Skip to content

GRA · Asset Management Nexus

Spatial financeWhere capital meets hazard, exposure and transition

Analysis and uncertainty

Asset Management Nexus compares the methods investors use to read long-horizon and systemic risk: asset-level attribution, financed-emissions accounting, climate value-at-risk style models, factor analysis and liquidity stress. Each answers a narrower question than its name suggests, and this page states those limits so that results are not read as forecasts or as measures of impact.

01Workspace

The workspace for analysis and uncertainty.

Evidence grading

Analysis and uncertainty · Review wave 2 · Example interface, not a record

Two sources downgradedGRA · Asset Management Nexus

Certainty by criterion

0 low to 100 high

Higher is more certain. Values are examples.

Review queue

  1. R-1Active risksecond reviewer1 d
  2. R-2Top 10 holdings weightsecond reviewer3 d
  3. R-3Days to liquidate 90 pctsecond reviewer2 d
Evidence grading.Illustrative interface; not live data.

Asset Management Nexus · Evidence grading. Evidence grading: example names and illustrative values, not a record.

03Metrics

Portfolio climate metrics, and what each measures.

MetricMeasuresDoes not measure
Financed emissions (PCAF)Emissions attributable to holdingsFinancial risk
Weighted average carbon intensityCarbon intensity of holdings by weightPhysical exposure or transition readiness
Implied temperature riseAlignment of holdings’ targets with pathwaysWhether targets will be met
Climate value-at-riskModelled value change under scenariosIts own model uncertainty unless stated
Physical hazard exposure shareShare of value in high-hazard locationsVulnerability, insurance or adaptation
04Proses

How the process runs.

Process explorer · Process

Analysis and uncertainty: PRISMA 2020 review reporting

10 steps4 stages

Proses

Analysis and uncertainty: PRISMA 2020 review reporting

PRISMA 2020 is a reporting guideline for systematic reviews; the steps follow its checklist, not a mandated sequence, and no Nexus document adopts it.

  1. 01 Plan

    1. 01Registration and protocolRecord · The review teamThe guideline asks for registration details, access to the protocol and any amendments.
    2. 02Eligibility criteriaRecord · The review teamThe guideline asks for the inclusion and exclusion criteria and how studies were grouped.
  2. 02 Find and select

    1. 03Search: sources and strategiesStep · The review teamThe guideline asks for the information sources and the full search strategies. It does not fix which sources are used.
    2. 04Selection of studiesStep · The review teamThe guideline asks how studies were judged eligible, including how many reviewers screened. It does not fix the number of reviewers.
    3. 05Flow diagramRecordThe flow diagram shows the number of records found, the number of studies included and the reasons for exclusion.
  3. 03 Analyse

    1. 06Data collectionStep · The review teamThe guideline asks how data were collected from reports and which data items were sought.
    2. 07Risk of biasStep · The review teamThe guideline asks for the methods and tools used to assess risk of bias.
    3. 08SynthesisModel · The review teamThe guideline asks for the effect measures and the synthesis methods. It does not prescribe meta-analysis.
    4. 09Certainty of evidenceStep · The review teamThe guideline asks for the methods used to assess certainty, and reports the result per outcome. It does not name a grading scale.
  4. 04 Report

    1. 10Review reportRecordThe guideline helps authors report why the review was done, what they did and what they found.

ReportsOutline of an externally published reporting guideline, not a Nexus process and not a record of operation. PRISMA 2020 mainly covers reviews of intervention effects. No Nexus page names it. Every programme is at service level R0.

05Disclosure alignment

What the 2025 amendments changed.

The December 2025 amendments to IFRS S2 let entities limit Scope 3 Category 15 to financed emissions, including assets under management for asset managers, and allow classification systems other than GICS. They apply from 2027 with early application permitted. Nature-related requirements are only proposed: the ISSB plans an exposure draft for a Practice Statement in October 2026. Data governance at data and disclosure.

06Onsekerheid

How uncertainty is reported.

  1. 01

    State assumptions

    Each analysis lists its assumptions and the data it depends on.

  2. 02

    Quantify where possible

    Ranges and confidence are reported alongside central estimates.

  3. 03

    Validate and compare

    Models are checked against observations and, where possible, against other models.

  4. 04

    Publish limits

    What an analysis cannot show is stated beside what it can.

08Vrae

Questions and answers.

Are the methods open?
Method descriptions are public on the STEM Commons. Code and data follow their own licences and access terms, listed in the source register.
VerslaeDra by

Dra bewyse vanaf hierdie bladsy by.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks AllianceAsset Management NexusFinance and Insurance ReadinessScenario and Stress-Test
Batebestuur-nexus

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.