GRA · Private Equity Nexus
Spatial financeWhere capital meets hazard, exposure and transition
Physical risk to assets
Private-equity and real-asset portfolios hold factories, warehouses, data centres, care homes, farms and infrastructure in specific places, exposed to flood, heat, wind, wildfire and drought, and dependent on power, water and transport that can fail. This page sets out how physical climate risk reaches a privately held asset and its owner, how exposure is located and assessed when site data are thin, and what the evidence serves for the sponsors, boards, lenders and insurers who decide.
Physical risk to assets on the record.
Physical risk to assets: how the risk develops.
Climate and infrastructure disruptions. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Hazard meets location
Physical risk starts with where assets and suppliers are. Many portfolio companies do not hold a complete, geocoded list of their sites, so exposure analysis often begins by building that inventory.
Damage, downtime and dependency
A flood or heatwave damages property, stops production and cuts the utilities and transport an asset relies on. Business interruption can exceed physical damage, and much of it originates outside the site boundary.
Insurance gaps and repricing
As hazards intensify, premiums rise, deductibles widen and some cover is withdrawn. Uninsured losses fall to the company and its owner, and the cost of cover enters operating margins and exit diligence.
Value moves within the hold
Buyers increasingly diligence physical risk at exit. Exposure that was not priced at entry can reduce the exit value or the pool of buyers, even when no event occurs during the holding period.
Assets on the grid, and the portfolio they make.
Where a portfolio’s assets sit, and how much of its value is most exposed. Hypothetical assets, not an assessment.
What is measured, and how well.
Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.
| Nîşane | Yekîne | Rîtm | Source type | Nîşan |
|---|---|---|---|---|
| Operating sites geocoded | share of sites with verified coordinates | salane | Company asset register | HATIYE RAPORKIRIN |
| Assets in high flood hazard zones | count and replacement value, by hazard class | salane | Hazard maps intersected with the asset register | MODELKIRÎ |
| Extreme heat days at operating sites | days per year above a site threshold | salane | Reanalysis and climate projections | MODELKIRÎ |
| Business interruption tolerance | days of downtime before customer or covenant breach | salane | Continuity planning | TEXMÎNKIRÎ |
| Insured share of replacement value | percent, by peril | salane | Insurance schedules | HATIYE RAPORKIRIN |
| Weather-related losses | currency per event, insured and uninsured | per event | Claims and incident records | ÇAVDÊRÎKIRÎ |
| Portfolio companies reporting physical risk | share of companies in a fund | salane | Fund sustainability reporting under ISSB or SFDR | DECLARED |
Portfolio monitoring.
Ekrana ku tîmek dê ji bo şopandina vê mijarê bikar bîne: pîvan, rewş û biryarên wê. Nav mînak in û nirx nîşander in.
Portfolio monitoring
Physical risk to assets · Fund III · Quarter 2
Portfolio companies
| Company 7, logistics | 4.7 | 10 | Bilind | Lîsteya şopandinê |
| Company 3, healthcare | 3.7 | 32 | Kêm | Li gorî plansaziyê |
| Company 5, industrial | 4.8 | 12 | Navîn | Li gorî plansaziyê |
| Company 9, software | 2.2 | 20 | Kêm | Li gorî plansaziyê |
Maturity wall
Company 7 resilience
- Sites in flood zone
- 4 of 11
- Berhevbûna peydakaran
- one carrier for 60 pct of volume
- Çalakî
- relocate depot, second carrier
- Xwedî
- Operating partner
Where the evidence comes from.
Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.
| Çavkanî | What it gives | Licence class |
|---|---|---|
| ERA5 reanalysis (Copernicus Climate Change Service) | Hourly temperature, rainfall and wind, global, for hazard baselines | Free and open, attribution |
| WRI Aqueduct | Water stress, riverine and coastal flood hazard layers | Creative Commons Attribution |
| JRC global river flood hazard maps | Flood extent and depth by return period | Free and open, attribution |
| NGFS climate scenarios | Physical and transition pathways for scenario analysis | Free, attribution |
| IPCC Interactive Atlas | Projected changes in climate hazards by region and warming level | Free, attribution |
| Munich Re NatCatSERVICE and Swiss Re Institute sigma | Historical catastrophe loss records and insurance protection gaps | Public summaries; detailed data proprietary |
| Company asset registers and insurance schedules | Site locations, values and cover terms | Confidential to owners, lenders and insurers |
Transition and physical risk on a portfolio.
Three scenario families after the NGFS framework move a sector portfolio through carbon costs and warming damages; the transmission view follows the losses to lenders, investors, public finances and households. Scenario: named assumptions about the future, not a forecast. The map on this page shows The contiguous United States; the model itself is not tied to a place.
Kontrol
- Carbon price at the horizon, orderly path
- 200 per tCO2
- Delay before a disorderly transition
- 50% of horizon
- Cost passed to customers
- 50%
- Warming today above pre-industrial
- 1.30°C
- Warming per decade, current policies
- 0.25°C
- Damage coefficient
- 0.24% per °C²
- Salên pêş
- 25 sal
Xwendin
- Worst scenario at the horizon
- −33.6% of value
Jimar, rêbaz û çavkanî
| Sal | Orderly transition (% value) | Delayed, disorderly transition (% value) | Current policies (% value) |
|---|---|---|---|
| 0 | −0.38 | −0.38 | −0.38 |
| 3 | −2.87 | −0.53 | −0.67 |
| 6 | −5.36 | −0.68 | −0.97 |
| 9 | −7.84 | −0.84 | −1.27 |
| 12 | −10.33 | −0.99 | −1.57 |
| 15 | −12.82 | −7.12 | −1.87 |
| 18 | −15.31 | −15.05 | −2.17 |
| 21 | −17.80 | −23.00 | −2.48 |
| 24 | −20.29 | −30.94 | −2.79 |
Rêbaz
- Climate scenario families NGFS (2023), Climate Scenarios for central banks and supervisors, Phase IV
- Climate stress test of the financial system Battiston and others (2017), Nature Climate Change 7
- Damage function Nordhaus (2017), Revisiting the social cost of carbon, PNAS 114
- Transmission channels BCBS (2021), Climate-related risk drivers and their transmission channels
- Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
- One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley
Dane
The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:
- Urban extents Natural Earth
- Seaports Natural Earth
- Past year, daily temperature (ERA5 via Open-Meteo) Open-Meteo.com (CC BY 4.0), Copernicus ERA5 (C3S/ECMWF) · register open-meteo.public-pages
- Surface air temperature, daytime (AIRS) NASA AIRS · register nasa.gibs.context-live-layers
Li seranserê şeş stûnan, bi pêşengiya Nexus Consortium
- Experiments Labs
- Built in Private Equity Nexus in Foundry
- Tested at Private Equity Nexus in Universe
- Hatiye kodkirin di Darayî, sîgorta û aborî di Standards de
- Published in Private Equity Nexus in Reports
- Tê de tê dayîn Fakulteya Darayî û Aborî di Academy de
Who decides, and what the evidence serves.
Private Equity Nexus prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.
| Kî biryarê dide | Pirs | Evidence this page serves |
|---|---|---|
| General partner investment committees | Whether physical exposure is priced and manageable at entry, and what adaptation the plan must fund | Exposure by site and hazard; hazard-to-cash pathways; insurance availability |
| Portfolio-company boards | Which sites to protect, relocate or insure differently, and when | Site-level exposure, interruption tolerance and loss history |
| Insurers and brokers | On what terms to cover property and business interruption | Asset inventories, site hazard layers and loss records, with labels |
| Lenders and limited partners | Whether physical risk is reflected in credit terms and manager disclosure | Portfolio exposure summaries and disclosure coverage under ISSB and SFDR |
Outputs this topic produces
- Methods for building geocoded asset and supplier inventories from company records
- Hazard-to-cash pathways from damage and downtime to earnings, covenants and exit value
- Physical risk diligence questions for entry and exit
- Portfolio heat maps of exposure by hazard, labelled as modelled
Trace a shock in physical risk to assets to the balance sheet.
