GRA · مخاطر النظام المالي
التمويل المكانيحيث يلتقي رأس المال بالخطر والتعرّض والتحول
المدفوعات والبنية التحتية للسوق
Payment systems, central counterparties, central securities depositories and settlement networks sit at the centre of finance. They concentrate activity by design: efficient, and critical to keep running. The Global Risks Alliance (GRA) examines how real-economy and operational shocks reach clearing, settlement and liquidity, and where concentration turns a local failure into a system-wide one. It operates no payment service and moves no money. Part of Financial-system risk.
Payments and market infrastructure on the record.
- 01المؤسسةThe Global Risks Alliance (GRA)
- 02TransmissionHow shocks reach market infrastructure
- 03StandardsThe principles market infrastructure runs on
- 04Network methodSettlement as a network with physical nodes
- 05أسئلةالأسئلة المشتركة التي يعمل عليها GRA
- 06BoundaryAnalysis, never operation
- 07متصلالموضوع نفسه عبر الكونسورتيوم
How shocks reach market infrastructure.
| القناة | كيف تصل الصدمة إلى القطاع المالي |
|---|---|
| Operational outage | A failure at an infrastructure or its provider halts payments or settlement for many participants |
| السيولة | Margin calls and settlement delays create sudden liquidity needs across participants |
| التركيز | Activity concentrated in few infrastructures and providers magnifies any single failure |
| Cross-border dependency | Infrastructures in one jurisdiction depend on networks and providers in others |
| المخاطر الطبيعية المادية | Power, communications and site hazards threaten continuity |
تصف القنوات آليات، لا قوى مقيسة ولا احتمالات.
The principles market infrastructure runs on.
| الأداة | الهيئة | التركيز |
|---|---|---|
| Principles for Financial Market Infrastructures (2012) | CPMI-IOSCO | Credit, liquidity, settlement, operational and general business risk for payment systems, CSDs, SSSs, CCPs and trade repositories |
| Guidance on cyber resilience for FMIs (2016) | CPMI-IOSCO | Governance, protection, detection, response and recovery of critical operations |
| Central counterparty resolution guidance | FSB | Resolution planning and loss allocation for systemically important CCPs |
| G20 cross-border payments roadmap | FSB and CPMI | Targets for cost, speed, access and transparency of cross-border payments |
المستوطنة بوصفها شبكة ذات عُقد مادية.
Market infrastructure is analysed as a network: participants as nodes, settlement and clearing obligations as edges. Concentration measures show which nodes carry the most flows; failure simulation removes a node and traces unsettled obligations and liquidity needs. GRA adds physical geography to the graph. Primary and backup sites, power and telecom dependencies and their hazard exposure become node attributes, so a flood or grid event can be read as a network event.
Network science methods are described at GCRI network science; specialist work continues at Payments and Market Infrastructure.
أسئلة مشتركة يعمل عليها GRA.
- 01
الاعتماديات المشتركة
Which power, network and cloud dependencies do infrastructures and their participants share?
- 02
Liquidity under compound shocks
How would a combined operational and market shock change liquidity needs, described with bounded assumptions?
- 03
Recovery realism
Do recovery arrangements assume providers and sites that would fail in the same event?
- 04
الخدمات العامة
Which public payments depend on the same infrastructure, and what happens when it stops?
Analysis, never operation.
- GRA operates no payment, clearing or settlement service and holds or moves no money for anyone.
- It does not oversee, assess or certify any infrastructure; oversight remains with competent authorities.
- No participant’s confidential operational information is exchanged with another.
- Related: Cyber and operational and Systemic stability.
الموضوع ذاته عبر الاتحاد.
المدفوعات والبنية التحتية للأسواق
The specialist community: Payments and Market Infrastructure.
البنية التحتية الحيوية
أدلة من المركز العالمي للمخاطر والابتكار (Global Centre for Risk and Innovation، GCRI): البنية التحتية الحيوية.
Where this page’s references lead.
الهيئات والوثائق التي تُقرأ هذه الصفحة في ضوئها. وتتغير الحالات والإصدارات؛ ويقود كل رابط إلى الهيئة المُصدِرة.
أسئلة وأجوبة.
Does GRA run a payment or settlement platform?
Who uses this analysis?
Why does concentration matter?
How does this connect to physical risk?
ساهم بأدلة من هذه الصفحة.
Reports هي المطبوعة الفصلية للاتحاد. ويمكن لما تعرفه عن هذا الموضوع أن يصبح دليلًا أو حالة أو تصويبًا في الإصدار التالي، يُنسب إليك ويُنشر بموجب CC BY 4.0 حيثما كان من عملك الخاص.
- البريد الإلكترونيالبوابة GW-GRAأرسله من هذه الصفحةدليل أو تصحيح أو حالة أو أسلوب أو مراجعة أو ترجمة أو مدخل لملف قُطري. يصل موسومًا بهذه الصفحة، فيتلقاه المحرر المسؤول عنها.
- Zenodoإيداع مفتوحأودِعه وقدّمه إلى المجتمعانشر سجلك الخاص على Zenodo بمعرّف ORCID iD الخاص بك، ثم قدّمه إلى مجتمع Reports هناك. يراجعه القيّمون، ويبقى معرّف DOI ملكًا لك.
- ReportsGlobal Risks Allianceاطّلع على جميع سبل المساهمةأنواع المساهمات، وكيفية مراجعة كل منها، والإسناد الذي تحصل عليه، والترخيص، وما لا يُقبل أبداً.
لا ترسل أبدًا بيانات شخصية أو تفاصيل حساسة عن البنية التحتية أو أي شيء لا يحق لك مشاركته. تُراجَع المساهمة قبل استخدامها؛ ولا يمنح إرسالها أي حقوق تأليف أو تحرير، ولا تشتري الرعاية أي نتيجة أبدًا.
اعرض على التحالف سؤالًا يتعلق بالتعرّض أو رأس المال.
المعلومات والاستفسارات متاحة اليوم. ويحصل الاستفسار على رقم مرجعي ويحدد الخطوة التالية؛ ولا تُفتح الطلبات والمدفوعات وتخصيصات الحوسبة والتسجيلات إلا حين يتوافر فريقها وشروطها وقدرة المراجعة.
الوثائق القانونية.
تُعرض الخرائط والبيانات والأشكال في هذا الموقع للسياق والمعلومات العامة. وهي ليست نصيحة ولا توقعات ولا إنذارات؛ وحدود المعلومات مبيّنة في إخلاءات المسؤولية وإشعارات البيانات.