Skip to content

GRA · Regional programmes

Herêma Ewropa û Ewrasyayê

Europe and Eurasia run on interconnected power, gas, data and transport systems, linked to Asia through the Caucasus and Central Asian corridors. Regional work covers cascading infrastructure failure, the energy transition, heat and flood, and cross-border digital and financial dependencies. The Global Risks Alliance (GRA) reads the region for finance: energy and real-estate exposure, technology concentration in market infrastructure, protection gaps. Forming. Part of Regional programmes.

01Rêzik

Rêza ku tişt tê de diqewimin.

  1. 01PirsPêşengiya neteweyî, herêmî an sazûmanî
  2. 02DelîlBingeha STEM a platformê
  3. 03BuildFoundry
  4. 04Organîze bikeEkosîstema Nexus
  5. 05CeribandinUniverse (malpera serbixwe)
  6. 06Biweşînerêzeya Pergalên Stratejîk
  7. 07Biryar bideDesthilat û sazîyên jêhatî, bi riya NXS-RLS (beşdar, lihevkirin û radestkirin)
  8. 08Nû bikeRastkirin û ajandaya salane ya pêş
02Coverage and state

What exists in this region today.

HêmanRewşa niha
Programme stateFormkirin
Regional hostNone on record; the region is in formation
Named programmeThe Eurasia programme of the Nexus Consortiums sits within this region. Its public programme page is published by GRA; formation records and participating structures are confirmed by the Secretariat before they are listed
Navendên plankirîUnited Kingdom, France, Switzerland, Türkiye: planned coordination roles, not offices
Regional deskthe contact form (Europe and Eurasia desk), a desk of the Consortium Secretariat
GRA service levelAgahî û pirsîn

Countries in the region are research coverage. A country or hub named on this page is not a GRA office, member or partner, and a planned hub is not an operating site.

03Spatial finance

Exposure, hazard and the exceedance curve.

Which places drive loss in a severe year, and how far it reaches into reinsurance. Illustrative design values.

Coastal exposure under cyclone and earthquake zones, beside the loss curve it produces.Illustrative design values, not a model output or a price.
04Risk-finance architecture

Instruments already on the public record.

Instrument or bodyWhat it does in the region
Solvency II, as amendedInsurer capital and ORSA with climate scenario analysis; review amendments apply from 30 January 2027
CRR3 and the EU banking packageBasel III final reforms applied from 1 January 2025; FRTB market risk rules deferred
EIOPA protection gap dashboard and EIOPA-ECB proposalsMeasurement of natural catastrophe protection gaps and proposals for public-private reinsurance and an EU disaster financing scheme
DORADigital operational resilience across EU financial entities since January 2025
CSRD after Omnibus IReporting thresholds raised in 2026; scope much narrower than first legislated
05Pêvajo

Pêvajo çawa dimeşe.

Process explorer · Process

Europe and Eurasia region: Disaster risk finance layers

9 steps4 stages

Pêvajo

Europe and Eurasia region: Disaster risk finance layers

A World Bank working paper layers risk: reserves finance small losses, and contingent credit and reinsurance add capacity for moderate and catastrophic losses.

  1. 01 Risk

    1. 01Risk profileDataset · SupervisorThe layers start from the expected losses a government faces, by size of loss.
  2. 02 Tebeqe

    1. 02Bottom layer: reservesStep · SupervisorSmall losses are retained and financed from savings and reserves.
    2. 03Middle layer: contingent creditStep · SupervisorContingent credit works best to support risk retention for middle layers. Funds are available only in the event of a disaster.
    3. 04Top layer: insurance and risk transferStep · SupervisorSevere losses are transferred through insurance, reinsurance or insurance-linked securities. Cat bonds suit extreme, low-frequency risks.
  3. 03 Readiness

    1. 05Financing agreed before the eventComponent · SupervisorThe financing strategy sets in advance which layer responds to which loss. Contingent credit and reinsurance are contracted before an event.
    2. 06TriggerDecision · SupervisorA hard trigger is an objective measure such as event magnitude. A soft trigger is a declaration, such as a government state of emergency.
  4. 04 Funds and review

    1. 07DisbursementStep · SupervisorFunds are released once the trigger is met. Parametric insurance can pay within two weeks, with no claims adjustment.
    2. 08Use of the fundsStep · SupervisorParametric payouts suit immediate relief and early recovery. Delivery channels are not described in the sources read.
    3. 09ReviewStep · SupervisorAfter an event the speed of funds and the match between payout and loss are reviewed, and the layers redesigned.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval. No return periods are fixed by the sources read.

