Skip to content

GRA · AI and Financial Model Risk

Spatial financeWhere capital meets hazard, exposure and transition

Global industry questions

This page lists global model and AI risk questions the platform follows in 2026.

01Indawo yokusebenzela

The workspace for global industry questions.

Programme board

Model inventory · Global industry questions · Cycle 3 of 4 · Example interface, not a record

  • Workstreams active
    8Kuyasebenza
  • Milestones due this quarter
    3Beka iliso
  • Decisions pending with owners
    4Beka iliso
  • Open risks
    5
Quarter review dueGRA · AI and Financial Model Risk

Workstreams

by stage

Ukumisela ububanzi02
Decommissioning backlogWS-857 · owner: Independent validation
Inventory completeness reviewWS-931 · owner: Model developer
In delivery02
Model tiering refreshMilestone M2 · slipping
Third-party model due diligenceMilestone M5 · on plan
Uphononongo01
Validation of generative AI modelsIndependent reviewer named
Kuvaliwe01
Ongoing monitoring thresholdsClosure note on record

Amasango

  1. Requestowner named
  2. Scoping noteboundary
  3. Qualifiedinputs
  4. BuildFoundry
  5. Testcontrolled
  6. Publishwith limits
  7. Decisionauthority
Programme board.Illustrative interface; not live data.

AI and Financial Model Risk · Programme board. Programme board: example names and illustrative values, not a record.

02Ubungakanani bomsebenzi

Global subject programme in AI and Financial Model Risk.

  1. 01

    Model risk governance

    Inventory, ownership and validation.

  2. 02

    Credit and pricing models

    Finance-specific automated decisions.

  3. 03

    Generative AI in finance

    Use cases and failure controls.

  4. 04

    Explainability and fairness

    Interpretation, bias and accountability.

  5. 05

    Model monitoring and drift

    Changes over time and review thresholds.

  6. 06

    Human in the loop controls

    Authority and approvals.

03Ijografi

Connected activity in California.

Night lights and population density over California, from NASA GIBS. Each layer carries its own date.

Imephu esebenzisanayo idinga i-JavaScript; uluhlu lweeleya nemithombo zingezantsi.

Iileya 2

Connected activity, for this page

Malunga nale leya
Ubungqina
Kuqwalaselwe
Umthombo
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Umboneleli
NASA LAADS DAAC
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Ukukhanya okulinganiswe ngesathelayithi, kulungiselelwe ukukhanya kwenyanga nomoya
Okutsha ngexesha lokwakha
2026-10-12
Ucaciso
igridi emalunga ne-500 m
Ukungaqiniseki
Ukukhanya kwasebusuku okulinganiswe ngesathelayithi komhla oboniswayo; izibane zingumbonakaliso wokusetyenziswa kombane nokuqhawuka, hayi umlinganiselo wobonelelo okanye wokufikelela.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqikelelwe
Umthombo
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Columbia University))
Umboneleli
NASA SEDAC (CIESIN, Columbia University)
Ilayisensi
CC BY 4.0
Uhlelo
null; Census-based estimate, static (2020)
Ucaciso
igridi emalunga ne-1 km
Ukungaqiniseki
Uqikelelo olusekelwe kubalo-bantu lwabantu kwikhilomitha-sikwere nganye ngo-2020, luboniswe njengemeko yokuchaphazeleka; asilonani labantu abachatshazelwe yiyo nayiphi na ingozi.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe (amafu ashiya izikhewu)
Umthombo
VIIRS Global Flood Product (NASA LANCE)
Umboneleli
NASA LANCE
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Ukufunyanwa ngesathelayithi; amafu ashiya izikhewu
Okutsha ngexesha lokwakha
2026-10-14
Ucaciso
igridi emalunga ne-250 m
Ukungaqiniseki
Ukufunyanwa ngesathelayithi; amafu ashiya izikhewu. I-raster yesathelayithi okanye yemodeli njengoko umboneleli eyipapasha. Amafu, izikhewu zokugubungela neempazamo zokufumana zishiya izikhewu nengxolo; amaxabiso zizalathisi, awayomilinganiselo kwindawo ethile.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe (amafu angapheliyo asashiya izikhewu)
Umthombo
VIIRS NOAA-20 Level 3, 8-day (NASA LANCE)
Umboneleli
NASA LANCE
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
iintsuku ezi-8; Umxube wesathelayithi weentsuku ezi-8; amafu angapheliyo asashiya izikhewu
Okutsha ngexesha lokwakha
2026-09-14
Ucaciso
igridi emalunga ne-1 km
Ukungaqiniseki
Ubushushu bomphezulu womhlaba ngesathelayithi kwiintsuku ezi-8 ezigqibela ngomhla oboniswayo, isalathisi sokuchaphazeleka bubushushu; hayi ubushushu bomoya, isalathiso sobushushu okanye isilumkiso sobushushu.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe
Umthombo
VIIRS NOAA-20 corrected reflectance (NASA LANCE)
Umboneleli
NASA LANCE
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Umfanekiso wesathelayithi
Okutsha ngexesha lokwakha
2026-10-14
Ucaciso
igridi emalunga ne-250 m
Ukungaqiniseki
Umfanekiso wesathelayithi. I-raster yesathelayithi okanye yemodeli njengoko umboneleli eyipapasha. Amafu, izikhewu zokugubungela neempazamo zokufumana zishiya izikhewu nengxolo; amaxabiso zizalathisi, awayomilinganiselo kwindawo ethile.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov

