GRA · Disaster Risk Finance
Spatial financeWhere capital meets hazard, exposure and transition
Public investment and resilience
The cheapest disaster to finance is the one that causes less damage. Public investment in resilient infrastructure, building codes, land-use planning and early warning reduces the losses that later need financing. Getting there requires appraisal methods that count avoided losses and budgets that fund maintenance. This page sets out how resilience enters public investment, how it is measured, and who decides.
Public investment and resilience on the record.
Public investment and resilience: how the risk develops.
Risk-sensitive budget and capital projects. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Appraisal misses avoided losses
Standard cost-benefit appraisal often ignores disaster risk or counts only direct damage. Including avoided losses, disruption and co-benefits changes which projects rank highest.
Maintenance is underfunded
New assets are funded; upkeep is not. Poorly maintained drains, embankments and roads fail in events they were designed to withstand.
Location decides exposure
Building in floodplains or on unstable slopes locks in risk for decades. Land-use rules and siting decisions shape future losses more than engineering alone.
Benefits are invisible
Avoided losses do not appear in any account. Budget processes reward visible projects over prevention whose success is a disaster that did not happen.
Where projects sit, and which layer protects them.
Where development projects meet hazard and poverty, and which financing layer protects them. Hypothetical projects and design values.
What is measured, and how well.
Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.
| Indicator | Unit | Cadence | Source type | لیبل |
|---|---|---|---|---|
| Public investment projects screened for disaster risk | share of approved projects | annual | Public investment management records | DECLARED |
| Maintenance spending on public infrastructure | currency and share of asset value | annual | Budget execution | Published statistics |
| Infrastructure assets in high-hazard zones | count or value | periodic | Asset registers and hazard maps | ماڈل شدہ |
| Benefit-cost ratio of risk reduction investments | ratio | per appraisal | Project appraisals | ماڈل شدہ |
| Building code adoption and enforcement | categorical | on change | National building regulations | Published statistics |
| Public investment management assessment scores | score by institution | on assessment | IMF PIMA reports | Published statistics |
Parametric trigger monitor.
وہ اسکرین جو ایک ٹیم اس موضوع کی پیروی کے لیے استعمال کرے گی: اس کے پیمانے، حالتیں اور فیصلے۔ نام مثالیں ہیں اور اقدار توضیحی ہیں۔
Parametric trigger monitor
Public investment and resilience · Sovereign C · Season 2
Index vs trigger
Payment structure
| Attachment | 63 | 0 | بند کریں |
| Mid | 76 | 55 | Not met |
| Exhaustion | 92 | 100 | Not met |
Risk layers
local m, pre-arranged
Payment to people
- Triggeragent confirms
- Payment11 days
- Treasurytransfer
- Social protectionscale-up
- Householdscash
Where the evidence comes from.
Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.
| ماخذ | What it gives | Licence class |
|---|---|---|
| IMF Public Investment Management Assessments | Quality of public investment institutions including climate | Free, IMF terms |
| World Bank Lifelines report and resilient infrastructure work | Analysis of infrastructure disruption and resilience benefits | Free, World Bank terms |
| Coalition for Disaster Resilient Infrastructure reports | Infrastructure resilience practice and data | Free to read, terms to check |
| National Institute of Building Sciences mitigation saves studies | Benefit-cost analysis of hazard mitigation in the United States | Free to read, terms to check |
| OECD infrastructure resilience guidance | Policy guidance on resilient infrastructure | Free, OECD terms |
Transition and physical risk on a portfolio.
Three scenario families after the NGFS framework move a sector portfolio through carbon costs and warming damages; the transmission view follows the losses to lenders, investors, public finances and households. Scenario: named assumptions about the future, not a forecast. The map on this page shows Pacific Island states; the model itself is not tied to a place.