06Spatial reading

How GRA reads the region’s exposure.

Flood and windstorm dominate insured catastrophe loss in Europe, and heat increasingly affects infrastructure and health. GRA reads river and coastal flood layers against mortgage and insured property concentrations, and links protection gap estimates to their mapped causes. Governance of disclosure and adaptation is discussed at GRF adaptation institutions.

07Pergalên hevpar

Cross-border systems, read for their financial meaning.

Shared systemResearch questionFinancial reading
Interconnected power and gas networksWhich interconnectors, storage levels and weather regimes create cross-border cascading risk during the energy transition?Utility credit; transition exposure; energy subsidies
Danube, Rhine and Central Asian basinsHow do drought, navigation, cooling-water needs and irrigation interact across shared rivers?Trade and industrial interruption; agricultural credit
Continental and Middle Corridor logisticsWhere do rail, road, port and pipeline routes concentrate exposure between Europe and Asia?Trade finance; cargo insurance; sector concentration
Heat, wildfire and floodWhich health, infrastructure and agricultural systems fail together under compound heat and flood events?Property claims; protection gaps; mortgage collateral
Data centres and digital interdependenceHow concentrated are cloud, data-centre power and subsea connectivity, and what does continuity require?Third-party concentration in financial-market infrastructure

The research questions come from the regional programme registry and are examined with evidence from The Global Centre for Risk and Innovation (GCRI). GRA’s contribution is the third column.

08Financial questions

What the region’s financial centres are designed to examine.

  • Climate-related financial questions for interconnected energy and real-estate exposure.
  • Operational and technology concentration in financial-market infrastructure.
  • Insurance protection gaps for heat, flood and wildfire.
  • Readiness work on these questions follows the translation method; none is a finding until evidence is assembled and reviewed.
09Navendên plankirî

Coordination roles and their programme focus.

  1. 01

    Qraliyeta Yekbûyî

    Four-nation context, coastal and North Sea systems, infrastructure continuity and finance readiness.

  2. 02

    Fransa

    Çarçoveyên metropolîtan û derveyî, pergalên Deryaya Navîn, tor û hevgirtina Ewropî.

  3. 03

    Swîsre

    Pergalên Alpî, hewzên avê, rêbaz, standard, navrûyên sazîgerî yên navneteweyî û amadebûna fînansî.

  4. 04

    Tirkiye

    Berxwedana li hember erdhejê, bajar, amadebûna ji nû ve avakirinê û koridorên stratejîk.

Hub focus is taken from the consortium geography. Regional dialogue is convened by The Global Risks Forum (GRF); see GRF Europe and Eurasia region. Shared-system evidence is on GCRI Europe and Eurasia region. Other regions: Africa and North America.

11Pirs

Pirs û bersiv.

Does GRA have an office in Europe and Eurasia?
No. GRA has no regional offices. The hubs listed are planned coordination roles in the consortium geography, and none is an operating site until its host decision is on record.
Are the financial questions findings?
No. They are the questions the regional programme is designed to examine. Findings appear only after evidence is assembled, labelled and reviewed.
Who do I contact about this region?
Regional programme enquiries go to the Consortium Secretariat’s regional desk at the contact form (Europe and Eurasia desk), or to the contact form. Finance-readiness questions can go to the readiness assessment form. The acknowledgement gives a reference and names the next step.
What is the Eurasia programme of the Nexus Consortiums?
A named programme within this region, in formation. Its participating structures are listed only once the Secretariat confirms their formation records.
Global Risks Alliance

Bring an exposure or capital question to the Alliance.

Agahî û pirs îro vekirî ne. Pirsek referansekê distîne û gava piştî wê dide nasîn; serlêdan, drav, veqetandina hesabkirinê û tomarkirin tenê dema ku tîm, mercên wê û kapasîteya vekolînê hebin vedibin.