Skip to content

GRA · Development Finance Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Public investment and projects

Most infrastructure in developing economies is financed through the budget, public enterprises and sovereign borrowing, with development banks as lenders and advisers. Whether a project delivers depends largely on what happens before financing: identification, feasibility, appraisal, selection, procurement design, land and safeguards preparation. This page sets out how project risk develops through the preparation cycle, which records evidence it, and who decides at each gate.

02The question

Public investment and projects: how the risk develops.

Infrastructure preparation and risks. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Optimism at appraisal

Cost estimates and demand forecasts made to secure approval tend to be optimistic. Reference class forecasting and independent review exist because the bias is systematic across sectors and countries, not accidental.

Mechanism

Preparation gaps become delays

Incomplete feasibility, design, land acquisition or resettlement planning delays the start of works while commitment fees and price escalation continue. Delay cascades into cost overruns, scope cuts and restructuring.

Mechanism

Procurement shapes risk transfer

Contract type decides who carries ground, design, price and schedule risk. Poorly packaged contracts, thin bidder fields and weak contract management move risk back to the public client through claims and variations.

Mechanism

Maintenance decides the return

An asset built but not maintained delivers less service over a shorter life. Maintenance competes with new projects in every budget round and usually loses, turning a stock of assets into a contingent liability.

03Spatial finance

Where projects sit, and which layer protects them.

Where development projects meet hazard and poverty, and which financing layer protects them. Hypothetical projects and design values.

Development projects in Mozambique and Malawi against hazard and poverty, with the financing layer that would protect each.Hypothetical projects and design values; no country's strategy is shown.
04Indicators

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
Cost overrun at completionpercent of appraised costper projectMDB completion reportsPublished statistics
Schedule slippage against appraisalmonthsper projectMDB completion reportsPublished statistics
Time from approval to first disbursementmonthsper projectMDB operations dataPublished statistics
Bidders per competitive tendercountper tenderProcurement records in the Open Contracting Data StandardPublished statistics
Contracts with published award and contract datapercent of public contracts by valueannualOpen contracting publishersREPORTED
Capital budget execution ratepercent of approved capital appropriationannualBudget execution reportsPublished statistics
Outcome rating at completionrating scale (highly unsatisfactory to highly satisfactory)per projectIndependent evaluation unitsPublished statistics
Maintenance allocation against asset basepercent of estimated asset replacement valueannualBudget documents, asset registersESTIMATED
05Monitor

Project pipeline and safeguards.

The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.

Project pipeline and safeguards

Public investment and projects · Country programme D · Pipeline review 3

Safeguard finding openGRA · Development Finance Nexus

Pipeline

Irrigation rehabilitationFood and waterMediumClearAppraisal
Port expansionInfrastructureHighFindingPreparation
SME credit lineFinanceLowClearBoard
Mini-grid programmeEnergyLowClearImplementation

Handoff

Readiness dossier
v2, reviewed
Receiving institution
development finance institution
Decision
theirs, not GRA's
Record
HO-967

Projects and hazard

red: high hazard exposure

Circle size: exposure value · exampleN
Project pipeline and safeguards: the screen's structure, terms and states for Public investment and projects.Example names and illustrative values; a design, not a record or a live system.
06Sources

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

SourceWhat it givesLicence class
World Bank Projects and Operations dataApprovals, financing, ratings and documents for each operationCC BY 4.0
Independent Evaluation Group project ratings (World Bank)Validated outcome ratings from completion reportsCC BY 4.0
Open Contracting Data Standard publications (Open Contracting Partnership data registry)Tender, award, contract and implementation data published by governmentsOpen licence declared by each publisher
IMF Public Investment Management Assessment reportsInstitutional ratings across planning, allocation and implementationPublic where published by the authorities, IMF terms
World Bank Benchmarking Infrastructure DevelopmentRegulatory quality of PPP and public procurement of infrastructure across the project cycleCC BY 4.0
AfDB, ADB and IDB project portalsDisclosed appraisal, procurement and completion documentsPublic under each bank's disclosure policy
National public investment registers and audit reportsPipeline status, appraisal documents and audit findingsPublic records, terms per government
07Twin and cascade simulator

Trace a shock in public investment and projects to the balance sheet.

