Skip to content

GRA · Public Finance and Sovereign Debt

Spatial financeWhere capital meets hazard, exposure and transition

Analytical and data resources

Platform tools show how shocks move debt: fan-chart sketches, contingent liability maps and spatial views of public assets against hazard. Values are design values; no tool projects a real country.

02Gereedskap

What is published here.

Maps

Released maps

Open the released maps

Models

Reviewed models and scenarios

Open the reviewed models

Scenarios

Sector scenarios

Open the sector scenarios

03Tools and limits

Tools and limits.

ToolShowsGrens
Debt path sketchHow shocks move debtStylised country
Contingent liability mapSources of fiscal riskTemplate
Public asset mapAssets against hazardRegisters incomplete
04Proses

How the process runs.

Process explorer · Process

Analytical and data resources: Layers to published map

7 steps4 stages1 gate

Proses

Analytical and data resources: Layers to published map

Layers enter with their rights, are aligned, analysed and checked for uncertainty, then released after public-safe review; a map is a governed spatial claim.

  1. 01 Data

    1. 01Source layers with their rightsDataset · NXS-GRX (canonical data, provenance and risk)Spatial views of The Global Risks Index (NXS-GRX) products sit under the boundary licence gate. Rights classification sets how a layer may be used.
  2. 02 Harmonise

    1. 02Coordinate reference and boundary versionRecord · NXS-EOP (earth observation and digital twins)The area of interest preserves its coordinate reference system, polygon validity and observation support. Boundary versions are kept.
    2. 03Harmonise units, variables and timeStepUnit metadata, conversion records and transformation logs are required. Alignment is an evidence event, not hidden preprocessing.
  3. 03 Analyse and check

    1. 04Analyse with a recorded processing recipeModel · GIS teamA processing recipe records parameters, calibration, inputs and output lineage. The analysis methods are named in each product’s own record.
    2. 05Spatial uncertainty checkGateSpatial uncertainty is recorded and affects downstream use. A high-uncertainty polygon may suit internal review, not public-safe release.
  4. 04 Publish

    1. 06Spatial metadata bundleRecordThe bundle records boundary type, jurisdiction, geometry version, projection, resolution, source, time window, uncertainty and access class.
    2. 07Public-safe release of the mapDecisionThe output record names the redactions, uncertainty and public-safe reviewer. A map is a governed spatial claim, never merely a picture.

Spatio-temporal intelligence · Data protocols: semantic, jurisdictional and temporal intelligence · NXS-EOPDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The pages cited are design doctrine.

05Build environment

Working with the tools.

Analysis runs in Foundry for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

06Bronne

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

07Pages

Pages in Analytical and data resources.

08Vrae

Questions and answers.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
VerslaeDra by

Dra bewyse vanaf hierdie bladsy by.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks AlliancePublic Finance and Sovereign DebtFinance and Insurance ReadinessCountry Systems Risk and Resilience
Openbare finansies en soewereine skuld

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.