کنٹرولز
- Carbon price at the horizon, orderly path
- 200 per tCO2
- Delay before a disorderly transition
- 50% of horizon
- Cost passed to customers
- 50%
- Warming today above pre-industrial
- 1.30°C
- Warming per decade, current policies
- 0.25°C
- Damage coefficient
- 0.24% per °C²
- Years ahead
- 25 years
ریڈنگز
- Worst scenario at the horizon
- −33.6% of value
اعداد، طریقے اور ماخذات
| سال | Orderly transition (% value) | Delayed, disorderly transition (% value) | Current policies (% value) |
|---|---|---|---|
| 0 | −0.38 | −0.38 | −0.38 |
| 3 | −2.87 | −0.53 | −0.67 |
| 6 | −5.36 | −0.68 | −0.97 |
| 9 | −7.84 | −0.84 | −1.27 |
| 12 | −10.33 | −0.99 | −1.57 |
| 15 | −12.82 | −7.12 | −1.87 |
| 18 | −15.31 | −15.05 | −2.17 |
| 21 | −17.80 | −23.00 | −2.48 |
| 24 | −20.29 | −30.94 | −2.79 |
طریقے
- Climate scenario families NGFS (2023), Climate Scenarios for central banks and supervisors, Phase IV
- Climate stress test of the financial system Battiston and others (2017), Nature Climate Change 7
- Damage function Nordhaus (2017), Revisiting the social cost of carbon, PNAS 114
- Transmission channels BCBS (2021), Climate-related risk drivers and their transmission channels
- غیر یقینی کا پنکھا (پیرامیٹر Monte Carlo) Spiegelhalter، Pearson and Short (2011)، Visualising uncertainty about the future، Science 333
- ایک وقت میں ایک کی حساسیت (ٹورنیڈو) Saltelli and others (2008)، Global Sensitivity Analysis: The Primer، Wiley
ڈیٹا
ماڈل کنٹرولز سے طے شدہ تدریسی اقدار پر چلتا ہے۔ کسی مقام کے لیے اس کی پیمانہ بندی کرنے کے لیے اسے ان منظور شدہ پرتوں اور سلسلوں کے تناظر میں پڑھیں، جنہیں اس صفحے کا نقشہ دکھا سکتا ہے:
- Urban extents Natural Earth
- Seaports Natural Earth
- Past year, daily temperature (ERA5 via Open-Meteo) Open-Meteo.com (CC BY 4.0), Copernicus ERA5 (C3S/ECMWF) · register open-meteo.public-pages
- Surface air temperature, daytime (AIRS) NASA AIRS · register nasa.gibs.context-live-layers
چھ ستونوں میں، Nexus Consortium کی قیادت میں
- تجربات تجربہ گاہیں
- Built in Disaster Risk Finance in Foundry
- Tested at Disaster Risk Finance in Universe
- میں مدون معیارات میں خطرات اور آفات کے خطرے میں کمی
- Published in Disaster Risk Finance in Reports
- میں پڑھایا جاتا ہے اکیڈمی میں خطرات، آفات اور لچک کی فیکلٹی
Who decides, and what the evidence serves.
Disaster Risk Finance prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.
| کون فیصلہ کرتا ہے | The question | Evidence this page serves |
|---|---|---|
| Planning and finance ministries | How appraisal rules treat disaster risk | Appraisal methods and comparable practice |
| Infrastructure agencies | Which assets to strengthen, maintain or relocate | Asset exposure and condition data |
| Local land-use authorities | Where development may proceed | Hazard maps and loss evidence |
| Development banks | Which resilience investments to finance | Benefit-cost evidence and country priorities |
Outputs this topic produces
- Guide to including disaster risk in project appraisal
- Method note on avoided-loss benefit-cost analysis
- Comparative notes on maintenance budgeting
- Questions for planning ministries on siting
Trace a shock in public investment and resilience to the balance sheet.
Assembled from the Nexus Standards area profile Disaster and climate risk finance: the shocks it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Pick an initiating shock and step through the cascade to see which exposures it reaches and where losses could concentrate. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise, not a forecast, a valuation, a rating or investment advice. To model a place of your own choosing, open the full System Builder.