Assembled from the Nexus Standards area profile Disaster and climate risk finance: the shocks it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Pick an initiating shock and step through the cascade to see which exposures it reaches and where losses could concentrate. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise, not a forecast, a valuation, a rating or investment advice. To model a place of your own choosing, open the full System Builder.

Hazards

  • Tropical cyclone
  • Earthquake
  • Ice-jam flood
  • Storm surge (set off downstream)
  • Intense rainfall (set off downstream)
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Dangerous surf (set off downstream)
  • Widespread power outage (set off downstream)
  • Mass displacement (set off downstream)
  • Coastal flood (set off downstream)
  • Aftershock sequence (set off downstream)
  • Fault surface rupture (set off downstream)
  • Soil liquefaction (set off downstream)
  • Slope slide (set off downstream)
  • Rockfall (set off downstream)
  • Tsunami (set off downstream)
  • Building collapse (set off downstream)

Controls

  • NS-0 Constitution and principles
  • NS-3 Risk record UNIs (grammar, legacy crosswalk, allocation authority)
  • NS-9 Contextual UNIs (deployments, instances, programme instances)
  • NS-10 Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
  • NS-11 Verification and monitoring (evidence, attestations, zero-trust conformance observation)
  • NS-14 Conformance and crosswalk to external standards
  • NRS-F8 Parametric and index-based risk transfer
  • NRS-F7 Disaster risk finance and pre-arranged finance
  • NRS-H113 Hazard family: Financial-system fragility (NHS-1 soc.financial-system)
  • NRS-H114 Hazard family: Macroeconomic and fiscal shocks (NHS-1 soc.macro-fiscal)
  • NRS-D1 Risk-informed development and project screening
  • NRS-H28 Hazard family: Climate-state shifts (NHS-1 eco.climate-state)

Observation

  • ERA5 reanalysis (Copernicus Climate Data Store) (listed for reference)
  • CHIRPS quasi-global gridded precipitation (listed for reference)
  • USGS earthquake GeoJSON summary feeds (listed for reference)
  • Total public international support for national disaster risk reduction actions (Sendai indicator F-1)
  • Direct economic loss attributed to disasters in relation to global GDP

Example geography

  • Western Europe: 152 hexagonal cells
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
08Decisions

Who decides, and what the evidence serves.

Development Finance Nexus prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Who decidesThe questionEvidence this page serves
Finance ministries and public investment unitsWhether a project is ready to enter the budget or the borrowing programmeFeasibility, appraisal and safeguards evidence by gate; reference class ranges for cost and time
MDB management and boards of executive directorsWhether to approve a loan and with which conditions of effectivenessPreparation status, procurement plan, safeguard instruments, implementation capacity
Line ministries and implementing agenciesHow to package contracts and allocate ground, design and price riskProcurement records for comparable contracts, bidder fields, claims history
Supreme audit institutionsWhether completed projects delivered what was appraisedCompletion ratings, cost and schedule against appraisal

Outputs this topic produces

  • Preparation profiles showing which gates are evidenced and which remain open
  • Reference class comparisons of cost and schedule from completed operations, with sources
  • Procurement evidence drawn from open contracting data
  • Question sets for appraisal and selection review
09Exposure, loss and capital

What public investment and projects means for exposure, loss and capital.

The exposure, loss, scenario and capital views a risk officer, supervisor or ministry of finance would ask for, with the frameworks they report against. Structures follow supervisory and actuarial practice. Values are illustrative: never prices, ratings or advice.

Transmission channels

How a shock in public investment and projects reaches credit, market, underwriting, liquidity and operational risk, and feeds back.

Channel structure after the Basel Committee's work on climate-related risk drivers and transmission channels; links shown are typical paths, not estimated exposures.
NGFS climate scenarios · Network for Greening the Financial SystemIFRS S2 Climate-related Disclosures · ISSBTCFD recommendations · Financial Stability Board TCFDPrinciples for the effective management of climate-related financial risks · Basel Committee on Banking Supervision
10Core questions

What the industry asks.