Assembled from the Nexus Standards area profile Financial and economic risk standards: the shocks it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Pick an initiating shock and step through the cascade to see which exposures it reaches and where losses could concentrate. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise, not a forecast, a valuation, a rating or investment advice. To model a place of your own choosing, open the full System Builder.
Metirsî
- Sea-level rise
- Têkçûna bendavê
- Coastal flood (set off downstream)
- Storm surge (set off downstream)
- High-tide flooding (set off downstream)
- Coastal erosion (set off downstream)
- Saltwater intrusion (set off downstream)
- Estuary flood (set off downstream)
- River flood (set off downstream)
- Flash flood (set off downstream)
- Koçberiya girseyî (li aliyê jêr çê dibe)
- Coastal habitat squeeze (set off downstream)
- Wetland loss (set off downstream)
- Mangrove loss (set off downstream)
- Groundwater flood (set off downstream)
- Qutbûna berfireh a elektrîkê (li aliyê jêr çê dibe)
- Kêmasiya dabînkirina avê (li jêra çem dest pê dike)
- Climate-driven migration and relocation (set off downstream)
Pergal û girêdan
Kontrol
NS-0Destûr û prensîbNS-3UNIyên tomara xetereyê (rêzimanî, nexşeya veguhastina ji pergala kevin, desthilata veqetandinê)NS-9UNI yên çarçoveyî (belavkirin, mînak, mînakên bernameyê)NS-10Polîtîka û xal (erkên ku makîne dikare bixwîne: pênase, girêdanî, nirxandin û sepandin)NS-11Piştrastkirin û çavdêrî (delîl, erêkirin, çavdêriya lihevhatina zero-trust)NS-14Lihevhatin û nexşeya li standardên derveyîNRS-H59Malbata metirsiyê: Şokên aborî û têkçûna rêveberiyê (NHS-1 soc.economic)NRS-H113Malbata metirsiyê: Nazikiya pergala darayî (NHS-1 soc.financial-system)NRS-H118Malbata metirsiyê: Sûcê rêxistinkirî û aboriyên neqanûnî (NHS-1 soc.crime)NRS-H114Malbata metirsiyê: Şokên makroaborî û darayiya giştî (NHS-1 soc.macro-fiscal)NRS-H61Malbata metirsiyê: Têkçûna zincîrî (NHS-1 sys.cascade)NRS-U27Universe platform profile: Sovereign Capital Nexus
Çavdêrî
- Xizmetên daneyan ên IMF (WEO, IFS, FSI bi riya SDMX) (ji bo referansê hatiye lîstekirin)
- BIS Data Portal (kredî, xizmeta deyn, bihayên milkan, statîstîkên bankayan) (ji bo referansê hatiye lîstekirin)
- World Bank Open Data and World Development Indicators API (listed for reference)
- OECD Data Explorer (SDMX API) (ji bo referansê hatiye lîstekirin)
- Panela makroaborî
- Debt service as a proportion of exports of goods and services
- Nîşaneyên Saxlemiya Darayî
Erdnîgariya mînakê
- Ewropaya Rojava: 152 şaneyên şeşgoşe
- Ronahiyên şevê îşev, qutbûn (VIIRS Day/Night Band), NASA GIBS
- Ava rûyê erdê di nav ewr re, 30 m (radara OPERA DSWx-S1), NASA GIBS
- Rêjeya barînê, nîv saeta dawî (IMERG), NASA GIBS
- Vegetation disturbance alerts, 30 m (OPERA DIST-ALERT), NASA GIBS
What physical risk analysis asks.
