Skip to content

GRA · AI and Financial Model Risk

Spatial financeWhere capital meets hazard, exposure and transition

Analytical and data resources

Platform tools make مەترسیی مۆدێل visible: inventory templates, drift monitors on public data and shared-model maps. Values are design values; no tool validates a real model.

01شوێنی کار

The workspace for analytical and data resources.

بۆری کار

Analytical and data resources · Workspace WS-21 · Example interface, not a record

One stage waitingGRA · AI and Financial Model Risk

Stages

  1. Ingest4 سەرچاوە
  2. پشتڕاستکردنەوەschema · licence
  3. Transformversioned
  4. مۆدێلArtificial
  5. تاقیکردنەوەheld-out
  6. Releasewith limits

ئارتیفاکتەکان

Model inventoryv4.0کراوەئامارە بڵاوکراوەکان
Validation reportsv2.3بۆ پشکنینASSESSED
Monitoring metricsv2.7کراوەچاودێریکراو
Usage logsv5.7کراوەچاودێریکراو

Compute quota

share used vs alert level

CPU hours28 used of 80 used limitStorage49 used of 90 used limitGPU hours36 used of 70 used limit
Pipeline.ڕووکاری نموونەیی؛ داتای ڕاستەوخۆ نییە.

AI and Financial Model Risk · Pipeline. Pipeline: example names and illustrative values, not a record.

02ئامرازەکان

What is published here.

نەخشەکان

Released maps

Open the released maps

مۆدێلەکان

Reviewed models and scenarios

Open the reviewed models

سیناریۆکان

Sector scenarios

Open the sector scenarios

03Tools and limits

Tools and limits.

ئامرازShowsسنوور
Model inventory templateFields a reviewer needsTemplate only
Drift sketchHow drift metrics moveSynthetic data
Shared-model mapCommon dependenciesزانیاریی گشتی

In AI and Financial Model Risk, a released map states its hazard layer and resolution, a model its assumptions and validation, and a scenario its narrative, for example regime shift. Values shown before release are design values.

04پرۆسە

چۆن پرۆسەکە کار دەکات.

Process explorer · Process

Analytical and data resources: Build, sign and accept

10 steps4 قۆناغ2 دەروازە

پرۆسە

Analytical and data resources: Build, sign and accept

An admitted mission becomes a cycle project; the build is pinned, verified and signed, and the Global Risks Forum (GRF) records acceptance for exercise, not permission to deploy.

  1. 01 Request and sources

    1. 01Admitted mission becomes a cycle projectتۆمار · Universe to FoundryAn admitted mission becomes a cycle project with a decision case.
    2. 02Qualify data sources and resourcesStep · the Global Centre for Risk and Innovation (GCRI)GCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
  2. 02 Build and verify

    1. 03Source snapshotتۆمار · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
    2. 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
    3. 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
    4. 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
  3. 03 Sign and admit

    1. 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
    2. 08Package admissionStep · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
  4. 04 Accept

    1. 09ڕاپۆرتی بنیاتنانی سەرەکیتۆمار · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
    2. 10G3 · Build بۆ ڕاهێنان وەرگیراوەدەروازە · Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.

ساڵی پڕۆگرام · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.

05Build environment

Working with the tools.

Analysis runs in Foundry for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

06سەرچاوەکان

Where this page’s references lead.

ئەو لەش و بەڵگەنامانەی ئەم لاپەڕەیەیان لەگەڵ دەخوێنرێتەوە. دۆخ و وەشانەکان دەگۆڕێن؛ هەر بەستەرێک دەچێتە لای لەشی دەرکەر.

07لاپەڕەکان

Pages in Analytical and data resources.

08پرسیارەکان

پرسیار و وەڵام.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
Reportsبەشداربە

لەم لاپەڕەیەوە بەڵگە پێشکەش بکە.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks Allianceزیرەکی دەستکرد و مەترسی مۆدێلی داراییڕێگا و تەکنیکیتەکنەلۆجیای ئێکسپۆنێنشیاڵ
زیرەکی دەستکرد و مەترسی مۆدێلی دارایی

Bring an exposure or capital question to the Alliance.

زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.