Skip to content

GRA · 关于 GRA

理事会与治理

全球风险联盟(Global Risks Alliance,GRA)是在美国内华达州注册的非营利公司,以行业协会形式服务于金融服务业。其公司文件规定其董事会、监督机制和法律身份。治理事实只有在有记录时才会在此列出。在通过并经审查之前,任何文件均不被描述为已生效。所属栏目: 关于 GRA.

02公司治理

先有记录,再有角色。

GRA 不以营利为目的。它服务于金融服务行业的共同商业利益,而非任何成员的私人商业利益。其公司文件规定了谁可以代表它行事、如何作出决策,以及如何保护其宗旨。

法律身份

One US organisation

GRA is a nonprofit corporation registered in Nevada, United States, operating as a business league for the financial services industry, with its address at 4500 Forbes Blvd., Suite 200, Lanham, MD 20706, United States. It speaks only for itself.

权限

Set by corporate documents

谁可以代表 GRA 行事以及在何种限度内,依据其公司文件确定。参与某个平台或工作组并不产生任何授权。

状态

Published as recorded

仅当有当前经核实的记录作为依据时,本网站才会列出董事会构成、负责人和委员会。

03监督涵盖的内容

The governance record GRA is designed to publish.

区域已发布记录旨在呈现的内容当前状态
董事会和高级职员谁以何种身份任职、自何时起任职经核实后发布;参见 人员与问责角色
Bylaws and member rights权利、义务及任何表决事项,依章程规定Terms not yet published; see member governance
竞争政策Rules for every meeting, working group and exchange of information尚未采纳;有书面政策
利益冲突与赞助声明、回避和资金披露设计见 独立性与利益冲突
年度问责GRA 做了什么、没有做什么,以及更正了什么通过 机构年度回顾

No row on this page implies that a document has been adopted. Each entry changes only when its record exists.

04流程

流程如何运行。

Process explorer · Process

谁决定什么

16 steps5 stages4 gates

流程

谁决定什么

每项决定都有一名在案的问责决策者;方案提供信息,由主管部门在方案之外作出决定。

  1. 01 原则

    1. 01每项决定都有一名负责的决定者标准该计划中的每项决定都有一名负责决策人,该决策人有案可查。
  2. 02 谁负责什么

    1. 03一体化联盟秘书处行动方 · 全球风险与创新中心(Global Centre for Risk and Innovation,GCRI Canada)GCRI Canada 在经批准的牵头授权范围内,承担综合秘书处职责。
    2. 04Evidence, methods and technical assistanceActor · GCRIGCRI’s technical and evidence stewardship turns problems into testable questions and reusable capability.
    3. 05领导力、召集与 宇宙 治理参与方 · 全球风险论坛(Global Risks Forum,GRF)GRF 在其文书范围内,负责领导、召集和 Universe 治理。
    4. 06金融、保险与发展准备度参与方 · 全球风险联盟(Global Risks Alliance,GRA)GRA 对准备就绪情况负责。风险证据成为有用的尽职调查材料,而不是批准或交易。
    5. 07国家议程与地方参与行动方 · 主管的 国家 Nexus 机构具备资格的国家级 Nexus 机构负责国家议程和地方参与。国家自主先于联合。
    6. 08科学与编辑接受行动方 · 合格且已管理利益冲突的审查人和发布方合格且已管理利益冲突的审稿人与出版方共同决定科学和编辑方面的采纳。
    7. 09各机构分别声明自身的边界标准GCRI、GRF 和 GRA 各自在声明的限度内开展工作。准备就绪不等于获得批准。
  3. 03 项目年度的关口

    1. 12G0 · 年度计划获授权关口 · Global Risks ForumGRF 作出四类决定:任务授权(G0)、准入(G1)、关口决定和发布(G6)。G0 授权年度方案。
    2. 14G1 · 任务获准入关口 · Global Risks ForumGRF 接纳任务时会记录理由。没有负责的所有者,它就不能接纳任务。
    3. 15关口决策 G2 至 G5 及 G7关口 · Global Risks Forum每个关口都会记录一项决定,未通过的关口将中止其所管辖的工作。周期关口是一项计划层面的决定。
    4. 16G6 · 发布获授权关口 · Global Risks ForumGRF 授权发布已通过科学审查和编辑审查的结果。它不能发布个人数据。
  4. 04 标准决定与投诉

    1. 10标准决策权(拟议)标准理事会作决定,工作组负责起草,其余一切公开。该模式为拟议方案。
    2. 11投诉与申诉步骤由不对争议决定负责的人员审查项目投诉或决定投诉。
    3. 13五项不变量在整个矩阵中均成立标准每项决定有且仅有一名决定方。全球和国家标准机构绝不相互代为决定。
  5. 05 项目之外

    1. 02主管当局行动方 · 主管当局主管部门独立于本计划之外。由主管部门作出决定,本计划提供信息。

Decision rights · Governance in operation · The Global Risks ForumDesigned process, not a record of any case: no cycle has run and every programme is at service level R0, information and enquiries. A gate is a programme decision, never a public-authority approval, a certification or a deployment authorisation. The competent authority decides.

05联合体关系

A shared programme does not merge governance.

GRA leads the Nexus Consortium with The Global Centre for Risk and Innovation (GCRI) and The Global Risks Forum (GRF). Each pillar institution keeps its own governance, finances and liability. GCRI works through GCRI Canada, its lead organisation and the Consortium Secretariat, and through GCRI US, a separate organisation. GRF governs the annual Universe programme. GRA is not the legal parent, agent or treasury of any consortium. An agreement between the institutions appears here only with a record. GCRI’s governance: About GCRI. GRF’s: Governance and trust.

06问责

Who reviews a governance concern.

  • Corrections and integrity concerns go to the integrity concern form, open to anyone without membership or payment.
  • Competition-law and conduct concerns go to the integrity and conduct concern form, raised in confidence.
  • 对某项决定的投诉,设计上由不负责被质疑决定的人员审查,并说明理由。
  • 更正将成为有记录的版本,绝不进行无声修改。
07问题

问题与解答。

Who is on the GRA board?
GRA names directors and officers only with a current, verified record. Until such records are published here, nobody should cite this site as evidence that they hold a GRA role.
董事会是否批准 GRA 的研究结论?
Findings carry their evidence labels, methods and limits, and follow review and correction. GRA’s design is that no sponsor or member may approve a publication or change its evidence by virtue of funding or membership.
Does GRA govern the national consortiums?
No. National and regional consortiums operate through their host and lead organisations. GRA leads the finance, insurance and development-readiness interface of the programme and holds no authority over a consortium.
Where can I raise a governance concern?
发送至 诚信关切表。确认回执会提供一个编号并写明下一步。
全球风险联盟(Global Risks Alliance)

向联盟提出风险暴露或资本问题。

信息和咨询现已开放。每项咨询都会获得一个编号,并告知下一步;申请、付款、算力分配和注册只有在相应团队、条款和审查能力就绪时才会开放。