Skip to content

GRA · Research and intelligence

Spatial financeWhere capital meets hazard, exposure and transition

Model û rêbazên pîşeyî

Every estimate The Global Risks Alliance (GRA) publishes rests on a method, a set of assumptions and a review. Below: how GRA builds estimates and scenarios, states assumptions and uncertainty, and reviews methods before release. Each method is documented so a professional can examine, reproduce or challenge it. The canonical description sits in the STEM Commons stewarded by The Global Centre for Risk and Innovation (GCRI). Part of research and intelligence.

02Method families

Four families run through GRA research.

Dûvik

Actuarial and quantitative

Probability, actuarial mathematics and extreme value theory for rare, severe losses. Reference: actuarial mathematics.

Tor

Contagion

How losses travel through exposures, funding and shared providers. Reference: network science and contagion.

Futures

Scenario mathematics

Compound physical, operational and economic shocks compared across plausible futures. Reference: scenario design and stress testing.

Model

Xetera modelê

Validation and uncertainty for the models others rely on. Reference: uncertainty quantification and model validation.

03Erêkirin

Model validation, under the 2026 guidance.

GRA method records follow the validation logic regulators expect of the industry: conceptual soundness, ongoing monitoring and outcomes analysis. In the United States that logic is now set out in the April 2026 revised interagency guidance (SR 26-2), which superseded SR 11-7; in the UK in PRA SS1/23. GRA applies those principles to its own research methods; it does not validate any firm’s model.

Kontrol bikinHow it is done
Saxlemiya têgehîAssumptions and their sources are written down and reviewed by a second analyst
BenchmarkingResults are compared with an independent model or published estimate
HesasîKey parameters are varied to show which drive the result
Back-testing where possibleModelled losses are compared with reported losses for past events
04Pêvajo

Pêvajo çawa dimeşe.

Process explorer · Process

Models and professional methods: Risk management process

8 gav5 qonax

Pêvajo

Models and professional methods: Risk management process

ISO 31000:2018 sets out an iterative risk management process, from scope, context and criteria through assessment and treatment to monitoring, review and reporting.

  1. 01 Frame

    1. 01Scope, context and criteriaDataset · SupervisorThe frame for the process: the scope, the external and internal context, and the risk criteria. Later steps are read against this frame.
  2. 02 Risk assessment

    1. 04Risk identificationStep · SupervisorThe first part of risk assessment. Risk is usually expressed by risk sources, potential events, their consequences and likelihood.
    2. 05Risk analysisModel · SupervisorThe second part of risk assessment. It considers consequences and likelihood of the identified risks, with guidelines, not a formula.
    3. 06Risk evaluationStep · SupervisorThe last part of risk assessment. Results of the analysis are compared with the risk criteria to see where more action is needed.
  3. 03 Treatment

    1. 07Risk treatmentStep · SupervisorTreatment options are selected, then plans are prepared and implemented. Residual risk is documented and goes to monitoring and review.
  4. 04 Across the process

    1. 02Communication and consultationStep · SupervisorCommunication and consultation with stakeholders is its own process element. The standard draws it alongside the others, not in sequence.
    2. 03Monitoring and reviewStep · SupervisorMonitoring and review take place at every stage. New experience, knowledge and analysis can revise elements, actions and controls.
  5. 05 Record and report

    1. 08Recording and reportingRecord · SupervisorThe process and its outcomes are documented and reported. The standard does not name who receives the report in the clauses read.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval.

05Spatial methods

Hazard, exposure and vulnerability as separate records.

Spatial estimates keep the hazard layer, the exposure layer and the vulnerability function as separate versioned records, so each can be replaced without hiding the change. Method descriptions sit at GCRI uncertainty quantification and GCRI spatial statistics.

06Belgekirin

What every method record states.

  • The question the method answers and the decision context it is suited to
  • Data inputs, their sources, licences and evidence labels
  • Assumptions, including those that drive the result most
  • Uncertainty and sensitivities, reported as ranges rather than single figures
  • What was not tested, and the conditions under which the method should not be used
07Nirxandin

How a method and its results are checked.

  1. 01

    Independent reviewer

    A reviewer not responsible for the work checks the method, inputs and labels before release.

  2. 02

    Reproducibility

    Where rights allow, enough detail is published for a competent reader to reproduce the result.

  3. 03

    Dijwarî

    Anyone may challenge a method or result at the integrity concern form, without membership or payment.

  4. 04

    Rastkirin

    Errors lead to a recorded new version, listed on corrections and updates.

08Sînor

What a GRA estimate is not.

A GRA estimate or scenario is evidence for the reader’s own judgement. It is never a loss forecast, a rating, a supervisory test, a capital requirement or investment advice. No institution should substitute it for its own validated models. Related: financial data and rights, financial stability analysis and scenarios and stress testing.

09Çavkanî

Where this page’s references lead.

Sazî û belgeyên ku ev rûpel li hember wan tê xwendin. Rewş û çap diguherin; her girêdan diçe ba saziya derxistinê.

10Pirs

Pirs û bersiv.

Can I reuse a GRA method?
Method descriptions may be cited and reused under the terms on content and software rights. Licensed data used in a method is not redistributed.
Why does GRA report ranges instead of single numbers?
Because a single figure hides how much a result depends on assumptions. Ranges and sensitivities let readers see that dependence.
Are these methods standards?
No. They are documented research methods. GRA sets no binding standard, and no member is required to adopt any method GRA publishes.
How do methods relate to the STEM Commons?
Each method family has one canonical description in the STEM Commons stewarded by GCRI. GRA documents how a method is applied to financial questions.
rêzeya Pergalên StratejîkTevkarî bike

Ji vê rûpelê delîl bidin.

Reports weşana sê mehane ya Konsorsiyûmê ye. Tiştê ku tu li ser vê mijarê dizanî dikare di çapa pêş de bibe delîl, dosya an rastkirin, bi navê te û di bin CC BY 4.0 de weşandî li cihê ku karê te bi xwe be.

Global Risks Alliance
Global Risks Alliance

Bring an exposure or capital question to the Alliance.

Agahî û pirs îro vekirî ne. Pirsek referansekê distîne û gava piştî wê dide nasîn; serlêdan, drav, veqetandina hesabkirinê û tomarkirin tenê dema ku tîm, mercên wê û kapasîteya vekolînê hebin vedibin.