Skip to content

GRA · Insurance Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Published scenarios

Insurance supervisors now ask for scenarios that move both sides of the balance sheet. This page sets out the scenario families used in insurance, from realistic disaster scenarios and ORSA climate cases to reverse stress tests, with the design choices that decide whether a result is meaningful. Every scenario value shown is a design value for teaching, never a forecast or a capital figure.

01کارگاہ

The workspace for published scenarios.

پائپ لائن

Published scenarios · Workspace WS-62 · Example interface, not a record

One stage waitingGRA · Insurance Nexus

Stages

  1. Ingest5 sources
  2. Validateschema · licence
  3. Transformversioned
  4. ModelActuarial
  5. Testheld-out
  6. Releasewith limits

Artefacts

Policy administration extractv5.8کھلارپورٹ شدہ
Claims datav4.2To checkمشاہدہ شدہ
Cat model outputv5.9کھلاماڈل شدہ
Market statisticsv4.7کھلاPublished statistics

Compute quota

share used vs alert level

CPU hours70 used of 80 used limitStorage77 used of 90 used limitGPU hours54 used of 70 used limit
Pipeline.Illustrative interface; not live data.

Insurance Nexus · Pipeline. Pipeline: example names and illustrative values, not a record.

02حیثیت

Releases appear as they are reviewed.

Analysis runs in Foundry; reviewed releases are listed here.

03Scenario types

The insurance scenarios supervisors ask for.

منظرنامہTypical designWhere it is required or described
Realistic disaster scenariosNamed-peril events placed on a defined footprint against the portfolioLloyd’s market practice and many supervisors’ catastrophe returns
ORSA climate scenariosAt least two long-term climate scenarios for material climate riskEIOPA guidance; the 2025 Solvency II review brings climate scenarios into the ORSA framework
Climate stress testsPhysical and transition shocks to assets and liabilities togetherSupervisory exercises, using NGFS scenario variables
Reverse stress testsStart from capital breach and identify the events that cause itORSA practice under ICP 16
04عمل

عمل کیسے چلتا ہے۔

Process explorer · Process

Published scenarios: Asset-liability management

8 مراحل4 مراحل

عمل

Published scenarios: Asset-liability management

EU rules list asset-liability management in pension and insurer risk systems, and a Bank of England paper shows LDI hedging, collateral calls and stress.

  1. 01 Liabilities

    1. 01Liabilities and funding needsDataset · SupervisorThe own-risk assessment covers the pension fund’s overall funding needs. It runs at least every three years and after major risk changes.
  2. 02 Strategy

    1. 02Strategic asset allocationModel · SupervisorThe risk-management system covers asset-liability management and investment, notably derivatives, securitisations and similar commitments.
    2. 03Risk limitsDecision · SupervisorThe solvency assessment takes account of approved risk tolerance limits. The governing body sets the limits.
    3. 04Hedging liabilitiesStep · SupervisorPension funds can hedge liabilities with leveraged LDI funds and mandates. A Bank of England paper studies duration, leverage and holdings.
  3. 03 Resilience

    1. 05Liquidity and collateralDataset · SupervisorRising yields forced LDI funds to post collateral or meet margin calls. The risk-management system covers liquidity and concentration risk.
    2. 06StressModel · SupervisorLDI funds should be able to withstand severe but plausible stresses in the gilt market, to prevent forced deleveraging and gilt sales.
  4. 04 Governing body

    1. 07Rebalancing within rangesDecision · SupervisorThe governing body decides on rebalancing within ranges it has set. The sources read do not describe a rebalancing procedure.
    2. 08ESG risks and stewardshipStep · SupervisorESG risks of the portfolio and its management are part of the risk-management system. The sources read do not describe engagement or voting.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval. Banks’ ALM is not covered. The Bank of England paper covers leveraged liability-driven investment.

05Design note

The double hit is the scenario that matters.

Insurance scenarios that move only liabilities understate stress. A severe event can raise claims and depress the value of the insurer’s investments in the same quarter, especially when its assets include real estate, mortgages or bonds from the affected region. Sector scenarios on this platform state both sides and their assumed dependence. Illustrative values only; methods at GCRI scenario and stress testing.

06ماخذات

Where this page’s references lead.

وہ ادارے اور دستاویزات جن کے تناظر میں یہ صفحہ پڑھا جاتا ہے۔ حیثیت اور ایڈیشن بدلتے رہتے ہیں؛ ہر لنک جاری کرنے والے ادارے تک جاتا ہے۔

07سوالات

سوالات و جوابات۔

Can I request a map or model?
Write to the contact form with what you need and why.
رپورٹیںحصہ ڈالیں

اس صفحے سے شواہد فراہم کریں۔

Reports کنسورشیم کی سہ ماہی اشاعت ہے۔ اس موضوع کے بارے میں آپ کا علم اگلے شمارے میں شواہد، کیس یا تصحیح بن سکتا ہے، جو آپ کے نام سے منسوب ہوگا اور اگر یہ آپ کا اپنا کام ہو تو CC BY 4.0 کے تحت شائع ہوگا۔

Global Risks AllianceInsurance NexusFinance and Insurance ReadinessGlobal Sector Risk and Resilience

کبھی بھی ذاتی ڈیٹا، حساس بنیادی ڈھانچے کی تفصیل یا کوئی ایسی چیز نہ بھیجیں جسے شیئر کرنے کا آپ کو حق نہ ہو۔ ہر شراکت استعمال سے پہلے جانچی جاتی ہے؛ اسے بھیجنے سے کوئی تصنیفی یا ادارتی حق حاصل نہیں ہوتا، اور سرپرستی کبھی کوئی نتیجہ نہیں خریدتی۔

بیمہ Nexus

Bring an exposure or capital question to the Alliance.

معلومات اور استفسارات آج کھلے ہیں۔ استفسار کو ایک حوالہ نمبر ملتا ہے اور اگلے مرحلے کی نشاندہی ہوتی ہے؛ درخواستیں، ادائیگیاں، کمپیوٹنگ کی تخصیص اور رجسٹریشن صرف اس وقت کھلتی ہیں جب ان کی ٹیم، شرائط اور جائزے کی استعداد موجود ہو۔