خطرات
- Tropical cyclone
- زلزلہ
- Ice-jam flood
- Storm surge (set off downstream)
- Intense rainfall (set off downstream)
- River flood (set off downstream)
- Flash flood (set off downstream)
- Dangerous surf (set off downstream)
- بجلی کی وسیع بندش (آگے کے شعبوں میں اثر)
- بڑے پیمانے پر نقل مکانی (آگے کے شعبوں میں اثر)
- Coastal flood (set off downstream)
- Aftershock sequence (set off downstream)
- Fault surface rupture (set off downstream)
- Soil liquefaction (set off downstream)
- Slope slide (set off downstream)
- Rockfall (set off downstream)
- Tsunami (set off downstream)
- Building collapse (set off downstream)
نظام اور باہمی ربط
کنٹرولز
NS-0آئین اور اصولNS-3خطرے کے ریکارڈ کے UNIs (قواعد، پرانا تقابلی نقشہ، تخصیص کا اختیار)NS-9سیاقی UNIs (تعیناتیاں، مثالیں، پروگرام کی مثالیں)NS-10پالیسیاں اور شقیں (مشین کے پڑھنے کے قابل ذمہ داریاں: تعریف، پابندی، جانچ اور نفاذ)NS-11تصدیق اور نگرانی (شواہد، تصدیق نامے، zero-trust مطابقت کا مشاہدہ)NS-14بیرونی معیارات سے مطابقت اور تقابلی نقشہNRS-F8پیرامیٹرک اور اشاریے پر مبنی خطرے کی منتقلیNRS-F7آفات کے خطرے کی مالیات اور پیشگی طے شدہ مالیاتNRS-H113خطرات کا خاندان: مالیاتی نظام کی کمزوری (NHS-1 soc.financial-system)NRS-H114خطرات کا خاندان: کلی معاشی اور مالیاتی جھٹکے (NHS-1 soc.macro-fiscal)NRS-D1خطرے سے آگاہ ترقی اور منصوبوں کی جانچNRS-H28خطرات کا خاندان: موسمیاتی حالت میں تبدیلیاں (NHS-1 eco.climate-state)
مشاہدہ
- ERA5 reanalysis (Copernicus Climate Data Store) (listed for reference)
- CHIRPS quasi-global gridded precipitation (listed for reference)
- USGS earthquake GeoJSON summary feeds (listed for reference)
- Total public international support for national disaster risk reduction actions (Sendai indicator F-1)
- Direct economic loss attributed to disasters in relation to global GDP
مثالی جغرافیہ
- Western Europe: 152 hexagonal cells
- بارش کی شرح، گزشتہ نصف گھنٹہ (IMERG)، NASA GIBS
- آج رات کی روشنیاں، بندشیں (VIIRS Day/Night Band)، NASA GIBS
- بادلوں کے پار سطحی پانی، 30 m (OPERA DSWx-S1 ریڈار)، NASA GIBS
- Surface soil moisture (SMAP), NASA GIBS
The questions experts ask.
- Are new public investments located and designed with disaster risk in mind?
- How are the benefits of resilience investment, mostly avoided losses, valued in budget decisions?
- How is maintenance funded, so that assets keep their resilience over time?
- How do climate projections enter design standards for long-lived assets?
- How do budget processes track and prioritise resilience spending?
What public investment and resilience means for exposure, loss and capital.
The exposure, loss, scenario and capital views a risk officer, supervisor or ministry of finance would ask for, with the frameworks they report against. Structures follow supervisory and actuarial practice. Values are illustrative: never prices, ratings or advice.
Financing instruments by layer
How retention and transfer instruments could share losses from public investment and resilience, from frequent to extreme.
| Layer | Who holds the risk | Speed of funds | Main limit |
|---|---|---|---|
| Retention and reserves | Budget, contingency funds | Immediate | Size of the budget |
| Contingent credit | Development banks, ministries of finance | Days to weeks | Debt capacity |
| Parametric cover and risk pools | Regional pools, insurers | Days, on a trigger | Basis risk |
| Reinsurance and catastrophe bonds | Reinsurers, capital markets investors | Weeks to months | Cost of capital |
| Residual loss | Households, firms, humanitarian funding | Uncertain | Unfunded |
Risk in the public investment cycle.