Okutsha okukhoyo

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © abanegalelo kwi-OpenStreetMap (ODbL) · Natural Earth

Kulayishwa imifanekiso yamva nje ye-NASA.

Rhuqa ukuze uhambise. Ctrl okanye ⌘ uze ujikelezise, chophela okanye usebenzise amaqhosha ukusondeza; beka isalathisi phezu kwento ukuze ubone amaxabiso aphantsi kwaso; ukubuyisela kubuyela kummandla.

Connected activity, framed on California.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · NASA/NOAA VIIRS · CIESIN/Columbia, NASA SEDAC HBASE · U.S. Geological SurveySources and licences

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Yenziwe nge-Natural Earth. Idatha yemephu ye-vector ne-raster esimahla @ naturalearthdata.com. Yeyoluntu
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imifanekiso ivela kwi-NASA GIBS. Imibala izotywe ngokutsha ukusuka kwimephu yemibala epapashiweyo; amaxabiso afakwe umndilili kwiiseli ezineheksagoni apho aboniswa khona (iguqulwe). Idatha evulekileyo ye-NASA
  • Imeko kwigloubhu nakwimephu ethe tyaba: unxweme, imida, iindlela namagama eendawo avela kwiileya zesalathiso ze-NASA GIBS (idatha ye-OpenStreetMap, ODbL, © abanegalelo kwi-OpenStreetMap); imifanekiso ye-Blue Marble njengesiseko esikhethwayo; umhlaba we-3D nokufundwa kokuphakama okuvela kwisalathiso semibala sokuphakama se-ASTER GDEM (iiklasi ezisuka kwi-5 m ukuya kwi-200 m, zandisiwe ukuze zifundeke). Imida izotywe njengoko ipapashiwe kwaye ayibonisi kuma kuwo nawuphi na ummandla.
  • Iziganeko ezenzeka ngoku: NASA Earth Observatory Natural Event Tracker (EONET); iziganeko zingumqondiso nje kwaye zigcina amakhonkco azo emithombo yokuqala.
  • Observed (EO): NASA/NOAA VIIRS (Suomi NPP). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • Context: CIESIN/Columbia, NASA SEDAC HBASE. Center for International Earth Science Information Network (CIESIN), Columbia University, and NASA Socioeconomic Data and Applications Center (SEDAC): Global Human Built-up And Settlement Extent (HBASE) 2010; Seto, Guneralp and Hutyra 2012, Global Grid of Probabilities of Urban Expansion to 2030; Global Urban Heat Island (UHI) Data Set, 2013.
  • Ngoku: Iziganeko ze-U.S. Geological Survey zingumqondiso nje, azizizo izilumkiso ezisemthethweni.
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • Iileya ezikhethwayo (imithombo emi-4 kuluhlu lweeleya: ephilayo, uqikelelo, eqwalaselweyo nemeko) zibonisa isincomo somboneleli wazo kwimephu nalapha xa zivuliwe; uqikelelo sisiphumo semodeli kwaye izalathisi ezivelisiweyo ziqikelelo.

Iileya nemihla

  • Night-time lights, daily: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Oct 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Flood water, 3-day composite: VIIRS Global Flood Product, NASA LANCE · 14 Oct 2026
  • Land surface temperature, day, 8-day composite: VIIRS NOAA-20 Level 3, 8-day, NASA LANCE · 14 Sep 2026
  • True colour: VIIRS NOAA-20 corrected reflectance, NASA LANCE · 13 Oct 2026

04Imibuzo

References and status.

