Skip to content

GRA · Üyelik ve katılım

Sektör konseyleri

Industry councils of The Global Risks Alliance (GRA) are designed to bring a sector’s senior representatives together to set its research questions and review its work programme. They are bodies of a private industry association, appointed under council terms. They have no supervisory or regulatory standing and bind no one outside GRA. No council is constituted, and council terms are not yet adopted. Part of membership and participation.

01Sıra

Olayların gerçekleşme sırası.

  1. 01SoruUlusal, bölgesel veya kurumsal öncelik
  2. 02KanıtPlatformun STEM temeli
  3. 03BuildFoundry
  4. 04DüzenleyinNexus ekosistemi
  5. 05SınayınUniverse (bağımsız site)
  6. 06YayımlayınRaporlar
  7. 07Karar verYetkili makamlar ve kurumlar, NXS-RLS (katılımcılar, anlaşmalar ve devirler)
  8. 08YenileyinDüzeltmeler ve bir sonraki yıllık gündem
02Rol

What an industry council is designed to do.

Gündem

Set research questions

Identify the precompetitive questions the sector most needs answered, for working groups and research teams to take up.

Oversight

Review the work programme

Review progress and relevance of the sector’s work, without approving or changing any publication’s evidence.

Öğrenme

Shape capability

Advise on the skills and learning the sector’s professionals need.

03Sektör soruları

Questions industry councils are designed to put on the agenda.

SektörExample research question a council could set
Sigorta ve reasüransHow should protection gaps be measured and reported consistently across perils?
BankacılıkWhich location fields would make collateral-hazard analysis comparable across banks?
Varlık sahipleri ve yöneticileriWhat can portfolio climate metrics show, and what do they miss?
Development and public financeWhat makes a resilience programme ready for a lender’s own appraisal?

A council sets questions; working groups and research teams answer them under review. No council approves or changes a finding. Councils of GRA are separate from the councils of The Global Risks Forum (GRF).

04Süreç

Sürecin nasıl işlediği.

Process explorer · Process

Industry councils: Working group, charter to sunset

9 steps4 stages1 gate

Süreç

Industry councils: Working group, charter to sunset

Bir çalışma grubu, belirli bir süre için kayıtla tüzük alır, sınırları belirli görevleri yerine getirir, taslak hazırlar ve tavsiyede bulunur, ardından yenilenmedikçe feshedilir; benimseme kararı vermez.

  1. 01 Form

    1. 01NLC grubu önerirKarar · Ulusal Liderlik KonseyiNLC çalışma grupları önerir ve liderlik havuzlarından başkanları, editörleri ve uzmanları aday gösterir. Tüzük vermez.
    2. 02Kayıtla tüzükKarar · Ulusal Standartlar KonseyiBir çalışma grubu, en fazla yirmi dört aylık bir süre için kayıtla tüzük alır. Tüzük, kapsamını, rollerini ve karar kuralını belirler.
    3. 03Üyeler yetkinlikleriyle katılırAdım · ÜyelerUzmanlar, uygulayıcılar, öğrenciler ve gönüllüler yetkinlikleriyle katılır. Üyeler çıkarlarını beyan eder ve çatışma durumunda çekilir.
  2. 02 Work

    1. 04Workplan from the national agendaStepAssignments come from the national agenda and the year’s missions. Each states the competence it needs and how the work will be reviewed.
    2. 05Aylık olarak teslim edilen taslaklar ve çıktılarKayıtGruplar aylık teslimat yapar. Standartlar için ulusal profili ve sapma kaydını taslak olarak hazırlar, ulusal kamuoyu görüşünü ve pilot uygulamaları yürütür.
  3. 03 İnceleme

    1. 06Katkı kaydı ve incelemesiGeçitHer katkı kaydedilir ve incelenir. Bir çalışma grubu taslak hazırlar ve tavsiyede bulunur; benimseme kararı vermez.
    2. 07Tanınma kaydı izlerKayıtKatkı kayıtları tutulur; böylece tanınma kaydı izler.
    3. 08Ulusal benimseme başka bir yerde kararlaştırılırKarar · Ulusal Standartlar KonseyiUlusal Standartlar Konseyi benimseme biçimine ve ulusal profile karar verir. Çalışma grubu önerir ve asla karar vermez.
  4. 04 Kapanış

    1. 09Dissolved by default, or renewed by recordDecision · National Standards CouncilA group is dissolved by default at the end of the timebox. The National Standards Council renews or closes it, on the NLC’s proposal.

National Working Groups · National Standards Council · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No working group is constituted. The charter rules belong to the proposed Nexus Standards working model.

05Sınırlar

What an industry council never is.

A council isBu değildir
A body of a private industry associationA statutory, supervisory or public agency
A forum for precompetitive research questionsA place to discuss prices, terms, customers or markets
Advisory on the research agendaAn approver of findings or a sponsor’s veto
Composed of appointed sector representativesA seat that membership or payment buys

Councils operate under the competition-law safeguards set out in GRA’s written competition policy, which applies to every GRA meeting, council, working group and exchange of information.

06Appointment

How seats are designed to be filled.

  1. 01

    Adopted terms

    Council terms are adopted first, setting out composition, term length, duties and conflict rules.

  2. 02

    Published criteria

    Selection criteria are objective and published, and applied equally.

  3. 03

    Appointment

    Members are appointed under those terms. No seat is automatic for any member or contributor.

  4. 04

    Kayıtlar

    Her toplantı için gündemler ve tutanaklar tutulur ve iş programının bir özeti yayımlanır.

07Not the same as

Separate from GRF councils and national programme councils.

GRA’s industry councils are separate from the councils of The Global Risks Forum (GRF) and of a National programme. There, the National Leadership Council (NLC) is leadership, the National Nexus Consortium (NNC) is institutional participation through constituency councils, and the National Working Groups (NWG) do expert work. GRF’s councils: council architecture. On this site: professional working groups and institutional members.

08Kaynaklar

Where this page’s references lead.

Bu sayfanın karşılaştırıldığı kuruluşlar ve belgeler. Durumlar ve sürümler değişir; her bağlantı yayımlayan kuruluşa gider.

09Sorular

Sorular ve yanıtlar.

Can I join an industry council now?
Henüz bir konsey oluşturulmamıştır. İlginizi İletişim formunaüzerinden kaydedebilirsiniz; onay yazısı bir referans verir ve sonraki adımı belirtir.
Do councils speak for the industry to regulators?
No. Councils set GRA’s research questions. They do not lobby, negotiate with authorities or speak for any member.
Can a public servant sit on a council?
Supervisors and other public servants are not members. They may take part in open GRA work only in their institutional role and under their own institution’s rules.
Which sectors will have councils?
Bu, kabul edildikten sonra konsey şartlarıyla belirlenir. Bir sektör konseyi, oluşturulana kadar duyurulmaz.
Global Risks Alliance

Bir maruziyet veya sermaye sorusunu İttifak'a getirin.

Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.