readiness note | PUBLIC |
| FIN-011 · insurance cover | INI-ITA-FIN-03 · key F review | loss sharing | PUBLIC |
| SYS-012 · compound pathway | MSN-ITA-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the national pathway | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| National weather and hydrogeological alerts | Dipartimento della Protezione Civile | daily | early-warning rung |
| Seismic and volcanic monitoring | INGV | real time | RSK-ITA-GEO-004 |
| Water-severity bulletins | basin district authorities | weekly in season | RSK-ITA-WAT-002 |
| Heat-health alert bulletins | Ministry of Health | daily in season | RSK-ITA-CLI-001 |
| Electricity data | Terna | real time | ENE findings |
| Landslide and flood inventories (IdroGEO) | ISPRA | periodic | RSK-ITA-CLI-003 |
| Fire-danger forecasts | EFFIS · regional services | daily in season | wildfire |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- quarterly publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-ITA-001 | Drought followed by intense rainfall on dried soils1424 | CORROBORATED | WAT · INF | initiative A-01 |
| SIG-ITA-002 | Uplift and seismicity at the Campi Flegrei16 | CORROBORATED | GEO · HLT | initiative A-04 |
| SIG-ITA-003 | Low compliance with the business insurance mandate13 | PARTIAL | FIN | initiative A-03 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 14Regione Emilia-Romagna (ed.), Alluvione di maggio 2023: rapporto sugli eventi e stima dei danni. Regione Emilia-Romagna, Bologna, 2023.back
- 24Autorità di bacino distrettuale del fiume Po (ed.), Osservatorio permanente sugli utilizzi idrici: bollettini di severità idrica 2022. AdBPo, Parma, 2022.back
- 16INGV (ed.), Campi Flegrei: bollettini di sorveglianza 2024–2025. Osservatorio Vesuviano, Naples, retrieved 2026-09-30.back
- 13ANIA (ed.), L’assicurazione italiana 2024–2025 and Relazione del Presidente all’Assemblea annuale. ANIA, Rome, July 2025.back