Public investment can raise growth and welfare, but its returns depend on management. Projects chosen for political rather than economic reasons, designs that ignore hazards, cost overruns and poor maintenance all reduce value. As climate change alters hazards over the life of assets, decisions made today determine exposure for decades. Strengthening public investment management is therefore a resilience measure in its own right.

  • How are projects selected, and is the choice informed by appraisal of costs, benefits and risks?
  • Do designs account for current and future hazards over the full life of the asset?
  • How are construction, cost and schedule risks managed and shared between public and private parties?
  • Is maintenance funded, so that assets keep delivering services and resist shocks?
11Mechanisms

How risk and finance interact.

Project outcomes are shaped at every stage of the investment cycle.

Selection

Appraisal and prioritisation

Cost-benefit and multi-criteria appraisal help choose projects that deliver most value. Weak appraisal is a common source of poor outcomes.

Design

Resilient engineering

Siting, standards and design choices determine exposure to floods, heat and other hazards. Engineering science: Critical Infrastructure.

Operation

Maintenance and management

Underfunded maintenance shortens asset life and raises vulnerability to shocks.

Research on public investment efficiency finds substantial differences between countries in how much value they obtain from each unit spent, and attributes much of the difference to institutions: planning, appraisal, procurement, budgeting and maintenance. Resilience fits naturally into this framework, because the same institutions decide whether hazards are considered and whether assets are kept in good condition.

12Methods and evidence

How the evidence is built, and its limits.

  1. 01

    Public investment management assessment

    Established diagnostic frameworks assess institutions across the investment cycle. Results describe systems, not individual projects.

  2. 02

    Cost-benefit analysis

    Economic appraisal using economics and development economics, including resilience benefits. Valuing avoided losses requires assumptions about hazard probability.

  3. 03

    Hazard screening

    Screening of project sites against hazard data, using geospatial information systems. Data resolution and future climate uncertainty limit precision.

  4. 04

    Ex post evaluation

    Evaluation of completed projects, using causal inference and impact evaluation where feasible. Evaluations are often delayed and not always published.

13Methods

How it is studied, and what the methods cannot say.

  1. Economics and development economicsEconomic appraisal of a project · Debt sustainability context · Tariff and subsidy incidenceApplied here
  2. Decision analysis under uncertaintyRobust choice of design standard · Multi-criteria pipeline screeningApplied here
  3. Geospatial information systemsSafeguard screening of a project footprint · Physical climate exposure of assetsApplied here
  4. Causal inference and impact evaluationEvaluating a credit line or guarantee · Infrastructure impact on householdsApplied here
14Questions

Questions and answers.

Why are cost overruns so common?
Estimates are made early, under pressure to secure approval, with incomplete ground and design information. Reference class forecasting corrects for this by comparing a project with the record of similar completed projects.
What is project preparation finance?
Funding for feasibility studies, design, safeguards and transaction advice before investment. MDB facilities and programmes such as PPIAF fund it because underprepared projects are a leading cause of delay.
Does Development Finance Nexus appraise projects?
No. Appraisal belongs to the borrower and the lenders under their own policies. The platform sets out what evidence an appraisal draws on and labels it.
Does resilient design cost more?
Sometimes more at the outset, but analyses often find that avoided losses and lower repair costs over the asset's life outweigh the extra cost. Results depend on the hazard and the asset.
Why is maintenance a resilience issue?
Poorly maintained assets fail sooner and suffer more damage in shocks. Maintenance budgets are often the first cut under fiscal pressure.
Does GRA appraise projects?
No. It does not appraise, rate or recommend projects. It publishes shared understanding of evidence and methods.
What is a public investment management assessment?
A structured review of how well a government plans, allocates and implements public investment, used to identify institutional improvements.
ReportsContribute

Contribute evidence from this page.

Reports is the Consortium's quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks AllianceDevelopment Finance NexusFinance and Insurance ReadinessPortfolio and Readiness
Development Finance Nexus

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.