Skip to content

GRA · Banking Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Reader questions and safeguards

Physical risk analysis in a loan book fails most often on location: collateral recorded by postcode, third-party support without an identified asset, insurance status unknown. This checklist sets out the loan-level fields and the questions an owner answers before a bank’s own credit and model teams can analyse exposure, and it never asks for borrower data to be shared.

02Checklist

Seven questions.

  1. 01

    Injongo

    What problem does the programme address, and for whom?

  2. 02

    Ubungqina

    What hazard, exposure and vulnerability evidence supports it, with what uncertainty?

  3. 03

    Ownership

    Who owns the programme and answers for it?

  4. 04

    Ulawulo

    How are decisions taken, recorded and challenged?

  5. 05

    Idatha

    Which data is used, on what terms, and how is it protected?

  6. 06

    Risks

    What could go wrong, and how is it managed?

  7. 07

    Ukubeka iliso

    How will results be measured and reported?

03Data checklist

Loan-level fields that physical risk analysis needs.

  • Collateral location at building or parcel level, with geocoding precision recorded.
  • Collateral value and valuation date, so hazard-driven value changes can be compared with loan-to-value.
  • Insurance status of the collateral where known, because cover withdrawal changes loss given default.
  • Borrower sector and site for corporate loans, using a classification the bank already reports.
  • Maturity and repricing dates, to set the scenario horizon.
  • Legal entity identifier for corporate counterparties, so exposures aggregate across subsidiaries.
04Inkqubo yokusebenza

Indlela inkqubo eqhuba ngayo.

Process explorer · Process

Reader questions and safeguards: Programme through eight gates

11 steps4 stages8 gates

Inkqubo yokusebenza

Reader questions and safeguards: Programme through eight gates

I-Global Risks Forum (GRF) irekhoda amasango asibhozo onyaka, ngalinye sisigqibo senkqubo; isango elingagqithwanga liyawumisa umsebenzi walo, kwaye igunya elinobuchule ligqiba ngaphandle.

  1. 01 Q1 · Ucwangciso

    1. 01G0 · Inkqubo yonyaka igunyazisiweIsango · I-Global Risks ForumI-GRF igunyazisa igunya lonyaka. Ayizange iyimisele iajenda yesizwe.
    2. 03Route the candidate mission to standardsStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Q2 · Ukulungela nokwakha

    1. 04G1 · Imisebenzi yamkelweIsango · I-Global Risks ForumI-GRF yamkela imisebenzi kunye nezizathu ezirekhodiweyo. Ayinakwamkela umsebenzi ongenamnini uphendulayo.
    2. 05G2 · Idatha nezixhobo ziqinisekisiweIsango · I-Global Risks ForumUkulungiselela ukulungela kuphela xa idatha, abantu nezixhobo ziqinisekisiwe.
    3. 06G3 · Ukwakha kwamkelwe ukuze kuziqheliselweIsango · I-Global Risks ForumI-GRF irekhoda ukuba ukwakha kwamkelwe na ukuze kuziqheliselwe. Isango elingagqithwanga liyawumisa umsebenzi elilawulayo.
  3. 03 Q3 · Iveki Yokusebenza

    1. 07G4 · Ukusebenza ngqo okulawulwayo kugunyazisiweIsango · I-Global Risks ForumI-GRF igunyazisa ukusebenza ngqo okulawulwayo kweVeki Yokusebenza.
    2. 08G5 · Ubungqina butywiniwe kwaye ukuphela komsebenzi kurekhodiweIsango · I-Global Risks ForumUbungqina butywinwa nemvelaphi yabo kwaye ukuphela komsebenzi kuyarekhodwa.
  4. 04 Q4 · Ukunika ingxelo nokuhlaziya

    1. 02Igunya elinobuchule liyagqiba kwaye lithathe amanyatheloUmdlali · Igunya elinobuchuleIgunya elinobuchule liyagqiba kwaye lithathe amanyathelo phantsi kwemithetho yalo. Inkqubo iyalinika ulwazi kwaye ayize ilenzele izigqibo.
    2. 09Uphononongo lwenzululwazi nolwabahleliInyathelo · Abaphononongi nompapashiAbaphononongi abaqeqeshiweyo, abalawulwa ukungqubana kwezinto ezinomdla, nompapashi bagqiba oko kwamkelweyo. Amaziko akanakugqiba isigqibo senzululwazi.
    3. 10G6 · Ukupapashwa kugunyazisiweIsango · I-Global Risks ForumI-GRF igunyazisa ukupapashwa kweziphumo eziphumelele uphononongo lwenzululwazi nolwabahleli. Ayinakupapasha idatha yobuqu.
    4. 11G7 · Renewal reviewedGate · The Global Risks ForumGRF reviews renewal and sets the next cycle’s mandate.

The programme year · The Global Risks Forum · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

05Disclosure link

Fields that later feed public templates.

The BCBS voluntary climate disclosure framework published in June 2025 sets Pillar 3-style templates for physical and transition exposures and financed emissions; PCAF’s third edition of Part A (December 2025) sets the financed-emissions method; IFRS S2, as amended in December 2025, defines what is disclosed from 2027. Collecting the fields once serves all three. Related topic: climate and nature bank risk.

07Imibuzo

Imibuzo neempendulo.

Is the checklist a standard?
No. It is a working aid. Institutions apply their own standards and rules.
Banking Nexus

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.