Public investment management covers appraisal, selection, implementation and maintenance of capital projects. Disaster risk can enter at each stage: appraisal can include hazard exposure and avoided losses, selection can prioritise resilience, implementation can apply appropriate standards, and maintenance budgets can preserve performance. In practice, avoided losses are hard to see and easy to discount, while upfront costs are visible, so resilience is often under-funded.
Long-lived assets such as bridges, ports and hospitals will face hazard conditions that differ from those in historical records. Design approaches that consider a range of future climates, or that allow later upgrades, can reduce the risk of costly failure. Maintenance is frequently neglected in budgets, and deferred maintenance erodes resilience before a disaster reveals it.
Budget tagging, which identifies resilience and climate-related spending in budgets, helps governments see and manage these investments, though definitions vary.
Financing and investment interact. Governments that understand their contingent liabilities can see more clearly how resilience investment reduces future fiscal exposure, and some disaster finance arrangements reward or require risk reduction, linking ex ante investment with ex post protection.
Methods and their limits.
Cost-benefit analysis
Including avoided losses in project appraisal; results depend on hazard probabilities and discount rates.
Robust decision methods
Testing designs across many futures; demands data and expertise.
Budget tagging
Identifying resilience spending in budgets; classification is partly subjective.
Limits: avoided losses are uncertain and hard to verify, and appraisal results are sensitive to assumptions about future hazards and discounting.
How it is studied, and what the methods cannot say.
- 01Economics and development economicsCost of ex post versus ex ante finance · Household welfare effects · Fiscal impact of disastersApplied here
- 02Decision analysis under uncertaintyChoosing an instrument mix · Trigger threshold choice · Release rules for contingency fundsApplied here
- 03Forecasting and time-series analysisForecast verification for triggers · Seasonal outlooks for drought financeApplied here
سوالات و جوابات۔
Does disaster risk reduction pay for itself?
What is a public investment management assessment?
Why does maintenance matter for disaster finance?
Is resilience investment always worthwhile?
Does GRA appraise projects?
Why is maintenance part of disaster finance?
اس صفحے سے شواہد فراہم کریں۔
Reports is the Consortium's quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.
- EmailGateway GW-GRASend it from this pageEvidence, a correction, a case, a method, a review, a translation or profile input. It arrives tagged with this page, so the editor who owns it receives it.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsGlobal Risks AllianceSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
کبھی بھی ذاتی ڈیٹا، حساس بنیادی ڈھانچے کی تفصیل یا کوئی ایسی چیز نہ بھیجیں جسے شیئر کرنے کا آپ کو حق نہ ہو۔ ہر شراکت استعمال سے پہلے جانچی جاتی ہے؛ اسے بھیجنے سے کوئی تصنیفی یا ادارتی حق حاصل نہیں ہوتا، اور سرپرستی کبھی کوئی نتیجہ نہیں خریدتی۔
Bring an exposure or capital question to the Alliance.
معلومات اور استفسارات آج کھلے ہیں۔ استفسار کو ایک حوالہ نمبر ملتا ہے اور اگلے مرحلے کی نشاندہی ہوتی ہے؛ درخواستیں، ادائیگیاں، کمپیوٹنگ کی تخصیص اور رجسٹریشن صرف اس وقت کھلتی ہیں جب ان کی ٹیم، شرائط اور جائزے کی استعداد موجود ہو۔
قانونی دستاویزات۔
اس سائٹ کے نقشے، ڈیٹا اور اشکال سیاق اور عمومی معلومات کے لیے دکھائے جاتے ہیں۔ یہ مشورہ، پیش گوئیاں یا انتباہات نہیں؛ معلومات کی حدود دستبرداریوں اور ڈیٹا سے متعلق اطلاعات میں بیان کی گئی ہیں۔