Skip to content

GRA · Insurance Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Resilience and finance readiness

Insurance readiness asks whether a risk can be assessed, pooled and paid for before anyone discusses cover. Insurance Nexus prepares the exposure, hazard and loss evidence a carrier or a public pool would need to run its own model, and frames the questions it would ask. The Global Risks Alliance (GRA) never quotes, prices or places insurance, and a readiness file is never a statement that a risk is insurable.

01Workspace

The workspace for resilience and finance readiness.

Workstream tracker

Resilience and finance · Programme year 3 · Example interface, not a record

Two milestones at riskGRA · Insurance Nexus

Workstreams

owner · stage · status

Claims surge planReinsurance buyerScopingM2 · week 6On track
Pricing model validationSupervisorScopingM4 · week 10Blocked
Protection gap studyAppointed actuaryScopingM7 · week 35On track
Climate scenario analysisClaims directorMapitioM8 · week 16On track
Takaful governance reviewSupervisorScopingM6 · week 33Blocked

Effort against plan

person-weeks

Claims surge plan33 pw of 39 pw requiredPricing model15 pw of 20 pw requiredProtection gap study21 pw of 37 pw requiredClimate scenario11 pw of 24 pw required

Milestones

  1. W6M1Claims surge plan: scoping note signed
  2. W17M2Inputs qualified at the gate
  3. W21M3Pricing model validation: build review
  4. W32M4Controlled test with observers
  5. W37M5Publication and decision record
Workstream tracker.Illustrative interface; not live data.

Insurance Nexus · Workstream tracker. Workstream tracker: example names and illustrative values, not a record.

02Utayari

Readiness is not approval.

A readiness file describes a programme’s evidence, risks and governance so that an institution can carry out its own review. GRA does not approve, rate, underwrite, lend or invest, and it recommends no counterparty.

03Insurability

Four tests an underwriter applies before cover exists.

These are the classic insurability criteria from the actuarial literature. A file never states a premium or a rate.

JaribioSwaliEvidence a readiness file can carry
AssessabilityCan frequency and severity be estimated with stated uncertainty?Hazard layers with return periods, exposure schedule, loss history
Randomness and independenceAre losses sufficiently independent, or does one event hit the whole pool?Accumulation maps showing how much exposure one footprint covers
AffordabilityWould a technically sound premium be payable by the policyholders concerned?Income and settlement data beside modelled average annual loss, as context only
Moral hazard and adverse selectionDoes cover change behaviour or attract only the worst risks?Risk reduction measures, building codes and enforcement records
04Mchakato

How the process runs.

Process explorer · Process

Resilience and finance readiness: Policy question to decision

9 steps5 stages1 gate

Mchakato

Resilience and finance readiness: Policy question to decision

A priority becomes a question, evidence, a decision case and a limited publication; the competent authority decides, never the programme.

  1. 01 Question

    1. 01A priority becomes a questionStep · Universe; national counterpartsA priority becomes a researchable question with stated criteria. National counterparts own the agenda, data and decisions.
    2. 03Scientific and stakeholder challengeStep · the Global Centre for Risk and Innovation (GCRI); the Global Risks Forum (GRF)Scientific and affected-stakeholder challenge informs mission selection and methods.
  2. 02 Evidence and options

    1. 04Assemble the evidenceStep · GCRIMethods, labelled data and uncertainty are assembled. Every finding carries one of nine evidence labels.
    2. 06Decision case with optionsRecord · The decision owner named in the caseA decision case binds owner, alternatives, evidence and deadline. It needs sensitivity and robustness.
  3. 03 Review and publication

    1. 07G6 · Publication authorisedGate · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    2. 08Publish with method, uncertainty and limitsRecord · ReportsFindings are published with their method, uncertainty and limits. An edition is published after review, not to a calendar.
  4. 04 Outside the programme

    1. 02Competent authority decidesDecision · The competent authorityThe authority or institution decides under its own rules. The authority decides; the programme informs.
    2. 05Action and implementation stay with the ownersActor · The relevant government, operator or licensed institutionDecisions and execution stay with the relevant government, operator or licensed institution. The programme records one only if shared.
  5. 05 Learning

    1. 09Corrections and lessons feed the next agendaStep · UniverseCorrections and lessons feed the next annual agenda. The findings of one year set the mandate of the next.

The Nexus cycle · Decision rights · The programme yearDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

05Capital view

What a carrier’s supervisor will see.

An insurer that writes a new programme adds to its own capital requirement: under Solvency II at the 1-in-200 annual loss, under the Insurance Capital Standard for internationally active groups, or under a local regime. It also reports the programme under IFRS 17. A readiness file therefore prepares the exposure evidence a carrier needs to run its own model, and leaves pricing, capacity and terms to the carrier. Hazard evidence comes from GCRI flood and storm; market structure context from the market structure topic.

06Release

Who sees a readiness file.

A file is released only at the programme owner’s written direction, to a party the owner chooses, with no fee tied to any transaction.

07Vyanzo

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

08Pages

Pages in Resilience and finance readiness.

09Maswali

Questions and answers.

Does a readiness file mean finance is available?
No. It supports an independent review by the competent institution, which decides under its own rules.
Insurance Nexus

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.