- Which assets are exposed to which hazards today, and how might that change over the holding period and beyond?
- How much of a company’s revenue depends on sites, suppliers or infrastructure in exposed locations?
- Is insurance available and affordable, and what does it leave uncovered?
- How does physical risk affect the value a future buyer will place on the asset?
What physical risk to assets means for exposure, loss and capital.
The exposure, loss, scenario and capital views a risk officer, supervisor or ministry of finance would ask for, with the frameworks they report against. Structures follow supervisory and actuarial practice. Values are illustrative: never prices, ratings or advice.
Transmission channels
How a shock in physical risk to assets reaches credit, market, underwriting, liquidity and operational risk, and feeds back.
How hazards become financial losses.
Direct damage to buildings and equipment is the most visible channel. Business interruption is often larger: a flooded plant or an extended power outage stops revenue while costs continue. Supply chain disruption extends the reach of a hazard to companies far from where it struck. Rising insurance premiums or withdrawal of cover raise costs and can leave assets uninsurable.
For private owners, a further channel is exit value. Buyers increasingly consider physical risk, so an asset whose exposure grows during the holding period may sell for less or be harder to sell. Lenders may also price physical risk into refinancing.
How physical risk is assessed.
- 01
Hazard and exposure mapping
Overlaying asset locations with hazard data. Limits: hazard data resolution varies, and future projections carry climate model uncertainty.
- 02
Vulnerability and damage functions
Estimating damage for given hazard intensities. Limits: generic functions may not fit specific assets.
- 03
Scenario analysis
Testing financial effects under hazard scenarios, using scenario design and stress testing. Limits: illustrative, not predictive.
- 04
Indirect exposure analysis
Mapping dependence on infrastructure and suppliers. Limits: data on dependencies is incomplete.
How it is studied, and what the methods cannot say.
- 01Scenario design and stress testingRate and refinancing stress · Physical event across a portfolioApplied here
- 02Financial and risk engineeringCapital structure and waterfall modelling · Fair value model reviewApplied here
- 03Financial economics and macro-financePerformance against public alternatives · Rate transmission to leveraged companiesApplied here
Pirs û bersiv.
Why start with the asset register?
Does insurance remove physical risk?
Are climate scenarios forecasts?
Does the platform assess physical risk for specific assets?
Is physical risk only a long-term issue?
Why does physical risk affect exit value?
Can insurance remove physical risk?
Ji vê rûpelê delîl bidin.
Reports weşana sê mehane ya Konsorsiyûmê ye. Tiştê ku tu li ser vê mijarê dizanî dikare di çapa pêş de bibe delîl, dosya an rastkirin, bi navê te û di bin CC BY 4.0 de weşandî li cihê ku karê te bi xwe be.
- EmailGateway GW-GRASend it from this pageEvidence, a correction, a case, a method, a review, a translation or profile input. It arrives tagged with this page, so the editor who owns it receives it.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsGlobal Risks AllianceSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
Tu carî daneyên şexsî, hûrgiliyên binesaza hesas an tiştekî ku mafê we yê parvekirinê tune ne neşînin. Beşdarî berî bikaranînê tê nirxandin; şandina wê nivîskarî an mafên edîtorî nade û sponsorî tu carî encamekê nakire.
Bring an exposure or capital question to the Alliance.
Agahî û pirs îro vekirî ne. Pirsek referansekê distîne û gava piştî wê dide nasîn; serlêdan, drav, veqetandina hesabkirinê û tomarkirin tenê dema ku tîm, mercên wê û kapasîteya vekolînê hebin vedibin.
Belgeyên hiqûqî.
Nexşe, dane û jimarên vê malperê ji bo çarçoveyê û agahiyên giştî têne nîşandan. Ew ne şîret, ne pêşbînî û ne hişyarî ne; sînorên agahiyê di Daxuyaniyên Berpirsiyariyê û Daxuyaniyên Daneyê de hatine diyarkirin.