公共投资效率
Public investment builds roads, power, water, schools and hospitals, but money spent does not always become assets that work. Efficiency gaps arise from weak appraisal, project selection, procurement, implementation and maintenance. This page sets out how public investment efficiency is lost and measured, which institutions shape it, and who decides.
公共投资效率:风险如何演变。
Evidence and capital planning. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
成本超支和延误
Optimistic estimates, scope changes and weak contract management raise costs and delay the benefits projects were meant to bring.
维护被推迟
Budget pressure cuts maintenance first, which shortens asset life and raises the cost of replacing assets later.
采购廉洁性
Collusion and corruption in procurement raise prices and lower quality. Open contracting and audit reduce the risk.
项目所在位置,以及由哪一层提供保障。
发展项目与危害和贫困的交汇之处,以及由哪一融资层提供保障。项目和设计数值均为假设。
衡量什么,以及衡量得如何。
每个指标都注明其单位、频率、背后的来源类型以及数值将附带的证据标签。此处不显示数值:数值由计划依据其自身权限提供。
| 指标 | 单位 | 节奏 | 来源类型 | 标签 |
|---|---|---|---|---|
| 公共投资 | 占 GDP 的百分比 | 年度 | 政府财政统计 | 已发布统计 |
| 公共投资效率差距 | 百分比 | 定期 | IMF estimates | 估算 |
| PIMA institutional strength scores | score by institution | 每次评估 | IMF PIMA 报告 | 已发布统计 |
| Projects with completed cost-benefit appraisal | 已批准项目占比 | 年度 | 政府记录 | 已声明 |
| 已完工项目的成本超支 | percent of original budget | 每个项目 | 项目完成报告 | 已报告 |
| 按开放合同方式公布的合同 | 占比 | 年度 | 开放合同数据 | 观测 |
Trace a shock in public investment efficiency to the balance sheet.
Assembled from the Nexus Standards area profile Disaster and climate risk finance: the shocks it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Pick an initiating shock and step through the cascade to see which exposures it reaches and where losses could concentrate. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise, not a forecast, a valuation, a rating or investment advice. To model a place of your own choosing, open the full System Builder.
灾害
- 热带气旋
- 地震
- 冰塞洪水
- 风暴潮(在下游引发)
- 强降雨(在下游引发)
- 河流洪水(在下游引发)
- Flash flood (set off downstream)
- 危险海浪(在下游引发)
- 大范围停电(在下游引发)
- 大规模流离失所(在下游引发)
- 沿海洪水(在下游引发)
- Aftershock sequence (set off downstream)
- Fault surface rupture (set off downstream)
- Soil liquefaction (set off downstream)
- Slope slide (set off downstream)
- Rockfall (set off downstream)
- Tsunami (set off downstream)
- Building collapse (set off downstream)
控制措施
NS-0章程与原则NS-3风险记录 UNI(语法、旧编码对照、分配机构)NS-9情境 UNI(部署、实例、计划实例)NS-10政策和条款(机器可读的义务:定义、约束、评估和执行)NS-11验证与监测(证据、证明、零信任符合性观测)NS-14符合性及与外部标准的对照NRS-F8参数化与指数型风险转移NRS-F7灾害风险融资与预先安排的融资NRS-H113危害类别:金融体系脆弱性(NHS-1 soc.financial-system)NRS-H114危害类别:宏观经济与财政冲击(NHS-1 soc.macro-fiscal)NRS-D1风险知情的发展与项目筛查NRS-H28危害类别:气候状态转变(NHS-1 eco.climate-state)
观测
- ERA5 再分析(Copernicus Climate Data Store)(仅列作参考)
- CHIRPS quasi-global gridded precipitation (listed for reference)
- USGS earthquake GeoJSON summary feeds (listed for reference)
- 为国家减少灾害风险行动提供的国际公共支持总额(仙台指标 F-1)
- 灾害造成的直接经济损失与全球国内生产总值之比
示例地理范围
- 西欧:152 个六边形网格
- 过去半小时降雨率(IMERG),NASA GIBS
- 今夜夜间灯光与停电(VIIRS 昼夜波段),NASA GIBS
- 穿透云层的地表水,30 m(OPERA DSWx-S1 雷达),NASA GIBS
- 地表土壤湿度(SMAP),NASA GIBS
证据来自何处。
具名公共数据集与机构记录,各自注明许可类别。依协议获得的来源仅按其条款使用,绝不再次发布。
| 来源 | 它提供什么 | 许可类别 |
|---|---|---|
| IMF Public Investment Management Assessments | 公共投资机构的实力 | 免费,遵循 IMF 条款 |
| IMF 投资与资本存量数据集 | 公共和私人投资与资本存量 | 免费,遵循 IMF 条款 |
| PEFA 评估 | 公共财政管理绩效 | 免费,适用 PEFA 条款 |
| Open Contracting Partnership 数据 | Published procurement data | 按发布方确定许可 |
| Multilateral development bank project completion reports | Outcomes of financed projects | Free, terms per bank |
What public investment efficiency means for exposure, loss and capital.
