Skip to content

GRA · 금융 및 보험 준비 상태

공간 금융자본이 재해, 노출, 전환과 만나는 곳

개발 준비도

Resilience programmes often reach development lenders without the evidence, safeguards or data their diligence needs. The Global Risks Alliance (GRA) has designed a preparation service for programme owners: diligence material, project safeguards and data needs, so a lender can start its own review. Never a loan, a grant decision, a pipeline listing or an introduction. Engagements open once team, terms and review capacity exist. Part of Finance and insurance readiness.

01작업 공간

The workspace for development readiness.

위험 등록부

Development readiness · Member portfolio · Quarter 2 · Example interface, not a record

Two risks above appetiteGRA · GRA

등록

해안 부동산 집중도보험높음초과최고 리스크 책임자
Liquidity under redemption stress유동성보통범위 내재무부
Model error, cat pricing모델링보통초과독립 검증
Third-party cloud outage운영보통범위 내운영

Heat map

리스크 등록부.예시용 인터페이스이며 실시간 데이터가 아닙니다.

GRA · 리스크 등록부. 리스크 등록부: 예시 이름과 예시 값이며, 실제 기록이 아닙니다.

02서비스

문제, 작업, 그리고 각 측이 기여하는 바.

요소설계된 대로
대상개발금융기관 및 프로그램 소유자
문제Resilience programmes reach lenders without the evidence, safeguards or data their diligence needs
업무Prepare institutional diligence material, project safeguards and data needs
받는 것:A preparation note and a description of the kinds of institution whose review the programme may need
기여하는 것:프로그램 설계와 책임 있는 담당자
결코 하지 않음A loan, a grant decision, a pipeline listing or an introduction to a lender
03공간 금융

프로젝트의 위치와 이를 보호하는 계층입니다.

개발 프로젝트가 재해 및 빈곤과 만나는 지점과 이를 보호하는 재원 계층을 보여 줍니다. 가상의 프로젝트와 설계 값입니다.

Development projects in Mozambique and Malawi against hazard and poverty, with the financing layer that would protect each.Hypothetical projects and design values; no country’s strategy is shown.
04검토자 표준

What development lenders will check.

표준소유자What a dossier must make reviewable
환경 및 사회적 지속가능성에 관한 성과 기준(2012)IFCRisk categorisation, labour, community health and safety, land acquisition, biodiversity and indigenous peoples
적도 원칙 EP4적도원칙협회Project finance environmental and social due diligence, including climate change risk assessment for high-emission and physically exposed projects
Joint MDB climate finance tracking and Paris alignment다자개발은행How adaptation and mitigation shares are counted and how alignment is assessed
세계은행 환경·사회 프레임워크세계은행Borrower obligations under the ten environmental and social standards
05Project siting against hazard

재해와 빈곤을 고려한 사업 입지 선정

개발 사업 자료철은 각 사업을 지도 위에 배치합니다: 사업 부지, 서비스 권역, 그리고 설계 수명 동안의 재해. 재해의 N년 빈도, 빈곤 추정치, 기존 인프라를 겹쳐 보면 어떤 사업이 가장 노출된 사람들을 보호하는지, 어떤 사업이 스스로 노출되어 있는지 드러납니다. 이후 금융 계층을 이 지리 정보와 대조해 읽습니다: 양허성 대출, 신용 보강, 우발 신용한도 또는 보험 계층이 어떤 리스크를 부담하게 되는지 살펴봅니다. GRA 그림의 값은 가상의 값입니다.

Evidence comes from GCRI Economic Development and the Global Centre for Risk and Innovation (GCRI) Disaster Resilience; sector work continues at Development Finance Nexus.

06What a lender’s diligence looks for

세 겹의 준비.

기관

책임 주체

Mandate, authority to borrow or receive funds, governance, procurement capacity and the owner of each obligation.

프로젝트

What it protects, and how

The hazard and dependency evidence, the resilience benefit claimed and its evidence label, and the safeguards in Rights and due diligence.

데이터

What is still missing

Asset registers, baseline conditions, monitoring arrangements and data permissions, listed openly for the reviewer.

07경계

Preparation, not origination.

  • GRA does not originate, arrange, negotiate or commit any loan or grant.
  • It keeps no pipeline of projects for lenders, and no listing implies a lender’s interest.
  • It describes the kinds of institution whose review a programme may need, without recommending or introducing any of them.
  • A dossier is released only at the programme owner’s written direction, to a party the owner chooses; see Lawful handoffs.
  • 어떠한 자금 조달 결과와도 연계된 수수료를 받지 않습니다.
08연결된 작업

Where development readiness continues.

Asset-level evidence for infrastructure is described on Infrastructure preparedness. The professional community for development finance is Development Finance Nexus. Economic development evidence comes from The Global Centre for Risk and Innovation (GCRI) through Economic Development.

09출처

Where this page’s references lead.

이 페이지를 읽을 때 기준이 되는 기구와 문서. 상태와 판은 바뀌며, 각 링크는 발행 기구로 연결됩니다.

10질문

질문과 답변.

Will a preparation note get our programme financed?
No. A preparation note states what evidence exists, what it shows within its limits and what remains unknown. Whether a programme is financed is decided only by the institution that reviews it.
Can GRA tell us which lender to approach?
No. GRA can describe the kinds of institution that usually review such programmes, without recommending or introducing any of them.
비용은 얼마입니까?
An enquiry and a scoping conversation are free. Any fee for later work is published with its issuer, currency, effective date and schedule before work is agreed. No fee is published today.
보고서기여하기

이 페이지에서 증거를 기여하십시오.

Reports는 컨소시엄의 분기별 간행물입니다. 이 주제에 관해 귀하가 아는 것은 다음 호에서 근거, 사례 또는 정정이 될 수 있으며, 귀하의 이름으로 표시되고, 귀하 자신의 저작인 경우 CC BY 4.0으로 발행됩니다.

글로벌 리스크 얼라이언스(Global Risks Alliance)
글로벌 리스크 얼라이언스(Global Risks Alliance)

익스포저나 자본에 관한 질문을 얼라이언스에 가져오십시오.

정보와 문의는 오늘부터 열려 있습니다. 문의에는 참조 번호가 부여되고 다음 단계가 안내됩니다. 신청, 결제, 컴퓨팅 할당, 등록은 해당 팀, 약관, 심사 역량이 갖추어졌을 때만 열립니다.