- 報告書
- グローバル・リスク・アライアンス(Global Risks Alliance)
- シリーズ
Report series.
Seventeen series carry every Reports edition. Global Risks Alliance leads 2 and feeds 8 more; each has its own page here, and the others are kept at GCRI, the publisher of record.
- シリーズ
- 17
- Led here
- 2
- With a page here
- 10
- Editions drafted
- 86
01 · This desk
Global Risks Alliance and the series.
The Alliance reads an edition for capital readiness: whether insurers, banks, investors and public finance can read a finding without distorting it.
The Alliance deposits readiness editions of the series it leads, with the instruments and stress tests that support them.
If you price or allocate against these risks, send the case and say what you may disclose. The Alliance will cite the part you can share.
02 · Series
Every series, with this desk’s role and its editions.
Global Risks Alliance leads 2 series and feeds 8. Filter by role or search; each series opens on its own page.
- FeedsGlobal Systems Risk and ResilienceThe state of interdependent risk at world scale: water, energy, food, health and biodiversity, the couplings between them and the readiness that holds them.1 of 1 drafted
- 各号
- 次へ
- Evidence cut 31 Dec 2026
- FeedsCountry Systems Risk and ResilienceOne country or union at a time: the state of its interdependent systems, the risks that travel through them and the capabilities that hold them.26 of 26 drafted
- 各号
- 次へ
- Evidence cut 31 Dec 2026
- FeedsGlobal Sector Risk and ResilienceOne sector at world scale, such as water or energy: its state, its exposures and its couplings to the other systems.15 of 15 drafted
- 各号
- 次へ
- Evidence cut 31 Dec 2026
- FeedsStrategic SystemsCross-cutting systemic questions, such as entangled crises, cascades and feedbacks across climate, economy, health and security.14 of 14 drafted
- 各号
- 次へ
- Evidence cut 31 Dec 2026
- FeedsExponential TechnologyFast-moving technologies read as physical infrastructure: the compute, energy, water, materials and supply chains they depend on.20 of 20 drafted
- 各号
- 次へ
- Evidence cut 31 Dec 2026
- FeedsScenario and Stress-TestConditional scenarios and stress tests under stated assumptions; never predictions.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- FeedsMethods and TechnicalThe methods, models, evidence grammar and data standards the editions rely on, written so they can be checked and reused.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- 主導Portfolio and ReadinessReadiness of portfolios and project pipelines on a ladder of evidence; never a rating.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- 主導Finance and Insurance ReadinessHow findings can be read by insurers, banks, investors and public finance, without being advice, a rating or an underwriting decision.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- FeedsEvidence BriefShort, print-first briefs that carry one question, its evidence and its limits to a decision-maker.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- ReadsCountry QuarterlyQuarterly updates of a country edition: what changed against its baseline since the last evidence cut.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- ReadsRegional SystemsSystems risk read across a region, where shocks cross borders through shared rivers, grids, food trade and supply chains.10 of 10 drafted
- 各号
- 次へ
- Evidence cut 31 Dec 2026
- ReadsForesight OutlookPlausible futures and the signals that would tell them apart, written for those who govern and convene.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- ReadsLabs EvidenceResults from Labs experiments and pilots, reported with their design, limits and data.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- ReadsFoundry Build and ReadinessWhat Foundry builds for the editions: readiness of models, data pipelines and tools, stated as evidence, not as claims.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- ReadsObservatory SignalShort notices on new signals in the evidence that may change an edition before its next cut.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
- ReadsUniverse Annual SynthesisThe annual synthesis of the Universe programme: what its missions tested and what the editions should take from it.Opens from Q1 2027
- 各号
- Quarterly from the operational cycle
- 次へ
- Evidence cut 31 Dec 2026
No series matches.
Contribute to a series.
Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GRA Capital Readiness desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.
- メールゲートウェイ GW-GRAこのページから送信するエビデンス、訂正、事例、手法、レビュー、翻訳、プロファイルへの入力。このページのタグが付いて届くため、担当の編集者が受け取ります。
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- 報告書グローバル・リスク・アライアンス(Global Risks Alliance)お持ちの内容をどの窓口が受け付けるかを確認するルーティング表から貢献ページが開きます。お持ちの内容、それを受け付ける窓口、各貢献の審査とクレジットの方法、ライセンスが記されています。
個人データ、重要インフラの機微な詳細、共有する権利のないものは決して送らないでください。寄稿は利用前にレビューされます。送付によって著作者としての権利や編集上の権利が生じることはなく、スポンサーシップで調査結果を買うことは決してできません。
CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by the Global Centre for Risk and Innovation (GCRI Canada).
What you can do from this page.
- ReaderNew to the reports? A short guide to reading an edition.Start here
- ContributorSend evidence, data or a correction to this desk.Contribute
- ReviewerReview for this desk; verified reviews are credited.Become a reviewer
- Editor, steward or boardQueues, decisions and production are in the workspace.My workspace