Skip to content

GRA · Asset Management Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Analytical and data resources

Asset Management Nexus tools connect securities to the physical world. Spatial finance is the core: company and project assets geolocated, matched to their owners and laid over hazard and transition layers, so that exposure can be read for a portfolio without relying on a single score. Tools state their sources, coverage, assumptions and uncertainty; values before release are design values.

01Workspace

The workspace for analytical and data resources.

Pipeline

Analytical and data resources · Workspace WS-19 · Example interface, not a record

One stage waitingGRA · Asset Management Nexus

Stages

  1. Ingest3 sources
  2. Validateschema · licence
  3. Transformversioned
  4. ModelFinancial
  5. Testheld-out
  6. Releasewith limits

Artefacts

Holdings datav6.3VulaOBSERVED
Issuer disclosuresv4.2To checkREPORTED
Emissions estimatesv6.9VulaESTIMATED
Asset location datav1.6To checkDERIVED

Compute quota

share used vs alert level

CPU hours63 used of 80 used limitStorage65 used of 90 used limitGPU hours57 used of 70 used limit
Pipeline.Illustrative interface; not live data.

Asset Management Nexus · Pipeline. Pipeline: example names and illustrative values, not a record.

02Amathuluzi

What is published here.

Maps

Released maps

Open the released maps

Models

Reviewed models and scenarios

Open the reviewed models

Scenarios

Sector scenarios

Open the sector scenarios

03Tool set

Maps, models and scenarios, with their limits.

ToolWhat it showsUmkhawulo
Asset-attribution mapPlants, mines, real estate and infrastructure linked to parent companies through legal entity identifiersCoverage is strongest for heavy industry and weakest for services
Metric crosswalkWhat financed emissions, implied temperature and climate value-at-risk style metrics take as inputExplains metrics; does not compute any portfolio’s figure
Redemption stress sketchHow outflows meet asset liquidity in a fund structureSynthetic fund; real liquidity depends on the market on the day
Scenario selectorWhich NGFS family fits which questionScenarios are narratives with variables, not forecasts
04Inqubo

How the process runs.

Process explorer · Process

Analytical and data resources: Layers to published map

7 steps4 stages1 gate

Inqubo

Analytical and data resources: Layers to published map

Layers enter with their rights, are aligned, analysed and checked for uncertainty, then released after public-safe review; a map is a governed spatial claim.

  1. 01 Data

    1. 01Source layers with their rightsDataset · NXS-GRX (canonical data, provenance and risk)Spatial views of The Global Risks Index (NXS-GRX) products sit under the boundary licence gate. Rights classification sets how a layer may be used.
  2. 02 Harmonise

    1. 02Coordinate reference and boundary versionRecord · NXS-EOP (earth observation and digital twins)The area of interest preserves its coordinate reference system, polygon validity and observation support. Boundary versions are kept.
    2. 03Harmonise units, variables and timeStepUnit metadata, conversion records and transformation logs are required. Alignment is an evidence event, not hidden preprocessing.
  3. 03 Analyse and check

    1. 04Analyse with a recorded processing recipeModel · GIS teamA processing recipe records parameters, calibration, inputs and output lineage. The analysis methods are named in each product’s own record.
    2. 05Spatial uncertainty checkGateSpatial uncertainty is recorded and affects downstream use. A high-uncertainty polygon may suit internal review, not public-safe release.
  4. 04 Publish

    1. 06Spatial metadata bundleRecordThe bundle records boundary type, jurisdiction, geometry version, projection, resolution, source, time window, uncertainty and access class.
    2. 07Public-safe release of the mapDecisionThe output record names the redactions, uncertainty and public-safe reviewer. A map is a governed spatial claim, never merely a picture.

Spatio-temporal intelligence · Data protocols: semantic, jurisdictional and temporal intelligence · NXS-EOPDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The pages cited are design doctrine.

05Scenarios

Where scenario designs are set out.

Scenario families are described at published scenarios. Asset geodata and attribution methods continue at data and disclosure; hazard science at the Global Centre for Risk and Innovation (GCRI) Climate Hazards.

06Build environment

Working with the tools.

Analysis runs in Foundry for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

08Pages

Pages in Analytical and data resources.

09Imibuzo

Questions and answers.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
ImibikoNikela

Nikela ngobufakazi kusuka kuleli khasi.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks AllianceAsset Management NexusFinance and Insurance ReadinessScenario and Stress-Test
Asset Management Nexus: Ukuphathwa Kwezimpahla

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.