Skip to content

GRA · Institutional Funds Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Analytical and data resources

Institutional Funds Nexus tools join long-horizon exposure to liability thinking. Spatial finance places the infrastructure, real estate and company assets funds hold against hazard pathways to the end of the century; asset-liability sketches show how a scenario moves both sides at once. Tools state sources, assumptions and uncertainty, and values before release are design values.

01Workspace

The workspace for analytical and data resources.

Build workspace

Institutional funds · Analytical and data · Run R-4620 · Example interface, not a record

Run in progressGRA · Institutional Funds Nexus

Runs

same inputs, versioned

R-4690Actuarial mathematicsv4.10.65Running
R-8511Financial economicsv8.70.59Failed test
R-5957Scenario designv3.20.87Failed test
R-2827Decision analysisv5.00.64Passed

Model card

Method
Actuarial mathematics
Inputs
Liability cash flows, Holdings
Validation
held-out period, skill reported
Label
MODELLED

Run log

  1. 00:00:42InfoIngest liability cash flows
  2. 00:02:12InfoSchema and licence checks passed
  3. 00:05:40WarnGap filled by interpolation, flagged
  4. 00:14:03DoneCalibration complete
  5. 00:23:55GateIndependent test queued
Build workspace.Illustrative interface; not live data.

Institutional Funds Nexus · Build workspace. Build workspace: example names and illustrative values, not a record.

02Tools

What is published here.

Maps

Released maps

Open the released maps

Models

Reviewed models and scenarios

Open the reviewed models

Scenarios

Sector scenarios

Open the sector scenarios

03Tool set

Maps, models and scenarios, with limits.

ToolWhat it showsLimit
Long-horizon exposure mapAsset types held by funds against hazard projections by periodProjections diverge widely after mid-century
Asset-liability sketchHow a scenario moves asset values, discount rates and funding togetherStylised fund with synthetic values
Collateral stress viewHow a rate rise drives collateral calls on a hedging structureIllustrative leverage and buffers
Liquidity ladderCash needs against liquid assets over weeks and monthsSynthetic example
04Process

How the process runs.

Process explorer · Process

Analytical and data resources: Layers to published map

7 steps4 stages1 gate

Process

Analytical and data resources: Layers to published map

Layers enter with their rights, are aligned, analysed and checked for uncertainty, then released after public-safe review; a map is a governed spatial claim.

  1. 01 Data

    1. 01Source layers with their rightsDataset · NXS-GRX (canonical data, provenance and risk)Spatial views of The Global Risks Index (NXS-GRX) products sit under the boundary licence gate. Rights classification sets how a layer may be used.
  2. 02 Harmonise

    1. 02Coordinate reference and boundary versionRecord · NXS-EOP (earth observation and digital twins)The area of interest preserves its coordinate reference system, polygon validity and observation support. Boundary versions are kept.
    2. 03Harmonise units, variables and timeStepUnit metadata, conversion records and transformation logs are required. Alignment is an evidence event, not hidden preprocessing.
  3. 03 Analyse and check

    1. 04Analyse with a recorded processing recipeModel · GIS teamA processing recipe records parameters, calibration, inputs and output lineage. The analysis methods are named in each product’s own record.
    2. 05Spatial uncertainty checkGateSpatial uncertainty is recorded and affects downstream use. A high-uncertainty polygon may suit internal review, not public-safe release.
  4. 04 Publish

    1. 06Spatial metadata bundleRecordThe bundle records boundary type, jurisdiction, geometry version, projection, resolution, source, time window, uncertainty and access class.
    2. 07Public-safe release of the mapDecisionThe output record names the redactions, uncertainty and public-safe reviewer. A map is a governed spatial claim, never merely a picture.

Spatio-temporal intelligence · Data protocols: semantic, jurisdictional and temporal intelligence · NXS-EOPDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The pages cited are design doctrine.

05Scenarios

Where designs are set out.

Scenario families are at published scenarios. Climate projections: GCRI Climate Hazards.

06Build environment

Working with the tools.

Analysis runs in Foundry for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

08Pages

Pages in Analytical and data resources.

09Questions

Questions and answers.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
ReportsContribute

Contribute evidence from this page.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks AllianceInstitutional Funds NexusFinance and Insurance ReadinessScenario and Stress-Test
Institutional Funds Nexus

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.