Skip to content

GRA · Disaster Risk Finance

Spatial financeWhere capital meets hazard, exposure and transition

Global industry questions

Disaster risk finance is coordinated internationally through multilateral instruments, partnerships and debt architecture. This page lists the global questions the platform follows in 2026.

01Workspace

The workspace for global industry questions.

Programme portfolio.Illustrative interface; not live data.

Disaster Risk Finance · Programme portfolio. Programme portfolio: example names and illustrative values, not a record.

02Scope

Global subject programme in Disaster Risk Finance.

  1. 01

    Risk financing layers

    Retention, contingency and external risk transfer.

  2. 02

    Sovereign contingent liabilities

    Disaster costs and budget exposures.

  3. 03

    Insurance and public pools

    Pools and insurance readiness.

  4. 04

    Anticipatory finance

    Triggers and preparedness evidence.

  5. 05

    Post disaster financing

    Liquidity timing and recovery resources.

  6. 06

    Public investment and resilience

    Risk-sensitive budget and capital projects.

03Geography

Hazards now in Pacific Island states.

Flood water, population density and active fires over Pacific Island states, from NASA GIBS. Each layer carries its own date.

The interactive map needs JavaScript; the layer list and sources are below.

Layers 3

Hazards now, for this page

Latest available

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth

Loading the latest NASA imagery.

Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.

Hazards now, framed on Pacific Island states.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · U.S. Geological Survey · CIESIN/Columbia, NASA SEDAC HBASESources and licences

  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • GPM IMERG precipitation, NASA Precipitation Processing System; distributed by the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Made with Natural Earth. Free vector and raster map data @ naturalearthdata.com. Public domain
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Context on the globe and flat map: coastlines, boundaries, roads and place names from NASA GIBS reference layers (OpenStreetMap data, ODbL, © OpenStreetMap contributors); Blue Marble imagery as an optional base; 3D terrain and the elevation read-out from the ASTER GDEM elevation colour index (5 m to 200 m classes, exaggerated for legibility). Boundaries are drawn as published and imply no position on any territory.
  • Live events: NASA Earth Observatory Natural Event Tracker (EONET); events are indicative and keep their original source links.
  • Live: NASA EONET Events are indicative, not authority warnings.
  • Live: U.S. Geological Survey Events are indicative, not authority warnings.
  • Context: CIESIN/Columbia, NASA SEDAC HBASE. Center for International Earth Science Information Network (CIESIN), Columbia University, and NASA Socioeconomic Data and Applications Center (SEDAC): Global Human Built-up And Settlement Extent (HBASE) 2010; Seto, Guneralp and Hutyra 2012, Global Grid of Probabilities of Urban Expansion to 2030; Global Urban Heat Island (UHI) Data Set, 2013.
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).
  • River discharge forecast, 30 days with range (GloFAS via Open-Meteo): Contains modified Copernicus Emergency Management Service information 2026; not a flood warning.
  • Weather data by Open-Meteo.com (https://open-meteo.com/), licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/).
  • Optional layers (21 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Layers and dates

  • Flood water, 3-day composite: VIIRS Global Flood Product, NASA LANCE · 14 Oct 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Active fires and thermal anomalies: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 Oct 2026
  • Night-time lights, daily: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Oct 2026
  • Precipitation rate, daily mean: GPM IMERG, NASA GES DISC · 12 Oct 2026
  • Land surface temperature, day, 8-day composite: VIIRS NOAA-20 Level 3, 8-day, NASA LANCE · 14 Sep 2026

04Questions

Global questions and references.

QuestionReferenceStatus
How can climate shocks be financed before they happen?Global Shield against Climate RisksOperating through partner programmes
Can debt payments pause after disasters?Climate resilient debt clausesOffered by several lenders since 2023
How should disaster losses be accounted for?Sendai Framework monitoringThrough 2030
How should contingent credit be designed?MDB contingent financing such as Cat DDOsIn use
05Process

How the process runs.

Process explorer · Process

Global industry questions: Policy question to decision

9 steps5 stages1 gate

Process

Global industry questions: Policy question to decision

A priority becomes a question, evidence, a decision case and a limited publication; the competent authority decides, never the programme.

  1. 01 Question

    1. 01A priority becomes a questionStep · Universe; national counterpartsA priority becomes a researchable question with stated criteria. National counterparts own the agenda, data and decisions.
    2. 03Scientific and stakeholder challengeStep · the Global Centre for Risk and Innovation (GCRI); the Global Risks Forum (GRF)Scientific and affected-stakeholder challenge informs mission selection and methods.
  2. 02 Evidence and options

    1. 04Assemble the evidenceStep · GCRIMethods, labelled data and uncertainty are assembled. Every finding carries one of nine evidence labels.
    2. 06Decision case with optionsRecord · The decision owner named in the caseA decision case binds owner, alternatives, evidence and deadline. It needs sensitivity and robustness.
  3. 03 Review and publication

    1. 07G6 · Publication authorisedGate · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    2. 08Publish with method, uncertainty and limitsRecord · ReportsFindings are published with their method, uncertainty and limits. An edition is published after review, not to a calendar.
  4. 04 Outside the programme

    1. 02Competent authority decidesDecision · The competent authorityThe authority or institution decides under its own rules. The authority decides; the programme informs.
    2. 05Action and implementation stay with the ownersActor · The relevant government, operator or licensed institutionDecisions and execution stay with the relevant government, operator or licensed institution. The programme records one only if shared.
  5. 05 Learning

    1. 09Corrections and lessons feed the next agendaStep · UniverseCorrections and lessons feed the next annual agenda. The findings of one year set the mandate of the next.

The Nexus cycle · Decision rights · The programme yearDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

06Status

Work is shown as its record stands.

Programmes are listed as exploring, forming, constituted, active, paused or archived. Country and regional entries appear when a programme record supports them.

08Questions and answers

Questions and answers.

How do I propose work at this level?
Write to Contact or a regional desk. A proposal receives a reference.
Disaster Risk Finance

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.