风险官、监管者或财政部会要求的风险暴露、损失、情景和资本视图,以及它们据以报告的框架。结构遵循监管和精算实务。数值为说明性:绝非价格、评级或建议。
资本、偿付能力和财政指标
风险官员、监管者或财政部在公共投资效率方面首先查看的指标。
| 指标 | 单位 | 谁来阅读 | 框架 |
|---|---|---|---|
| 公共债务 | 占 GDP 的 % | 财政部、IMF | 债务可持续性框架 |
| 总融资需求 | 每年占 GDP 的 % | 财政部、投资者 | 债务可持续性框架 |
| 或有负债 | 占 GDP 的 %,按来源划分 | 财政部门 | 财政风险声明 |
| 利息占收入的比重 | 占收入的百分比 | 财政部、评级使用方 | 公共财政统计 |
| 主权利差 | 高于基准的基点 | 投资者、债务管理者 | 市场数据 |
| CET1 比率 | 占风险加权资产的百分比 | 银行、监管机构 | 巴塞尔框架 |
| 流动性覆盖率 | 压力流出的 % | 银行、中央银行 | 巴塞尔框架 |
由谁决定,以及证据服务于什么。
公共财政与主权债务 负责准备证据。以下决定由所指明的主管机构依其自身规则作出,绝不由平台作出。
| 谁来决定 | 问题 | 本页面服务的证据 |
|---|---|---|
| 财政与规划部门 | 项目如何评估、遴选和获得资金 | PIMA 评估结果与评审实践 |
| 采购主管部门 | 合同如何招标和管理 | 采购数据和审计结果 |
| 审计机构 | 投资是否创造了价值 | 项目和支出记录 |
| Development lenders | 资助哪些项目以及如何支持机构 | Completion reports and assessments |
该主题产生的产出
- Guide to the public investment management cycle
- Method note on efficiency gap estimates
- 关于维护与资产寿命的简报
- 面向规划部门的项目遴选问题
专家提出的问题。
- How much of the value of public investment is lost through inefficiency, and why?
- 项目如何评估、选择和排序?
- How do maintenance and operating costs affect the long-term value of public assets?
- How should climate resilience be built into public investment planning?
- How does fiscal consolidation affect public investment, and with what consequences?
驱动因素与动态。
公共投资管理涵盖规划、项目评估、预算编制、采购、实施和维护。任何一个环节的薄弱都会降低公共资本的回报。对公共投资管理的国际评估发现,各国之间的效率存在显著差异,并指出了与更好结果相关的制度做法,包括严格的项目评估、多年期预算编制和透明的采购。
When governments consolidate their budgets, public investment is often cut first because it is easier to delay than current spending. This can protect short-term budgets at the cost of long-term growth and resilience. Underspending on maintenance allows assets to deteriorate, creating larger costs later and increasing vulnerability to hazards.
问题与解答。
What is a public investment efficiency gap?
What is a PIMA?
为什么维护对债务很重要?
公共投资效率为何对债务很重要?
Why is maintenance often neglected?
GRA 是否评估公共项目?
GRA 是否就此主题提供建议?
从本页贡献证据。
Reports 是联合体的季刊。您对该主题的了解可以成为下一期中的证据、案例或更正,署名归您,并在属于您本人作品时以 CC BY 4.0 发布。
- 电子邮件门户 GW-GRA从本页发送证据、更正、案例、方法、审查、翻译或概况投稿。它会带上本页标签送达,由负责的编辑接收。
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- 报告全球风险联盟(Global Risks Alliance)查看所有贡献方式贡献类型、各自的评审方式、您获得的署名、许可协议,以及绝不接受的内容。
切勿发送个人数据、敏感基础设施细节或您无权分享的任何内容。贡献在使用前会经过审查;发送贡献不赋予署名权或编辑权,赞助也绝不能换取研究结论。
法律文件。
本网站上的地图、数据和图表仅作为背景和一般信息展示。它们不是建议、预测或预警;信息的局限见免责声明和数据说明。