UmbuzoReferenceImeko
How should US banks manage model risk?Interagency guidance SR 26-2Issued April 2026; supersedes SR 11-7
How should UK banks manage model risk?PRA SS1/23In force since May 2024
Which AI uses in finance are high-risk in the EU?EU AI Act as amendedCredit-scoring duties from 2 December 2027
How can organisations govern AI risk?NIST AI RMFVoluntary, 2023
05Inkqubo yokusebenza

Indlela inkqubo eqhuba ngayo.

Process explorer · Process

Global industry questions: Programme through eight gates

11 steps4 stages8 gates

Inkqubo yokusebenza

Global industry questions: Programme through eight gates

I-Global Risks Forum (GRF) irekhoda amasango asibhozo onyaka, ngalinye sisigqibo senkqubo; isango elingagqithwanga liyawumisa umsebenzi walo, kwaye igunya elinobuchule ligqiba ngaphandle.

  1. 01 Q1 · Ucwangciso

    1. 01G0 · Inkqubo yonyaka igunyazisiweIsango · I-Global Risks ForumI-GRF igunyazisa igunya lonyaka. Ayizange iyimisele iajenda yesizwe.
    2. 03Route the candidate mission to standardsStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Q2 · Ukulungela nokwakha

    1. 04G1 · Imisebenzi yamkelweIsango · I-Global Risks ForumI-GRF yamkela imisebenzi kunye nezizathu ezirekhodiweyo. Ayinakwamkela umsebenzi ongenamnini uphendulayo.
    2. 05G2 · Idatha nezixhobo ziqinisekisiweIsango · I-Global Risks ForumUkulungiselela ukulungela kuphela xa idatha, abantu nezixhobo ziqinisekisiwe.
    3. 06G3 · Ukwakha kwamkelwe ukuze kuziqheliselweIsango · I-Global Risks ForumI-GRF irekhoda ukuba ukwakha kwamkelwe na ukuze kuziqheliselwe. Isango elingagqithwanga liyawumisa umsebenzi elilawulayo.
  3. 03 Q3 · Iveki Yokusebenza

    1. 07G4 · Ukusebenza ngqo okulawulwayo kugunyazisiweIsango · I-Global Risks ForumI-GRF igunyazisa ukusebenza ngqo okulawulwayo kweVeki Yokusebenza.
    2. 08G5 · Ubungqina butywiniwe kwaye ukuphela komsebenzi kurekhodiweIsango · I-Global Risks ForumUbungqina butywinwa nemvelaphi yabo kwaye ukuphela komsebenzi kuyarekhodwa.
  4. 04 Q4 · Ukunika ingxelo nokuhlaziya

    1. 02Igunya elinobuchule liyagqiba kwaye lithathe amanyatheloUmdlali · Igunya elinobuchuleIgunya elinobuchule liyagqiba kwaye lithathe amanyathelo phantsi kwemithetho yalo. Inkqubo iyalinika ulwazi kwaye ayize ilenzele izigqibo.
    2. 09Uphononongo lwenzululwazi nolwabahleliInyathelo · Abaphononongi nompapashiAbaphononongi abaqeqeshiweyo, abalawulwa ukungqubana kwezinto ezinomdla, nompapashi bagqiba oko kwamkelweyo. Amaziko akanakugqiba isigqibo senzululwazi.
    3. 10G6 · Ukupapashwa kugunyazisiweIsango · I-Global Risks ForumI-GRF igunyazisa ukupapashwa kweziphumo eziphumelele uphononongo lwenzululwazi nolwabahleli. Ayinakupapasha idatha yobuqu.
    4. 11G7 · Renewal reviewedGate · The Global Risks ForumGRF reviews renewal and sets the next cycle’s mandate.

The programme year · The Global Risks Forum · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

06Imeko

Work is shown as its record stands.

Programmes are listed as exploring, forming, constituted, active, paused or archived. Country and regional entries appear when a programme record supports them.

08Imibuzo neempendulo

Imibuzo neempendulo.

How do I propose work at this level?
Write to the contact form or a regional desk. A proposal receives a reference.
I-AI noMngcipheko weModeli yezeMali

Bring an exposure or capital question to the Alliance.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.